The challenge in these five writ petitions being almost identical and based on same grounds, those were taken up together for an analogous hearing and are being disposed of by this common ...
Page No.# 1/18
GAHC010037462024
undefined
THE GAUHATI HIGH COURT
(HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)
Case No. : WP(C)/1069/2024
BALEN ROY MEDHI
S/O- LATE RAJMOHAN ROYMEDHI,
R/O- BHARALUMUKH, KUMARPARA, KRB ROAD, GHY-09,
P.S- BHARALUMUKH, DIST- KAMRUP (M), ASSAM,
PIN-781009
VERSUS
THE STATE OF ASSAM AND 4 ORS
REP. BY THE PRINCIPAL SECRETARY TO THE GOVT. OF ASSAM, ANIMAL
HUSBANDRY AND VETERINARY DEPARTMENT
DISPUR, ASSAM, GHY-06
2:THE DIRECTOR
OF ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
ASSAM
CHENIKUTHI
GUWAHATI-03
3:THE BID PROCESS MANAGEMENT COMMITTEE
REP. BY ITS CHAIRMAN
OFFICE OF THE DIRECTOR OF ANIMAL HUSBANDRY AND VETERINARY
DEPARTMENT
ASSAM
CHENIKUTHI
GUWAHATI-03
ASSAM
4:THE DISTRICT ANIMAL HUSBANDRY AND VETERINARY OFFICER
NALBARI
ASSAM Page No.# 1/18
GAHC010037462024
undefined
THE GAUHATI HIGH COURT
(HIGH COURT OF ASSAM, NAGALAND, MIZORAM AND ARUNACHAL PRADESH)
Case No. : WP(C)/1069/2024
BALEN ROY MEDHI
S/O- LATE RAJMOHAN ROYMEDHI,
R/O- BHARALUMUKH, KUMARPARA, KRB ROAD, GHY-09,
P.S- BHARALUMUKH, DIST- KAMRUP (M), ASSAM,
PIN-781009
VERSUS
THE STATE OF ASSAM AND 4 ORS
REP. BY THE PRINCIPAL SECRETARY TO THE GOVT. OF ASSAM, ANIMAL
HUSBANDRY AND VETERINARY DEPARTMENT
DISPUR, ASSAM, GHY-06
2:THE DIRECTOR
OF ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
ASSAM
CHENIKUTHI
GUWAHATI-03
3:THE BID PROCESS MANAGEMENT COMMITTEE
REP. BY ITS CHAIRMAN
OFFICE OF THE DIRECTOR OF ANIMAL HUSBANDRY AND VETERINARY
DEPARTMENT
ASSAM
CHENIKUTHI
GUWAHATI-03
ASSAM
4:THE DISTRICT ANIMAL HUSBANDRY AND VETERINARY OFFICER
NALBARI
ASSAM
Page No.# 2/18
PIN-781335
5:BABITA BORAH
SIVAMANDIR PATH
KHANAPARA
GUWAHATI-22
ASSA
Advocate for the Petitioner : MR. J KALITA, DIKSHITA DEKA
Advocate for the Respondent : GA, ASSAM, MS. D J BORAH (R-5),MR. S CHETRY (R-5),MR. B
CHETRI (R-5),MS. M M KATOKI ( for R/p No. 1 to 4 )
WP(C)/1178/2024
BALEN ROY MEDHI
S/O LT. RAJMOHAN ROYMEDHI
R/O BHARALUMUKH
KUMARPARA
K.R.B. ROAD
GHY-09
P.S.-BHARALUMUKH
DIST-KAMRUP (M)
ASSAM
PIN-781009
VERSUS
THE STATE OF ASSAM AND 4 ORS
REPRESENTED BY THE PRINCIPAL SECRETARY
GOVT OF ASSAM
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
DISPUR
ASSAM
GHY-06
2:THE DIRECTOR
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
ASSAM
CHENIKUTHI
GUWAHATI-03
3:THE BID PROCESS MANAGEMENT COMMITTEE
REPRESENTED BY ITS CHAIRMAN
Page No.# 3/18
OFFICE OF THE DIRECTOR
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
CHENIKUTHI
GUWAHATI-03
ASSAM
4:THE DISTRICT ANIMAL HUSBANDRY AND VETERINARY OFFICER
NALBARI
NALBARI
ASSAM
PIN-781335
5:DIGANTA BORAH
SIVAMANDIR PATH
KHANAPARA
GUWAHATI-22
ASSAM
------------
Advocate for : MR. J KALITA
Advocate for : GA
ASSAM appearing for THE STATE OF ASSAM AND 4 ORS
WP(C)/998/2024
BALEN ROY MEDHI
S/O LT. RAJMOHAN ROY MEDHI R/O BHARALUMUKH KUMARPARA
K.R.B. ROAD
GHY-09
P.S. BHARALUMUKH
DIST. KAMRUP (M)
ASSAM PIN-781009
VERSUS
THE STATE OF ASSAM AND 4 ORS
REP. BY THE PRINCIPAL SECRETARY
GOVT. OF ASSAM
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
DISPUR
ASSAM
GUWAHATI-06
2:THE DIRECTOR
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
Page No.# 4/18
ASSAM
CHENIKUTHI
GUWAHATI-3.
3:THE BID PROCESS MANAGEMENT COMMITTEE
REPRESENTED BY ITS CHAIRMAN
OFFICE OF THE DIRECTOR
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
CHENIKUTHI
GUWAHATI-03
ASSAM
4:THE DISTRICT ANIMAL HUSBANDRY AND VETERINARY OFFICER
NALBARI
NALBARI
ASSAM
PIN-781335
5:HEMAN KUMAR BORAH
SIVAMANDIR PATH
KHANAPARA
GUWAHATI-22
ASSAM
------------
Advocate for : MR. J KALITA
Advocate for : GA
ASSAM
appearing for THE STATE OF ASSAM AND 4 ORS
WP(C)/996/2024
BALEN ROY MEDHI
S/O LT. RAJMOHAN ROY MEDHI
R/O BHARALUMUKH
KUMARPARA
K.R.B. ROAD
GHY-09
P.S. BHARALUMUKH
DIST. KAMRUP (M)
ASSAM
PIN-781009
Page No.# 5/18
VERSUS
THE STATE OF ASSAM AND 4 ORS
REP. BY THE PRINCIPAL SECRETARY
GOVT. OF ASSAM
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
DISPUR
ASSAM
GUWAHATI-06
2:THE DIRECTOR
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
ASSAM
CHENIKUTHI
GUWAHATI-3.
3:THE BID PROCESS MANAGEMENT COMMITTEE
REPRESENTED BY ITS CHAIRMAN
OFFICE OF THE DIRECTOR
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
CHENIKUTHI
GUWAHATI-03
ASSAM
4:THE DISTRICT ANIMAL HUSBANDRY AND VETERINARY OFFICER
NALBARI
NALBARI
ASSAM
PIN-781335
5:HEMAN KUMAR BORAH
SIVAMANDIR PATH
KHANAPARA
GUWAHATI-22
ASSAM
------------
Advocate for : MR. J KALITA
Advocate for : GA
ASSAM appearing for THE STATE OF ASSAM AND 4 ORS
Page No.# 6/18
WP(C)/1071/2024
BALEN ROY MEDHI
S/O- LATE RAJMOHAN ROYMEDHI
R/O- BHARALUMUKH
KUMARPARA
KRB ROAD
GHY-09
P.S- BHARALUMUKH
DIST- KAMRUP (M)
ASSAM
PIN-781009
VERSUS
THE STATE OF ASSAM AND 4 ORS
REP. BY THE PRINCIPAL SECRETARY TO THE GOVT. OF ASSAM
ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT DISPUR
ASSAM
GHY-06
2:THE DIRECTOR
OF ANIMAL HUSBANDRY AND VETERINARY DEPARTMENT
ASSAM CHENIKUTHI
GUWAHATI-03
3:THE BID PROCESS MANAGEMENT COMMITTEE
REP. BY ITS CHAIRMAN
OFFICE OF THE DIRECTOR OF ANIMAL HUSBANDRY AND VETERINARY
DEPARTMENT
ASSAM
4:THE DISTRICT ANIMAL HUSBANDRY AND VETERINARY OFFICER
NALBARI ASSAM
PIN-781335
5:DIGANTA BORAH
SIVAMANDIR PATH
KHANAPARA
GUWAHATI-22
ASSAM
------------
Advocate for : MR. J KALITA
Advocate for : GA
ASSAM appearing for THE STATE OF ASSAM AND 4 ORS
Page No.# 7/18
BEFORE
HON'BLE MR. JUSTICE SANJAY KUMAR MEDHI
For the Petitioner : Shri J Kalita, Advocate.
For the Respondents : Shri D Nath, Sr. Govt. Advocate, Assam,
Shri B Chetri, Advocate, R/5.
Date of Hearing : 10.09.2024.
Date of Judgment : 27.09.2024.
JUDGMENT & ORDER
The challenge in these five writ petitions being almost identical and based on
same grounds, those were taken up together for an analogous hearing and are being
disposed of by this common judgment and order. The matters pertain to a tender
process for construction of Assam Type Sub-Centre Building under Animal Husbandry
& Veterinary Department, Assam. The petitioner in each of the five cases, however, is
the same.
2. As per the facts projected, a Notice Inviting Tender (NIT) was issued on
06.04.2023 by the AH & Vety. Department for construction of Assam Type Sub-Centre
Building with Electrification, Water Supply and Sanitary Works etc. at various locations
in the district of Nalbari. In the said tender document, there is a specific clause under
the Qualification Criteria, being Clause 2.A.(g) which provides that a bidder who
quotes the rate beyond 15% below the approved rate would have to submit
justification with proper rate analysis and photographic evidence. It is the case of the
petitioner that in all the writ petitions, the private respondent no. 5 had quoted rate
which was beyond 15% below and accordingly, under the aforesaid clause,
justification was sought for. The justification was purportedly given and after
Page No.# 8/18
consideration of the same, the bids of the private respondent no. 5 in each of the
cases were accepted and accordingly, Work Orders were issued on 06.01.2024.
Sensing some irregularity and foul play with regard to the bid of the private
respondent, details of the justification was sought for under the Right to Information
Act, 2005 (RTI Act). It was revealed that the respondent no. 5 justified the price by
annexing a quotation of one Maa Enterprise from whom construction materials would
be purchased. In the said quotation, a GSTIN number was given. On further enquiries,
the petitioner could learn that the said GISTIN number was not pertaining to Maa
Enterprise and it was of one Dhanjit Gupta with trade name, M/S Joy Maa Hardware
and Sanitary. The petitioner had raised objection before the Department which was
not paid hid to and it is averred that the formal Work Order was actually published on
13.02.2024. Being aggrieved by the aforesaid process of allotment of the works, the
present writ petitions have been filed.
3. I have heard Shri J Kalita, learned counsel for the petitioner in all the cases. I
have also heard Shri D Nath, learned Sr. Government Advocate, Assam as well as Shri
B Chetri, learned counsel for the respondent no. 5 in all the writ petitions.
4. Before recording the submissions, it would be convenient to give the details of
the works involved with the writ petitions in a tabular form:
WP(C) Works Description Estimated Cost (Rs.)
996/2024 Construction of Assam Type Sub- Centre Building
with electrification, Water supply and sanitary
works etc. at Naharbari in Nalbari District.
33,71,000.00
998/2024 Construction of Assam Type Sub- Centre Building
with electrification, Water supply and sanitary
33,71,000.00
Page No.# 9/18
works etc. at Hati Namati in Nalbari District.
1069/2024Construction of Assam Type Sub- Centre Building
with electrification, Water supply and sanitary
works etc. at Allia in Nalbari District.
33,71,000.00
1071/2024Construction of Assam Type Sub- Centre Building
with electrification, Water supply and sanitary
works etc. at Balitara in Nalbari District.
33,71,000.00
1178/2024Construction of Assam Type Sub- Centre Building
with electrification, Water supply and sanitary
works etc. at Sagarkuchi in Nalbari District.
33,71,000.00
5. Shri Kalita, learned counsel for the petitioner has submitted that Clause 2.A.(g)
of the Tender Document though provides for an exception to accept bids which are
15% below, the same is subject to submission of proper justification with rate
analysis, photographic evidence etc. and even thereafter, the Bid Process Management
Committee (the Committee) has the right to reject the bid if such justifications are
found incorrect after physical verification. It is submitted that the conditions attached
to the aforesaid clause are required to be adhered to in a meticulous manner.
6. By drawing the attention of this Court to the information regarding the GSTIN of
Maa Enterprise, whose quotation was one of the justifications, it is submitted that the
GSTIN number which was given as 18AQCPG9499H1ZA belongs to one Dhanjit Gupta
of M/S Joy Maa Hardware and Sanitary. He submits that a forged document was taken
into recourse by the private respondent no. 5. By drawing the attention of this Court
to the affidavit-in-opposition of the Department filed on 15.07.2024, it is submitted
Page No.# 10/18
that in the same, a clarification dated 11.12.2023 from Maa Enterprise has been
annexed. The said clarification was given to the respondent no. 5 whereby, it was
stated that the quotation of the GSTIN number was inadvertent as the said shop did
not have any GSTIN. It is submitted that such an explanation was wholly unacceptable
as no retailer of construction materials, like rod, sand, cement etc. can do business
without any GSTIN.
7. The learned counsel for the petitioner has also dealt with a verification reports
submitted by the Junior Engineer (HQ) which are all of the same date i.e. 09.10.2023.
Along with the said reports, certain photographs have been annexed regarding the
materials mobilized. It is submitted that apart from there being no Geo-tag, all the
photographs are one and the same. The learned counsel has also taken exception of
the progress report dated 28.02.2024 which has been annexed as Annexure-10 to the
said affidavit-in-opposition as per which, approximately, 70% of physical progress has
been made. It is submitted that the work order was published only on 13.02.2024 as
would appear from Annexure-A5 and it was not possible to achieve such progress
within 2 weeks.
8. By drawing the attention of this Court to the affidavit-in-opposition filed by the
respondent no. 5, the learned counsel for the petitioner has submitted that it has been
admitted that the GSTIN number was wrong and that the seller was not having any
such GSTIN at all. He has also raised his grievance with regard to the aspect of
releasing running bills on 21.05.2024 in spite of the interim order passed by this Court
on 06.03.2024. It is submitted that such action is clearly contemptuous and
accordingly, suo moto action is required to be taken by this Court. By referring to the
affidavit-in-reply fled by the petitioner on 02.08.2024 to the affidavit-in-opposition of
the respondent no. 5, he has submitted that the records would reveal that the same
justification has been given for all the parties. In this regard, he has referred to the
Page No.# 11/18
documents annexed as Annexure-A7.
9. The learned counsel for the petitioner accordingly submits that the works could
not have been proceeded on the basis of a fraud involved in such allotment and even
assuming that certain portions of the work have been executed, the same cannot
construe 70% progress as sought to be projected. He accordingly submits that the
work orders are required to be interfered with and the balance of the works are
required to be allotted to the petitioner in accordance with law.
10. Per contra, Shri Nath, learned Sr. Government Advocate has defended the action
for allotment of the works in question. At the outset, he has raised a preliminary
objection on the maintainability of the writ petitions. It is submitted that the petitioner
is not the L2 bidder in all the cases and there are other bidders between the
respondent no. 5 and the petitioner who have not been made party respondents. It is
accordingly submitted that no relief can be claimed by the petitioner.
11. On the merits of the case, more specifically with regard to the requirement of
GSTIN registration, the learned State Counsel has referred to Clause 2.A.(d)(ii) which
necessitates GSTIN registration of the bidder. It is submitted that there is no allegation
against the bidder (respondent no. 5) regarding not having a GSTIN registration and
therefore, the present challenge is not maintainable. In this regard, he has drawn the
attention of this Court to the registration of the respondent no. 5 under the GST which
was duly verified.
12. By drawing the attention of this Court to the affidavit-in-opposition filed on
15.07.2024, the learned State Counsel has submitted that the verification was done on
10.09.2023 as per the decision dated 15.09.2023 and based on the said verification
reports, further steps were taken for allotment of the works. It is submitted that the
Page No.# 12/18
work orders were issued on 06.01.2024 and the date relied upon by the petitioner by
referring to Annexure-5 i.e. 13.02.2024 has nothing to do with the actual date of
issuance. He has also drawn the attention of this Court to the photographs of the
construction undertaken and has submitted that as per the progress report dated
28.02.2024, 70% of the works have been completed. He has also submitted that the
Department has taken into consideration the explanation provided that GSTIN of Maa
Enterprise was inadvertently quoted.
13. The learned State Counsel has submitted that in matters relating to tender, the
role of the Court is circumscribed and only when there is gross illegality apparent on
the face of it, there may be a scope for interfering with such process. On the aspect of
restraint to be maintained while exercising powers of judicial review, the learned State
Counsel has relied on the judgments of Afcons Infrastructure Ltd. Vs. Nagpur Metro
Rail Corporation Ltd. and Anr., reported in (2016) 16 SCC 818 and Bharat Coking
Coal Ltd. Vs. AMR Dev Prabha & Ors., reported in (2020) 16 SCC 759.
14. On the issue of payment being released, the learned State Counsel has
submitted that the interim order was passed by this Court on 06.03.2024 by which
time, 70% of the work was done and therefore, the payment has been made. He has,
however, informed that after the interim order, the constructions have been stopped.
15. Shri B Chetri, learned counsel appearing for the respondent no. 5 in all the
cases has endorsed the submissions made on behalf of the Department. He has
submitted that under Clause 11.1(viii), the GSTIN registration by a bidder is required
to be submitted. Such requirement has also given under Clause 2.A.(d)(ii) and the
bidder has duly fulfilled the said condition. He has defended the action that while
giving the justification for quoting beyond 15% below the approved rate, a
communication of the supplier was given in which by inadvertence, a GSTIN number
Page No.# 13/18
was provided. It is submitted that there is no requirement that the supplier is required
to have a GSTIN number. He has also relied upon a Gazette Notification dated
03.06.2019 as per which, a person engaged in exclusive supply of goods whose
aggregate turnover in a financial year does not exceed to Rs. 40 lakhs is exempted
from registration under the Assam Goods and Services Tax Act, 2017. It is submitted
that the respondent no. 5 was found to be the lowest bidder and accordingly, a
decision was taken in the meeting dated 13.10.2023. He has also referred to the
communication dated 11.12.2023 by Maa Enterprise on the issue of GSTIN and the
clarification given by the petitioner on 12.12.2023. It is submitted that the work had
progressed and 80% has been achieved. In support of his submissions, he has relied
upon a judgment of this Court dated 18.02.2022 in the case of M/S Naga Builders
and Suppliers Vs. State of Nagaland & Ors., passed in WP(C)/96/2022. In the
aforesaid case, this Court has laid down that when a challenge is made by an
unsuccessful bidder, the Court would be loath to interfere. He, however, clarifies that
so far as the WP(C)/998/2024 is concerned, due to certain boundary dispute, no
construction could be made and therefore, no amount has been released.
16. Shri Kalita, learned counsel for the petitioner, in his rejoinder has submitted that
the progress report dated 28.02.2024 showing 70% of progress is wholly
unacceptable document inasmuch as the work orders were actually published much
later. With regard to the so-called explanation given by Maa Enterprise, the learned
counsel has submitted that the communication does not bear any seal or is given on
any letter-head and the same is simply a typed copy. It is reiterated that the
photographs given to justify the verification reports in all the five cases are exactly the
same which would raise a serious doubt on the bona fide of such exercise. By
referring to the case of Bhaba Dev Mahanta Vs. State of Assam & Ors., reported in
2022 (6) GLT 698, the learned counsel has submitted that all the clauses of the
tender document are required to be read independently. As regards the preliminary
Page No.# 14/18
objection raised on behalf of the Department on the issue of maintainability, the
learned counsel has submitted that though in three cases, there are two more bidders
above the petitioner, the rates quoted by them was beyond 15% which were also
without justification and therefore, they are not necessary parties. He has also
informed that in WP(C)/998/2024, the petitioner is the L2 bidder and therefore, all the
writ petitions are maintainable.
17. The rival submissions have been duly considered and the materials placed on
record have also been carefully examined.
18. To examine the issue which revolves upon the clause relating to a quotation
beyond 15% below the approved rate, it would be convenient if the said provision i.e.
2.A.(g) is extracted hereunder:
“(g) The bidder who quotes the rate equivalent to beyond 15% below the
current DSR should submit the justification of quoting the rate in details
with proper rate analysis along with photographic evidences with their Bid
and the Bid process Management Committee has right to reject the Bid if
his justifications are found incorrect after physical verification.”
19. A bare reading of the aforesaid provision would clearly reveal that an exception
has been carved out to consider a rate which is beyond 15% below the current DSR.
The said consideration is subject to a proper justification of the rate in details with
proper rate analysis and photographic evidence and even thereafter, the Committee
has the right to reject the bid if the justifications are found incorrect after physical
verification. The objective of such a clause is apparent which is to ensure that the
quality of the work does not suffer in any way and in certain cases where works are
allotted on exceptionally low rate, it is found that the works are abandoned mid way
Page No.# 15/18
which adversely affects the public interest. The aforesaid clause is a balance to the
process adopted for distribution of State largesse by following a fair and transparent
procedure as well as to protect the public interest wherein, an exceptionally low rate
beyond 15% is also considered which, however, is subject to strict conditions as
mentioned above. While consideration strictly in accordance with the provision is
permitted, the same is required to be examined whether in the instant cases, the
justification put forward by the respondent no. 5 towards the rate quoted is in
accordance with law. The respondent no. 5 has justified the rate by relying upon a
quotation from one Maa Enterprise which had given a GSTIN number. It, however,
transpires that the GSTIN number did not belong to Maa Enterprise but is of another
entity, which is not at all connected. The respondent no. 5 has tried to explain the
position by a further clarificatory letter from Maa Enterprise that the said Enterprise
did not have any GSTIN number. This Court, however finds force in the contentions
advanced on behalf of the petitioner that such explanation is not acceptable inasmuch
as the said clarificatory letter does not bear any seal and is not even issued in the
letter-head of Maa Enterprise.
20. With regard to the submissions made on behalf of the respondent no. 5 by
referring to the Gazette Notification dated 03.06.2019, though certain entities are
given exemption under the Assam GST Act of 2017, there is nothing on record to show
that Maa Enterprise would fall within the exempted clause. A retailer cannot be
presumed to fall within the exception from the requirement of GST registration without
any materials placed on record, more so when the very purpose of the Act of 2017 is
to bring all business under the purview of the Act.
21. As regards the verification to be done for invoking the aforesaid clause of the
tender pertaining to accepting rates below 15%, it appears that the Junior Engineer
had made a verification by purportedly making a field visit which was communicated
Page No.# 16/18
to the Executive Engineer on 09.10.2023. Along with the said communication, certain
photographs have been annexed. A bare perusal of the photographs which have been
enclosed to an identically written verification report would show that all the
photographs in all the five cases are exactly the same. It is absolutely intriguing as to
how the works which pertain to various locations in the district of Nalbari could be
justified with certain materials which have been stacked in one location. Apart from
their being no Geo-tag in the photographs enclosed, the bare facts that all the
photographs are same raise serious questions on the bona fide. Apart from the aspect
that the photographs which have been annexed to the reports dated 09.10.2023 being
similar for all the five bidders, the same would not have any bearing with the
justification which is envisaged under Clause 2.A(g). It is also failed to be understood
as to how the similar/same photographs could be given for making a field verification
pertaining to five works of different locations.
22. There is another aspect of the matter which has come to the notice of this
Court. On a close perusal of all the writ petitions, it appears that the respondent no. 5
who are different persons in all the cases have one address which is “Sivamandir Path,
Khanapara, Guwahati-22, Assam”. It clearly appears that each of the respondent no. 5
belong to the same family. An explanation has been given by the learned State
Counsel that the works are different and none of the family members offered bid for
the same work. It is, however, noticed that the respondent no. 5 for the works at Hati
Naharbari and Hati Namati [WP(C)/996 and 998/2024, respectively] is the same who
has been allotted the works. Though there may not be a strict restriction on each of
the family members to do business and participate in different tenders, in the instant
case, the works are the same which are, however, spread out in various locations in
the district of Nalbari. The rates which have been offered by the respondent no. 5 in
all the five works involved are all beyond 15% below which obviously require a
justification under the aforesaid clause. Interestingly, all the justifications are identical
Page No.# 17/18
which had relied upon a quotation from one Maa Enterprise giving a particular GSTIN
number. It is, however, not in dispute that the said GSTIN number is not of Maa
Enterprise but of a different entity and the explanation which had given later on is that
Maa Enterprise does not even have a GSTIN number. Without even going into that
aspect as to whether a sale of construction materials on huge quantity can be done by
an entity without a GSTIN number, the nature of clarification given by a document
which does not even bear a seal and not the letter-head of the entity, the Department
was under a higher obligation to make proper verification. As observed above, the
aforesaid clause considering a bid which is beyond 15% below the current DSR was an
exception subject to serious scrutiny and rigours. In the instant case, it however
appears the recourse of the aforesaid provision has been taken only with the purpose
to allot the works to the respondent no. 5 in each of these cases who appear to be the
members of the same family. The decision making process which involves a
verification report dated 09.10.2023 and it is acceptance appear to be done in a
wholly predetermined with which clearly reflects bias and nepotism.
23. As regards the submission made that the work orders were published only on
13.02.2024, this Court is, however, unable to accept the said submission as the work
order is dated 06.01.2024 wherein there is a stipulation of completion of the work
within 180 days. Therefore, the progress report that 70% of the work has been done
cannot be presumed to be erroneous.
24. It has been submitted that in spite of the interim order, payment of running bills
has been made. Though ideally Leave should have been taken from this Court, since
part of the work has been done prior to passing of the interim order, this Court is not
inclined to enter into the said issue in these proceedings.
25. In view of the facts and circumstances of the case and the discussions made
Order downloaded on 04-08-2025 10:06:22 PMPage No.# 18/18
above, this Court is of the opinion that the process adopted for allotting the works to
the respondent no. 5 is not in accordance with law and accordingly, the Work Orders
dated 06.01.2024 are interfered with. It is, however, made clear that since there was
certain progress pursuant to the aforesaid Work Orders, the balance of the works are
to be done through the eligible bidders who would be qualified for the same pursuant
to the tender process. So far as WP(C)/998/2024 is concerned, since no progress
could be made, the work is to be allotted to the eligible bidder.
26. The writ petitions are accordingly allowed in the manner indicated above.
27. The interim orders passed earlier stand merged with the final order.
JUDGE