As per case facts, Eastern Coalfields Limited challenged a CGIT award that reinstated an employee dismissed for alleged fraud, arguing he used fabricated documents for transfer and never worked at ...
1
IN THE HIGH COURT AT CALCUTTA
CONSTITUTIONAL WRIT JURISDICTION
APPELLATE SIDE
BEFORE:
THE HON’BLE JUSTICE SHAMPA DUTT (PAUL)
WPA 9805 of 2025
Eastern Coalfields Limited
Vs.
Union of India & Ors.
For the Petitioner :Mr. Manik Das, Adv.
For the Respondent Nos. 1, 2 & 3 :Mr. Raj Kumar Gaurisaria, Adv.
Ms. Sabita Roy, Adv.
For the Respondent No.5 : Mr. Nirmalendu Ganguly, Adv.
Mr. A. Chakraborty, Adv.
Judgment reserved on : 03.09.2026
Judgment delivered on : 12.10.2026
SHAMPA DUTT (PAUL), J.:-
1. The writ application has been preferred challenging an award dated 24
th
November, 2023 passed by the Central Government Industrial Tribunal
cum Labour Court, Asansol in reference Case no. 15 of 1998.
2. Vide the impugned award the learned Tribunal observed as follows:-
“From the aforesaid facts and circumstances I hold that
amidst non-availability of several important missing links and
material relating to appointment of Gouri Nath Banerjee at
Ajoy-II Colliery under Sripur Area, the transfer order, LPC, and
release order by which he joined at Nakrakonda Colliery
under Bankola Area, the only sustainable evidence which
súrfaced in favour of the charged employee is his CMPF
Account Ledger bearing his CMPF account number, issued on
2
the basis of the Allotment Register of Ajoy-II Colliery (Exhibit
M-5) Weighing the evidence on record, the balance tilts in
favour of the workman who has admittedly served the
company for ten years at Nakrakonda Colliery, where he was
granted two promotions and also has a CMPF account. The
evidence adduced on behalf of the management could not
dislodge the material in support of the workman. The denial
of the management simpliciter that the workman never
worker at Ajoy -II Colliery does not help them to
establish the charge. Accordingly, I hold that the charge
levelled against the workman in Charge Sheet dated
01.10.1994 could not be established against him. The Enquiry
Report and Second Show Cause Notice were not served upon
the workman in compliance with the principle laid down in the
decision of the Hon'ble Supreme Court of India in the case of
Union of India and Others vs Mohd. Ramzan Khan [AIR
(1991) SC 471] and the Circular of Coal India Ltd. bearing No
CIL C-5A(VI)/50774/28 dated 12.05 1994. The order of
dismissal dated 23.01.1996 (Exhibit W-33) passed by the
Chief General Manager of Bankola Area against Gouri Nath
Banerjee is not sustainable under the law and the same is set
aside.”
And the tribunal finally decided as follows:-
“The workman having superannuated from service during
pendency of the Reference case, it is found appropriate to
direct the management of Nakrakonda Colliery of ECL that
Gouri Nath Banerjee be treated to be in service from the date
of his dismissal i.e. 23.01.1996. He shall be entitled to his
back wages along with consequential benefits. The
management of the company shall disburse his dues within
six (6) months from the date of Notification.
Hence,
ORDERED
that the Industrial Dispute is decided in favo ur of the
workman against the management on contest. The dismissal
of Gouri Nath Banerjee from his service by order dated 23.01
3
1996 is set aside He shall be treated to be in service w.e.f. the
date of his dismissal till the date of his normal
superannuation. He shall be entitled to his back wages for the
said period along with consequential benefits. The
management of the company shall disburse his dues within
sıx (6) months from the date of Notification. Let copies of the
Award in duplicate be sent to the Ministry of Labour,
Government of India, New Delhi fo r information and
Notification.”
3. The petitioner’s case is that the respondent No. 5 joined Nakrakonda
Colliery of Eastern Coalfields Limited (hereinafter referred to as the
"ECL") on 02-03-1984 as Fitter Helper on misrepresentation that he was
transferred from Ajoy - II Colliery - At that time, Nakrakonda Colliery was
under Jhanjra Area (presently Bankola Area) while Ajoy - II Colliery was
under Sripur Area (presently under Satgram-Sripur Area. At the time of
joining at the Nakrakonda Colliery, the respondent No. 5 used false and
fabricated documents like LPC (Last Pay Certificate), Transfer order dt.
17-02-1984 (not produced), etc. Necessary information was sought from
the management of the Ajoy II Colliery which revealed that the
respondent No. 5 never worked at the Ajoy -II Colliery, Charge-Sheet
dated 15-07-1994 was issued. The same was challenged before the
Hon'ble High Court at Calcutta and was set aside with liberty to the
petitioner to issue fresh Charge-Sheet. Fresh Charge-Sheet dated 01-10-
1994 was issued for Misconduct under Clauses 17 (i) (a), (o) & (u) of the
Model Standing Orders. Reply to the Charge -Sheet was given by the
respondent No. 5 on 04-10-1994. Headquarter of ECL by letter dated 08-
02-1995 informed the Jhanjra Area that no letter of transfer dated 17-
4
02-1984 was ever issued. Enquiry Proceedings were conducted and
concluded and Enquiry Report dated 13-12-1995 was submitted wherein
the charges against the respondent No. 5 were found proved. Respondent
No. 5 was dismissed from service vide letter dated 23-01-1996.
4. Respondent No. 5 filed a writ petition challenging dismissal but the same
was dismissed on the ground of alternative remedy Appeal filed was also
dismissed. Industrial dispute was raised. Reference made on
12/06/1998. Award passed by the CGIT, Asansol, on 10 -03-2010-
Challenged by ECL in WP 15750 (W) of 2010 - Such writ petition was
dismissed on 27-08-2018. Appeal being MAT 1375 of 2018 was filed .
Appeal was allowed and the Award was set aside and the matter was
remanded back to the CGIT by order dated 30-03-2022. CGIT passed
the Impugned Award dated 24-11-2023.
5. The petitioner’s grounds for setting aside of the impugned award is as
follows:-
i) FRAUD committed by the respondent No. 5 in securing employment
at the Nakrakonda Colliery of ECL. The LPC (Last Pay Certificate) as
submitted by the respondent No. 5 at the time of joining the
Nakrakonda Colliery shows a different CMPF A/c No. than that of
the one stated by the CMPFO in the letter dated 03-12-2018. There
cannot be two CMPF A/c Nos for one workman as CMPF A/c No. is
allotted only once, when a person is employed in a coal company and
5
the same remains unaltered until his cessation of work with the
company.
ii) CGIT failed to consider that the CMPF A/c No. mentioned in the LPC
is not of the respondent No. 5 but was of one Jayshree Ahir as
confirmed by the letter dated 04/05-07-1994. It is thus apparent
that the CMPF A/c was opened only after the respondent No. 5
joined the Nakrakonda Colliery in 1984 and not prior to that though
the respondent No. 5 alleges that he was appointed on 22-03-1982
at the Ajoy-II Colliery. It is not possible for a new appointee to work
for two years without CMPF A/c No., as the Exhibit W-28 (CMPF
Pass Book) and Exhibit M-4 (letter dated 03-12-2018 of the CMPFO)
do not prove that the respondent No. 5 was working since the first
quarter of 1982 (his alleged date of appointment being 22-03-1982)
Paragraphs 2 (k), 25A, 37 (d), 38 & 39 of the CMPF Scheme 1948 are
relied upon.
iii) CGIT failed to consider the difference in the name of the father of
the workman as recorded in the CMPFO's letter dated 03-12-2018
corroborated by the CMPF Passbook and one stated by the
respondent No. 5 and is not an illiterate person and cannot be said
to have made any bonafide mistake as to the name of his father.
iv) CGIT also did not consider the letter dated 08-02-1995 wherein the
Headquarter of the petitioner confirmed that no order of transfer
dated 17-02-1984 was issued. It is apparent from paragraph 18 of
6
the Award that the respondent No. 5 failed to produce his
appointment letter and acted surreptitiously by lodging a GD dated
27-07-1994 as to loss of all documents relating to his
employment to cover his misdeeds . There was no reason why the
respondent No. 5 was carrying all such documents with him when
the Charge-Sheet dated 15-07-1994 was issued but enquir y
proceedings were not started. If the respondent No. 5 had lost the
service records how could he produce before the CGIT the
documents like LPC, transfer order, etc. pertaining to Ajoy - II
Colliery?
6. The petitioner has relied upon the following judgments:-
i) Addagada Raghavamma & Another -versus- Addagada
Chemchemma & Another reported in A 1964 SC 136
Paragraphs 9 to 12 (Page 8 at 13 and 14 of this written
notes).
ii) Anil Rishi -versus- Gurbaksh Singh reported in (2006) 4
Supreme 62 Paragraphs 12, 19 and 20 ( Page 35 at 38 and
39 of this written notes).
iii) A. V. Papayya Sastry & Others -versus- Govt. of A.P. & Others
reported in (2007) 4 SCC 221-Paragraphs 21 to 30 (Page 40
at 50 and 51 of this written notes).
7
iv) Commissioner of Customs -versus- Aafloat Textiles India
Private Limited and Others reported in (2009) 11 SCC 62,
Paragraph 12 (page 58 at 62 of this written notes).
v) Meghmala and Others -versus- G. Narasimha Reddy and
Others reported in (2010) 8 SC 383 - Paragraphs 28, 34 and
36 [Page 68 at 79, 80 and 81 of this written notes].
vi) State of Uttar Pradesh and Others -versus- Ravindra Kumar
Sharma and Others repo rted in (2016) 4 SCC 791 -
Paragraphs 7, 8, 10 and 11 [Page 86 at 88, 89 and 91 of
this written notes].
7. The private respondent being the respondent no.5 herein has stated that
the Learned CGIT, after a full-fledged trial, by the said Award dated
24.11.2023, decided the Industrial dispute in favour of the workman
(respondent no. 5 herein) and set aside the order dated 23.01.1996 by
which the respondent no. 5 was dismissed from his service. The Learned
CGIT, further directed that the respondent no. 5 shall be treated to be in
service w.e.f. the date of his dismissal till the date of his superannuation
and he shall be entitled to his back wages for the said period along with
consequential benefits. The management of the company, has been
directed to, disburse his dues within six months from the date of
Notification.
8. It is further case of the respondent no.5 the written complaint alleged to
have been received by the petitioner company against respondent no. 5
8
were neither served upon respondent no. 5 nor adduced as evidence
either before the Enquiry Officer or before the Learned CGIT.
9. The charge-sheet dated 15.07.1994, on the basis of which the enquiry
proceedings was initiated is itself vague and bad in law and should not
have been taken cognizance of, as it was not accompanied by any
statement of allegations or list of witnesses and, moreover, it failed to
specifically disclose the documents alleged to have been fabricated by the
workman/respondent no. 5. The enquiry proceedings initiated on the
basis of such a vague chargesheet stands vitiated, as having been
conducted in violation of the principles of natural justice and is liable to
be quashed and set aside. [Anant R. Kulkarni Vs. Y.P. Education
Society and Ors. reported in (2013) 6 SCC 515 para 16, 17 ].
10. That at the time of transfer of any workman from one office to another
office of employer's establishment, an order of transfer, Last Pay
Certificate (L.P.C) and an order of release are issued and the same are
communicated to the place of transfer officially and the transferred
workman has nothing to do with the same. In this case, it was the
persisted stand of the workman/respondent no. 5 from the very
inception and has been specifically pleaded in his written statement
before the CGIT that he has not carried an d produced the order of
transfer, Last Pay Certificate (L.P.C) and an order of release but the said
papers reached to the management of Bankola Area, Nakrakonda Colliery
before his joining and the same has not been specifically denied by the
9
management/petitioner which itself proves the contention made by the
workman is true and correct.
11. That at the time of joining of the workman/respondent no. 5 at the
transferee colliery all the relevant papers and documents were verified by
the higher officials of the management/petitioner but the officials who
checked and verified the documents had not been produced as a witness
by the management either before the Enquiry Officer or before the
Tribunal. However, the witness produced before the Enquiry Officer or
before the Tribunal do not have any personal knowledge of the incident.
12. Admittedly, during the tenure of the workman at the Nakrakonda
Colliery (after being transferred from Ajoy-II Colliery) starting from
02.03.1984 till his order of suspension on 01.10.1994, the workman
was promoted from the post of Fitter Helper to the post of Fitter in
Category-IV by order dated 07/09.03.1989 (Exhibit W-26) and thereafter
again after five years he had been promoted to the post of Fitter in
Category-V by order dated 16/24.01.1994 (Exhibit W-27). At time of
promotion, all records relating to service of workman had been duly
verified by the officials of the management. But officials who were
connected in giving promotion of the workman has not been produced as
a witness either before Enquiry Officer or before the Tribunal which is
fatal to employer's case that entry of the workman in the service is illegal
or based on fabricated documents and adverse inference is liable to be
drawn against the petitioner company.
10
13. A bare glance at the enquiry report annexed with the writ petition itself
shows that respondent no. 5, the delinquent workman, was not afforded
any opportunity to defend himself, and moreover, the entire burden of
proof had been improperly placed upon him. Therefore, the en quiry
report and the second show cause notice ought to have been served upon
respondent no. 5 prior to awarding the highest punishment. The failure
to afford such an opportunity has caused grave prejudice to respondent
no. 5. The action of the management i s against the principles
pronounced by the Supreme Court of India in [Union of India and
Others Vs. Mohd. Ramzan Khan repor ted in (1991) 1 SCC 588 para
15].
14. The Union of India has filed the written notes along with supplementary
notes and has supported the impugned award passed in the present
case. The specific contention of Union of India herein is that the Award
was published in the Official Gazette of Govt. of India and that 30 days
from 29.01.2024 expired on 28.02.2024 and the said Award got the force
of the law and become enforceable as envisaged u/sec. 17A and became
final and binding on the parties to the dispute as well. Sec. 17(2)
specifically lays down that the said award, then shall not be called in
question by any Court in any manner whatsoever.
15. Section 17A, 17(2) and Section 18 are reproduced herein below for
reference:-
“Sec 17A- Commencement of the Award .- (1) An Award
(including an arbitration award) shall become enforceable on
11
the expiry of thirty days from the date of its publication under
section 17…………….
Sec.17(2) Subject to the provisions of section 17A, the
award published under sub -section(1) shall be final and
shall not be called in question by any court in any
manner whatsoever.
Section 18. Persons on whom settlements and awards
are binding.-[(1) A settlement arrived at by agreement between
the employer and workman otherwise than in the course of
conciliation proceeding shall be binding on the parties to the
agreement.
(2)[Subject to the provisions of sub-section (3), an arbitration
award] which has become enforceable shall be binding on the
parties to the agreement who referred the dispute to
arbitration.]
(3) A settlement arrived at in the course of conciliation
proceedings under this Act [or an arbitration award in a case
where a notification has been issued under sub-section (3-A) of
section 10-A] or [an award [of a Labour Court, Tribunal or
National Tribunal] which has become enforceable] shall be
binding on-
(a)all parties to the industrial dispute;
(b)all other parties summoned to appear in the proceedings
as parties to the dispute, unless the Board, [arbitrator,] [Labour
Court, Tribunal or National Tribunal] as the case may be,
records the opinion that they were so summoned without proper
cause;
(c)where a party referred to in clause (a) or clause (b) is an
employer, his heirs, successors or assigns in respect of the
establishment to which the dispute relates;
(d)where a party referred to in clause (a) or clause (b) is
composed of workmen, all persons who were employed in the
establishment or part of the establishment, as the case may be,
to which the dispute relates on the date of the dispute and all
persons who subsequently become employed in that
establishment or part.”
16. It is further submitted that non-implementation of the Award after
becoming final and binding on the parties attracts penal clauses as
12
under Section 29 read with section 32 of the I.D. Act, 1947. The said Sec.
29 and section 32 speaks as under:-
“Sec. 29. Penalty for breach of settlement or award - Any
person who commits a breach of any term of any settlement or
award, which is binding on him under this Act, shall be
punishable with imprisonment for a term which may extend to
six months, or with fine, or with both, and where the breach is
a continuing one, with a further fine which may extend to two
hundred rupees for every day during which the breach
continues after the conviction for the first and the Court trying
the offence, if it fines the offender, may direct that the whole or
any part of the fine collected from him shall be paid by way of
compensation, to any person who in its opinion has been
injured by such breach.
Sec. 32 Offence by companies etc. When a person
committing an offence under this Act is a company or other
body corporate or an association of persons (whether
incorporated or not), every director, manager, secretary, agent
or other officer or person concerned with the management
thereof shall unless he proves that the offence was committed
without his knowledge or consent, be deemed to be guilty of
such offence.”
The present Writ Petition WPA 9805 of 2025 has been filed after a long
delay of more than 1 ½ years. No plausible explanation has been stated
for such delay by the petitioner company.
17. Hence the Union of India submits that writ petition is thus not
maintainable. In support of the allegation of fraud against the private
respondent/workmen submits that the stand of the petitioner cannot be
accepted considering that the Petitioner company allowed Respondent
No. 5 to serve continuously for over 10 years (from March 1984 to July
1994) without any internal audit or verification objection. During this
13
tenure, the workman was twice granted promotions (to Category -IV in
1989 and Category-V in 1994) after thorough verification of service
records by management officials. Independent records from the Coal
Mines Provident Fund Office (Exhibits M -4 and M-5) confirm the
workman's date of appointment as 22.03.1982 at Ajoy-II Colliery. Minor
discrepancies in CMPF account numbering or administrative details
generated by external authorities cannot be attributed as fraud on the
part of the workman, although it reveals from the Award that there is no
discrepancies in CMPF record.
18. From the materials on record including the impugned award, it
appears that the sole document which formed the b asis of the award
was the employee’s CMPF amount and the allotment register of Ajoy
II colliery, which shows the name of the employee, on the basis of
which CMPF account number was allotted on the basis of the said
Register forwarded to the Regional Commis sioner – I(SG), CMPF,
Region- I.
19. The tribunal’s following observation is relevant:-
“………..documents filed by the management
(Exhibit M-4 and M-5) would reveal that the office of
the Regional Commissioner - I (SG), CMPF in their
letter dated 03.12.2018 informed the General
Manager, Bankola Area that as per report received
from custodian official and the Allotment Register
of Ajoy-II Colliery (BKR/4), Gouri Nath Banerjee, son
of Radhanath Banerjee was allotted CMPF Account
No. BKR/4/348. Both these documents have been
filed by the management which reveal that
according to the Allotment Regist er of Ajoy-II
14
Colliery, Gouri Nath Banerjee was a beneficiary of
CMPF with Account No. BKR/4/348 and Allotment
Register reveals that his date of joining was
22.03.1982………..”
20. The petitioner’s witness also deposed that “no verification of such
transfer order was done by the management to find out if genuine or
not”.
21. The employee worked for 10 years and was granted two promotions. This
also shows he was qualified for the post where he worked /was
attached.
22. The findings on which the impugned award was passed are as follows:-
“…………..The management of ECL thereafter produced
Exhibit M-4, a letter dated 03.12.2018, issued by the
Regional Commissioner-I (SG), CMPF, which demolishes
the management's own case that Gouri Nath Banerjee
did not work at Ajoy-II Colliery. It transpires from the
communication made to the General Manager, Bankola
Area that as per the Allotment Register of Ajoy-II Colliery
Sri Gouri Nath Banerjee, S/o- Radhanath Banerjee was
allotted CMPF Account No.: BKR/4/348. There is
nothing to disbelieve Exhibit M-4 and Exhibit M-5, which
originate from an independent source, the Coal Mines
Provident Fund authority, over which the charged
employee has no control or influence. The unescapable
conclusion therefore is that the employer failed to
discharge their onus of proving the charge of misconduct
by fraud against Gouri Nath Banerjee under Clause
17(i)(a), 17(i)(o), and 17(i)(u) of the Model Standing Order
applicable to the management………..”
23. From the said facts, findings, evidence on record and circumstances, the
impugned award being in accordance with law requires no interference.
15
24. WPA 9805 of 2025 is dismissed.
25. Applications, if any, connected thereto stand disposed of
consequently.
26. Photostat certified copy of this Judgment, if applied for, be given to the
parties on priority basis upon compliance of all formalities.
(Shampa Dutt (Paul), J.)