Sanjar Enclave Premises Co-operative Society Limited Vs. Competent Authority, District Deputy Registrar, Societies, Mumbai City-4 and others

  Bombay High Court WP-4710 OF 2022
Link copied!

Case Background

As per case facts, the Petitioner society sought deemed conveyance of its land, having formed from flat purchasers in one building within a larger layout. This application was rejected by ...

Bench

Applied Acts & Sections

No Acts & Articles mentioned in this case

Hello! How can I help you? 😊
Disclaimer: We do not store your data.
Document Text Version

Neeta Sawant                                             WP-4710 OF 2022

IN THE HIGH COURT OF JUDICATURE AT BOMBAY

CIVIL APPELLATE JURISDICTION

WRIT PETITION NO. 4710 OF 2022

Sanjar Enclave Premises Co-operative

Society Limited

...Petitioner

: Versus :

1. Competent Authority, District

Deputy Registrar, Co-operative

Societies, Mumbai City-4

2. State of Maharashtra

3. Siraj Mohammed Haji Adam

4. Ashraf Mohammed Haji Adam

5. Abdul Sattar Haji Adam

6. Salim Abdul Latif Halai

7. Arif Abdul Latif Halai ....Respondents

Mr. Tushad Kakalia i/b. Ms. Sukeshi Bhandari, for the Petitioner.

Mr. Mayur Khandeparkar with Mr. Sanjiv R. Singh, Mr. Shivam P. Joshi,

Mr. Ankit J. Mishra i/b. Mr. Ritesh A. Singh, for Respondent Nos.3 to 7.

Mr. P.V. Nelson-Rajan, AGP for State-Respondent Nos.1 and 2.

CORAM: SANDEEP V. MARNE, J.

JUDGMENT RESD. ON : 26 OCTOBER 2026.

JUDGMENT PRON. ON : 3 NOVEMBER 2026.

                PAGE NO.    1   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

JUDGMENT:

1) Petitioner-society has assailed the order dated 31 March

2021 passed by the District Deputy Registrar, Co-operative Societies,

Mumbai City-4 and Competent Authority (Competent Authority)

rejecting its application for deemed conveyance.

2) Petitioner is a co-operative housing society formed by �at

purchasers of Sanjar Enclave Premises CHSL (Sanjar Enclave) building

constructed on the land bearing Survey Nos.32, 32A and 32 B

corresponding CTS Nos.428A, 428A/1 to 20 and 428B of Village-Malad

(North), Taluka-Borivali, Mumbai Suburban District. Petitioner-society

has 46 members.

3) By Conveyance Deed dated 22 December 1959, Mr. Abdul

Latif Haji Adam and Mr. Mohd. Adam purchased the land admeasuring

4163.70 sq.m bearing Survey Nos.32, 32A and 32B corresponding CTS

Nos.428A, 428A/1 to 20 and 428B of Village-Malad (North), Taluka-

Borivali, Mumbai Suburban District. Municipal Corporation of Greater

Mumbai (MCGM) approved plans for construction of a structure named

as ‘Madina Manzil’ on 27 June 1963. Accordingly, the structure Madina

Manzil comprising of ground plus 3 upper �oors was constructed having

BUA of about 1780.02 sq.mts. The units in the Madina Manzil building

were let out to the tenants by the land owners. On 4 August 1984, the

owners granted development rights for construction of another structure

with BUA of 957.25 sq. mts. Accordingly, a building named ‘Akshar Kunj’

was constructed in the year 1986 in which, 10 existing tenants on the

                PAGE NO.    2   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

land were rehabilitated and the balance �ats were sold. The unit

occupiers of the building have formed Akshar Kunj CHSL.

4) In the year 2003, the land owners proposed construction of a

third structure in the layout and accordingly plans were submitted to

MCGM for construction of Building-A (Sanjar Enclave). The layout was

approved by the MCGM on 7 August 2003 for construction of Building-A

and by indicating presence of Building-B (Akshar Kunj CHSL) and

Building-C (Madina Manzil). The IOD and Commencement Certi�cate for

Building-A known as ‘Sanjar Enclave’ were issued on 10 October 2003

and 15 April 2004 respectively. Agreements under Section 4 of

Maharashtra Ownership Flats (Regulation of the promotion of

construction, sale, management and transfer) Act, 1963 (MOFA) were

executed in favour of the unit purchasers of Sanjar Enclave building and

units therein were sold. After completion of construction of the building,

Respondent Nos.3 to 7 submitted a proposal to MCGM for redevelopment

of Madina Manzil building. On 20 December 2013, MCGM approved the

plans and issued IOD for reconstruction of Madina Manzil building

comprising of BUA of 2692.53 sq.mts. The �at purchasers of Sanjar

Enclave building executed Af�davit-cum-No objection on 22 August

2014 recognising the rights of the land owners for construction of

additional structures by utilizing the development potential in the land.

They also agreed that conveyance would be executed only after

development of the whole layout. After execution of such Af�davit-cum-

No objection, Petitioner-society was registered on 15 April 2015 by

imposing various conditions forming part of Af�davit-cum-No objection.

In the meantime, Madina Manzil became dilapidated an d was

                PAGE NO.    3   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

demolished in the year 2019. The MCGM issued a fresh IOD on 13

February 2019 for the reconstruction of Madina Manzil building. It also

issued the Plinth CC on 16 December 2019 and a further CC on 22 July

2020.

5) In the above background, Petitioners �led Application No.

115 of 2020 for unilateral deemed conveyance of the entire land

admeasuring 4163.70 sq.mts. During pendency of application for deemed

conveyance, Petitioner �led L.C. Suit No. 1570 of 2022 in the City Civil

Court against Respondent Nos.3 to 7 and the MCGM seeking declaration

that Af�davit-cum-No objection dated 22 August 2014 is illegal and not

binding as well as challenging the IOD dated 13 February 2019 and

sought restraint against construction of building in place of the

structure-Madina Manzil.

6) Petitioner's application for deemed conveyance was resisted

by Respondent Nos.3 to 7 by �ling their reply. By order dated 31 March

2021, the Competent Authority has rejected Petitioner’s application for

deemed conveyance. Aggrieved by the order dated 31 March 2021, the

Petitioner has �led the present petition.

7) Mr. Kakalia, the learned counsel appearing for the Petitioner

has submitted that the Competent Authority has erroneously rejected

Petitioner’s application for deemed conveyance. He submits that the

Petitioner is entitled to conveyance of land proportionate to the BUA

utilized in construction of its building. He submits that following the

ratio of judgment of this Court in Satellite Garden-I CHSL Versus State

                PAGE NO.    4   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

of Maharashtra

1

, land sharing in required to be frozen on the basis of

initial plan dated 7 August 2003. He submits that reliance by Respondent

Nos.3 to 7 on Af�davit-cum-No objection dated 22 August 2014 is totally

baseless. That the said Af�davit-cum-No objection cannot be treated as

a consent within the meaning of Section 7 of MOFA. That Af�davit-cum-

No objection is nothing but a blanket consent since it does not disclose

the nature of additional construction. That there is nothing on record to

indicate that the IOD or revised plans were ever disclosed to the

members of the Petitioner-society while executing the Af�davit-cum-No

objection. He relies on judgment of this Court in Rose Villa Co-operative

Housing Society Limited v/s. District Deputy Registrar and others

2

, in

support of his contention that Competent Authority can decide the issue

of existence or otherwise of consent. That the Af�davit-cum-No

objection was secured from the �at purchasers for permitting them to

form society. That pendency of suit �led after the deemed conveyance

application does not foreclose the Competent Authority from conducting

limited inquiry of existence or otherwise of the consent. Mr. Kakalia

therefore submits that this Court may adjudicate upon the issue of the

existence of consent and, accordingly, uphold the Petitioner's right to

conveyance of a proportionate share in the land. That structures

subsequently constructed by revision in the original plan cannot affect

the crystallised share of the Petitioner in the layout land. That

Respondent Nos.3 to 7 are proposing to put up additional construction in

the layout by redeveloping the building of Akshar Kunj Society. He

therefore submits that it is necessary to notionally divide the land by

1    WP/1128/2026 decided on 16.9.2026

2WP/17527 OF 2024 decided on 6.10.2026

                PAGE NO.    5   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

conveying the proportionate land in favour of the Petitioner-society with

a view to ensure that the land owners do not utilise additional potential

in the layout land to their advantage.

8) Mr. Khandeparkar the learned counsel appearing for

Respondent Nos.3 to 7 opposes the petition submitting that the

Competent Authority has rightly rejected Petitioner’s application for

deemed conveyance as premature. That members of the Petitioner-

society have speci�cally agreed for postponement of conveyance on

completion of layout development. That therefore the period speci�ed in

Rule 9 of MOFA Rules is inapplicable in the facts and circumstances of

the present case as parties have contractually agreed for conveyance of

layout land only after completion of the layout development. He submits

that the petition is bad for non-joinder of parties as other society in the

layout viz. Akshar Kunj CHSL has not been impleaded as a party

respondent. He relies on judgment of this Court in Keyuri Constructions.

Pvt. Ltd. versus. State of Maharashtra and others

3

, in support of his

contention that it is mandatory to implead all the societies in a deemed

conveyance application.

9) Mr. Khandeparkar further submits that, while the Petitioner

accuses Respondent Nos. 3 to 7 of utilising TDR/incentive FSI for the

construction of other buildings in the layout, the Petitioner conveniently

ignores the fact that TDR as well as incentive FSI has also been utilised

in the construction of Petitioner’s own building. He submits that

Petitioner-society has expressly consented for further development in

3   WP 13405 2024 decided on 19.12.2024/ /

                PAGE NO.    6   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

the layout land by execution of Af�davit-cum-No objection. That

agreement expressed in Af�davit-cum-No objection is also re�ected in

the Registration Certi�cate of the Petitioner dated 15 April 2015. That

the case does not involve execution of blanket consents. That these are

individual consents executed by the �at purchasers after securing

possession of their respective �ats. That the case does not involve

securing of consent letters by a developer as a condition precedent for

handing over possession of the �ats. That �at purchasers of Petitioner-

society are all educated persons and have consciously executed Af�davit-

cum-No objection. That in any case, the issue of validity of Af�davit-

cum-No objection is pending before the City Civil Court in the suit �led

by the Petitioner. That Petitioner-society has voluntarily segregated the

issue of validity of the consent/their deemed conveyance application by

incorporating the same in the suit. That a society cannot now turn

around and contend that the same issue be decided in de emed

conveyance proceedings. He submits that the Petitioner-society has been

unsuccessful in securing any injunction in the pending suit and its

prayer for temporary injunction has been rejected upto this Court. That

construction of new building in place of Madina Manzil building is long

since complete and OC for the same is issued. He submits that in

Satellite Garden-I CHSL this Court has speci�cally held that the

Competent Authority cannot go into the issue of validity or otherwise of

consents. That the judgment of this Court in Rose Villa CHSL has no

application to the facts of the present case as the case involved a

situation where plans were not approved at the time of execution of

consents. Here consents have been executed well after sanction of

                PAGE NO.    7   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

revised plans by the MCGM. Mr. Khandeparkar prays for dismissal of the

petition.

10) Rival contentions urged on behalf of the parties now falls for

my consideration.

11) Petitioner-society is aggrieved by rejection of its application

for deemed conveyance by the Competent Authority. While rejecting

Petitioner’s application for deemed conveyance, the Compe tent

Authority has concluded in paragraph 15 of its order as under:

15. In view of all this fact, I am of the opinion that the construction

thereon is on the basis of FSI and TDR obtained on the area of the

entire land/layout and therefore a portions of the same cannot be

alienated from the calculation of the total FSI which is based on the

area of the entire land of the layout. Therefore, granting deemed/

unilateral conveyance to the applicant society will cause unequal

distribution of the FSI used in the construction of the existing buildings

of applicant society and other building on the same layout and also

affect the legitimate rights of the opp. no. 1 to 5 to consume the balance

FSI/TDR and also affect the right of tenants in the building Madina

Manzil. Hence it is only fair to grant the conveyance to all the buildings

after completion of the construction of the entire layout.

12) Thus, the main reason why the Competent Authority has

rejected Petitioner’s application for deemed conveyance is the possible

adverse effects on the rights of tenants of building-Madina Manzil. As

observed above, the �rst structure to be constructed in the layout is

Madina Manzil which was ground plus 3 upper �oors tenanted building

with BUA of 2129.21 sq.yards (1780.02 sq.mts). Plans for construction of

                PAGE NO.    8   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

Madina Manzil building were approved by MCGM on 27 June 1963. There

were apparently 30 tenants in the building Madina Manzil.

13) The second structure to be constructed in the layout,

Akshar Kunj building for which plans were approved by MCGM on 23

December 1986. As per the plan dated 23 December 1986, the total BUA

of 3607.97 sq. mts was sanctioned by MCGM. It appears that there was

road set back area admeasuring 460.70 sq. mts which resulted in

reduction of gross plot area of 4163.70 sq.mts to net plot area of 3607.97

sq.mts. While sanctioning the plan dated 23 December 1986, MCGM

deducted BUA of Madina Manzil of 1780.02 sq.mts. Similarly, BUA of

540.33 sq.mts of small structures such as store room, public room and

old bungalow was also deducted. BUA of 330.37 sq.mts was reserved for

proposed building on the west side and in the plan, BUA of 957.25 sq.mts

was allotted for Akshar Kunj building that came to be constructed with

BUA of 957.25 sq.mts.

14) In the year 2003, Respondent Nos.3 to 7 undertook

construction of third structure in the layout, which is the building of

Petitioner-society named ‘Sanjar Enclave’. On 7 August 2003, MCGM

sanctioned the layout plan indicating the existing structures-Madina

Manzil and Akshar Kunj as well as sanctioning the third structure-Sanjar

Enclave. The OC plan for the Sanjar Enclave building, comprising of

parking, ground �oor, stilt, 15% R.G. on the �rst-�oor podium, and seven

upper �oors, indicates that the total BUA utilised therein is 4,113.00 sq.

m., comprising a base/inherent BUA of 870.70 sq. m. and TDR/incentive

FSI of 1,062.30 sq. m. plus 2,180.00 sq. m.. It appears that a BUA of

                PAGE NO.    9   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

4,109.64 sq. m. has been utilised for the construction of the Petitioner-

Society’s building.

15) Petitioner-society initially claimed conveyance of the entire

plot area admeasuring 4163.70 sq. mts. in its application for deemed

conveyance. This prayer of the Petitioner-society was grossly erroneous

as there are other structures in the layout land, who are also entitled to

share the layout land. It also appears that in its application, Petitioner

did not even disclose presence of Madina Manzil and Akshar Kunj

buildings. The Petitioner also failed to implead Akshar Kunj CHSL as a

party Respondent to its application, thereby rendering the application

for deemed conveyance inherently defective. It is a well-settled principle

that where an organisation of �at purchasers in respect of one building

in a layout seeks conveyance of its proportionate share in the land, it is

necessary to implead the other organisations formed in respect of the

remaining buildings in the layout as parties to the proceedings. However,

since the Petitioner sought conveyance of the entire layout land while

suppressing the existence of Akshar Kunj CHSL in the said layout, the

Petitioner apparently did not even deem it necessary to implead Akshar

Kunj CHSL as a party Respondent to its application. On this ground

alone, Petitioners application deserved dismissal.

16) Petitioner is not entitled to conveyance of the entire layout

land. This position is now accepted by the Petitioner since Mr. Kakalia

has pressed for conveyance of proportionate share in the layout land in

favour of the Petitioner-society. Thus, there appears to be a signi�cant

shift in the approach of the Petitioner, which is now seeking conveyance

                PAGE NO.    10   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

of only proportionate share in the layout land and not the whole of the

land. However, since the Petitioner is now seeking conveyance of its

proportionate share in the layout land, it was imperative that Akshar

Kunj CHSL, which is also entitled to conveyance of a portion of the land,

was impleaded as a party to the deemed conveyance application. It is

also imperative that Akshar Kunj CHSL is impleaded in the present

Petition. In the absence of Akshar Kunj CHSL, the present Petition is

defective and liable to be dismissed on this ground.

17) Momentarily leaving aside the issue of non-impleadment of

Akshar Kunj CHSL, I proceed to consider Mr. Kakalia’s submission that

Petitioner is entitled to conveyance of land in proportion to the BUA

utilized in construction of its building, which apparently is 4109.64

sq.mts. He has relied on judgment of this Court in Satellite Garden-I

CHSL in support of his contention that the plans subsequently revised in

the year 2013 cannot result in reduction of Petitioner's share in the land

on account of application of principle of crystallization/freezing

enunciated by this Court in Satellite Garden-I CHSL.

18) No doubt, this Court has recognized the principle of land

freezing/crystallization upon formation of �rst society in the layout and

for distribution of layout land in accordance with BUA sanctioned for

each building in the layout as per the �rst sanctioned plan. This Court

has discussed the principle of freezing/crystallization of land

entitlement in paragraphs 165 to 173 of the judgment in Satellite

Garden-I CHSL, which read thus:

                PAGE NO.    11   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

165. Having taken note of the complexities in proportionate land

division in layout developments where plans are modi�ed successively

for the purpose of availing the bene�t of higher FSI/BUA, it is now time

to �nd a best possible answer to the conundrum. In my view, the answer

to these complications created by the developers on account of revision

of layout plans lies in combined reading of provisions of MOFA and

MOF Rules, and a suggestion in this regard has also come from the

State Government.

166. MOFA imposes twin duties on the developer once he undertakes

construction of a building comprising of �ats. Developer’s �rst

obligation is under Section 10 of the MOFA, under which he must form

a cooperative society or a company within the prescribed period of sale

of minimum number of �ats required for formation of society/company.

The period prescribed for formation of the society under Rule 8 of the

MOF Rules is ‘four months’. Once the promoter discharges this

obligation, the second obligation immediately kicks in under Section

11(1) of the MOFA. Developer then needs to convey in favour of the

society/company his right, title and interest in the land and building

within the prescribed period. Prescribed period here is again ‘four

months’ from the date of formation of the society/company as provided

under Rule 9 of MOF Rules. The combined effect of Sections 10 and 11

of the MOFA and Rules 8 and 9 of MOF Rules is such that the promoter

cannot delay conveyance and the same must be done within the period

prescribed.

167. If this concept of twin obligations on a promoter/developer,

discussed in the preceding paragraph, is borne in mind and followed in

each case, there may not be much dif�culty even in a case where

developer commits the mischief of getting the plans revised midway for

availing bene�t of higher FSI/BUA. To illustrate, when development of a

plot admeasuring 10,000 sq.m. is undertaken for construction of two

buildings each of 5,000 sq.m. and construction of building No.1 is

complete and if the required number of �ats therein are sold, there is a

statutory obligation to form a cooperative society within four months.

Accordingly, the society is formed, say on 1 January 2005. Within four

months thereafter, the next statutory obligation kicks in to convey the

title in the land in favour of the society i.e. by 1 May 2005. Thus, the

right of the �rst building/society to secure its proportionate share in

the land crystallises on 1 May 2005. Its land entitlement gets ‘frozen’. In

this illustration, since Building No. 1 has utilized half of the BUA

sanctioned, it must get conveyance of 50% of the layout land. Since the

�rst building/society is entitled to secure land admeasuring 5,000 sq.m.

as on 1 May 2005, any delay on the part of developer in conveying the

land would not defeat the entitlement to secure conveyance of the

frozen portion of land of the �rst society/building.

                PAGE NO.    12   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

168. As observed above, the concept of divestment of title of the

promoter has already taken place qua land admeasuring 5,000 sq.m. for

Building No.1 in the above illustration. What is postponed is the latter

act of vesting of title in the society. In such a scenario, the title qua the

land admeasuring 5000 sq.m. has gone away from the developer but is

yet to fall in the pockets of the society. It is in the state of limbo

temporarily. In such a case, even if developer gets the plan revised

taking bene�t of his mischief in not conveying the land in favour of the

Society, the same would have no effect on the right of the �rst

building/society to secure conveyance of land admeasuring 5000 sq.m.

As observed above, the planning authorities unfortunately take into

consideration the area of the entire plot while sanctioning the revised

permission since the name of the original owner continues to �gure in

the record of rights. If in this scenario, the promoter was to ful�l his

statutory obligation and convey land admeasuring 5000 sq.m. to the

society of Building No.1, the name of that society would get mutated in

the revenue records, thereby restricting the right of the promoter to

construct Building No.2 only qua the balance land admeasuring 5000

sq.m. However, as observed above, the developer takes the bene�t of his

own wrong and misuses the facility available with the planning

authority and gets the additional BUA sanctioned in respect of the

whole plot admeasuring 10000 sq.m. either due to change in FSI regime,

sanction for mixed user, permissibility to load TDR, etc. Therefore, even

if the planning authority sanctions higher FSI for Building No.2 and the

second building is constructed with BUA of 15000 sq.m., the

proportionate land division can never be in proportion to the BUA of

5000 sq.m. of Building No.1 and 15000 sq.m. to Building No.2. If the

sub-division of land in proportion to ‘last or revised sanctioned plan’

(as suggested by Mr. Khandeparkar) is accepted, the same would

tantamount to reducing the land entitlement of the �rst

building/society without any fault on its part. Thus, if the proposition

canvassed by Mr. Khandeparkar is accepted, the same would mean that

Building No.1 would receive conveyance only of land admeasuring 2500

sq.m. though its entitlement in respect of area of 5000 sq.m. was

already crystallised/frozen in May 2005.

169. The concept of freezing/crystallisation of the land entitlement

under twin effects of Sections 10 and 11 of MOFA and Rules 8 and 9 of

MOF Rules is also in tune with the legislative objective of MOFA. There

is a purpose behind prescribing the periods for performance of the twin

acts of formation of society and conveyance of land. The legislative

objective is that the organisation of �at purchasers must become owner

of the land and the developers do not misuse the delay in conveyance

for the purpose of putting up additional construction. As discussed

above, the developer’s title in the land dilutes with sale of each �at in a

building. Even in a layout development, once the plans are drawn up for

construction of multiple buildings, and the �rst building is taken up for

                PAGE NO.    13   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

development and all �ats therein are sold, the developer gets divested

of title in the proportionate land. Mere failure on his part to convey that

proportionate land does not mean that the developer can subject the

land in which he is divested of the title for revision of plans for securing

additional built-up area in the under construction or yet to be

constructed building(s) in the layout.

170. Thus, what occurs by subsequent revision of plan is actually

stealing of rights of the organisation of �at purchasers by the developer

and loading the same on the subsequent buildings. The act of stealing is

apparent in following the illustration:

(i) In a Plot size of 10000 sq.m. with FSI 1.00, the original

sanctioned BUA is 10000 sq.m., divided in two buildings of 5000

sq.m. each. In normal circumstances, both buildings would

receive conveyance of 5000 sq.m. land each. The developer

completes construction of Building No. 1 but denies conveyance

of 5000 sq.m. land on the ground of incomplete layout

development. There is a change in FSI regime or the TDR

loading limit increases, which effectively permits construction

of 1.5 times the land area (total BUA of 15000 sq.m.). Here, both

buildings become entitled to increased BUA of 5000 sq.m. (2500

sq.m. for each building). However, by not conveying land in favour

of the �rst building, the developer steals the increased BUA of

Building No. 1 and utilises it for putting up additional

construction of Building No.2 (comprising BUA of 10,000 sq.m).

(ii) Thus, what legitimately belongs to Building No. 1 is

misappropriated by the developer and encashed by delaying

conveyance of land to Building No. 1. The organisation formed

by the �at purchasers of Building No. 2 then claim land

corresponding to the BUA of 10,000 sq.m. (67% share in the

land).

(iii) If however, the legitimate entitlement of Building No. 1,

as on the date when the conveyance was due, is frozen, it would

own 50% land in the layout. When the buildings are

redeveloped, Building No. 1 would regain the lost entitlement.

(iv) Thus, the principle of land freezing ensures that what

legitimately belongs to Building No. 1 is not lost.

171. In view of the above discussion, the concept of freezing of

entitlement of share in the land of each society upon completion of

statutory prescribed periods under MOFA Act and MOF Rules would

resolve the conundrum involved in cases where layout plans are revised

by the developers with a view to milk the additional FSI/BUA.

172. The above discussed principle of freezing/crystallisation has also

emerged from the suggestions given on behalf of the State Government

                PAGE NO.    14   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

in the Note. For the sake of convenience, it would be apt to reproduce

the relevant suggestion made by the learned Advocate General:

i. The obligation of the promoter to convey the land and

building arises and crystallises in terms of Section 11 r/w Rule 9

of MOFA and MOFA Rules, respectively.

ii. For example: If one building on a plot of land is completed

consuming part FSI and balance potential of FSI is not utilized,

then in that event, the entitlement of the society has crystallised

on Occupation Certi�cate being received and such society ought

to get conveyance of the land component on the basis of FSI

consumed. FSI being calculated as both Base FSI and TDR

regardless of the fact that TDR has been used or not.

iii. If in future, the development potential increases because of

the change in DCR and the developer takes bene�t of such

increased development potential including TDR and utilises the

same on the balance portion of the land, it would result in clear

imbalance of the plot of land and the FSI. In such a situation, the

�rst society whose rights are crystallised ought not to be

deprived of the entitlement of the appropriate land component

based on the FSI consumed.

173. Therefore, the concept of freezing of the �rst plan for conveyance

purposes would be the solution to ensure that the successive revisions

in the plans do not affect the land entitlement of existing buildings in

the layout.

19) Ordinarily, following the law enunciated by this Court in

Satellite Garden-I CHSL, this Court would have upheld the right of the

Petitioner-society for conveyance of the land in proportion to BUA

utilized for construction of its building in accordance with the OC plan

dated 14 October 2009. However, the principle of freezing/crystallization

of land entitlement enunciated in Satellite Garden-I CHSL cannot be

applied in the facts and circumstances of the present case. In Satellite

Garden-I CHSL, this Court has recognized an exception to the principle

of freezing/crystallization of land entitlement, where there is express

                PAGE NO.    15   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

consent for revision of plan. This Court has held in paragraphs 210 and

211 of the judgment as under:

210. It is not that in every case the plans are revised behind the back of

already constructed buildings. There may be cases where the developer

has secured written consent from the society of building already

constructed as per originally sanctioned plan for effecting a revision

therein for availing additional BUA. In some cases, the existing

societies may have monetized their right of giving consent by securing

consideration in the form of money or additional facilities and may

have given consent for revision in the plan. In such cases, whether the

concept of land freezing/crystallisation as on the date of formation of

the �rst society can be applied? In my view, the answer is in the

negative. Where there is express consent by the �at

purchasers/societies of earlier buildings for revision of plans for

construction of subsequent buildings, the freezing/crystallisation

concept cannot apply. Where such express written consent is given,

land division can be undertaken on the basis of subsequently revised

plan, which has such consent. However, in every case where such

express consent is not given, proportionate land division must

necessarily be on the basis of the �rst sanctioned plan or at least the

sanctioned plan which was in existence at the time of application of

concept of freezing.

211. It is contended that Competent Authority being a tribunal of

limited jurisdiction cannot go into the issue of existence of consent.

There can be no dispute about this proposition and since existence or

otherwise of the consent, being a matter of intrinsic evidentiary inquiry,

the Competent Authority would not have jurisdiction to decide that

issue. However, in its summary jurisdiction, if the developer or society

of subsequent building produces a consent letter/af�davit, I do not see

much dif�culty in the Competent Authority in acting on the same and

assuming that there exists a consent for undertaking the exercise of

proportionate land division. If a competing society has any contrary

claim, the same can always be taken for adjudication to the Civil Court

as the order of deemed conveyance passed by the Competent Authority

is not �nal determinative of rights and entitlement of parties qua the

land conveyed. On the other hand, if no prima facie written evidence of

consent is produced, the Competent Authority can proceed on the basis

of absence of consent and apply the principle of freezing/crystallisation

of land entitlement as per the plan in existence at the time of expiry of

the prescribed period under Section 11 of MOFA and Rule 9 of MOF

Rules for the �rst society. In such a case, the developer/society of latter

building can approach the Civil Court to establish existence of consent.

                PAGE NO.    16   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

In my view therefore, though the Competent Authority may not be able

to resolve the issue of existence or otherwise of consent but can make

an adjudication on the basis of prima facie existence/absence of

material to indicate consent. I am supported in my view by the

judgment of this Court in Nook CHS Ltd. (supra).

20) The principles summarised by this Court in Satellite

Garden-I CHSL governing the conveyance of land in a layout

development are as under:

223. From the above discussion, following principles emerge:

(a) The right to secure conveyance of the land and the

building inures in favour of the organisation of �at purchasers

upon expiry of the period prescribed in Section 11 of the MOFA

read with Rule 9 of MOF Rules.

(b) Consequently, in a layout development, the

proportionate land which was meant to be conveyed in favour of

an organisation of �at purchasers, as on the date of expiry of

period of four months from its formation, stands crystallised

and frozen and shall not get reduced merely on account of

subsequent revision of the plans.

(c) The conveyance or deemed conveyance of land in a

layout development by undertaking the exercise of land division

proportionate to BUA used in construction of each building shall

be on the basis of either the �rst sanctioned plan or the plan

sanctioned as on the date when freezing/crystallisation occurs

i.e. when the period speci�ed under Rule 9 of the MOF Rules

expires.

(d) The above principle shall however be subject to an

exception where the �at purchasers of earlier buildings/their

societies have given a written consent for modi�cation/revision

of the plan, in which case, the exercise of proportionate land

division can be undertaken by taking into consideration the

plan, which has such consent.

(e) The Competent Authority accordingly needs to convey

the proportionate land to the societies in a layout by taking into

consideration the sanctioned plan, which existed at the time

when the time prescribed under Rule 9 of the MOF Rules had

expired from the date of formation of organisation of �at

                PAGE NO.    17   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

purchasers or the plan which has the written consent as

discussed above, whichever is later.

(f) If the developer or any other organisation of �at

purchasers in the layout are aggrieved by land division as

discussed above and are able to demonstrate land entitlement to

the contrary, they need to �le a suit questioning the land

conveyed by the Competent Authority. A society seeking

conveyance of land by application of principle of

freezing/crystallisation need not be driven to Civil Court for

seeking conveyance of the proportionate land.

(g) Developers and promoters shall give adequate notice to

the �at purchasers about construction of the building by use of

incentive FSI / TDR having and the potential risk of securing

lesser land as compared to BUA used in construction of their

building(s).

21) Thus, the usual principle of freezing/crystallization of land

entitlement does not apply in a case where the �at purchasers of earlier

buildings/their societies have given a written consen t for

modi�cation/revision of the plan. This Court has held that the exercise of

proportionate land division in cases involving consents would be on the

basis of the plan, which has such consents.

22) In the present case, Respondents Nos.3 to 7 have relied on

Af�davit-cum-No Objection dated 22 August 2014 executed by the �at

purchasers of Sangar Enclave building. The said Af�davit-cum-No

objection is signed and executed by each of the �at purchasers in respect

of Sanjar Enclave building. It appears that at the time of execution of the

Af�davit, �at purchasers of Sangar Enclave building were in the process

of forming a co-operative housing society. In their Af�davit-cum-No

Objection, which is executed on a stamp paper of Rs.100/-, the �at

purchasers agreed as under:

                PAGE NO.    18   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

We, the Promoters/Members of the SANJAR ENCLAVE PREMISES CO-

OP SOCIETY LTD.(PROPOSED) state on solemn af�rmation as under:

We have Purchased Commercial premises from (1) Abdul Latif Haji

Adam, (2) Siraj Mohammed Haji Adam (3) Aahref Mohammed H aji

Adam and (4) Abdul Sattar Haji Adam, all Co-Owners of Mumbai Indian

Inhabitants having their address at Gulzar House, SV Ro ad,

Malad(West), Mumbal-400-064. We have  Purchase the Premises/Of�ce

at SANJAR ENCLAVE PREMISES CO-OP. SOCIETY LTD.(PROPOSED) by

executing agreement All the Terms and Conditions mentioned in the

Agreement are binding upon all the members of the SANJAR ENCLAVE

PREMISES CO-OP. SOCIETY LTD. (PROPOSED).

1. The Property bearing non-agricultural Survey Nos. 32, 32-A and 32-3

and corresponding CTS. No. 428A, 428A/1 to 20 and 428B of Vilage

Malad (N) or Part of which the said Building SANJAR ENCLAVE

PREMISES CO-OP. SOCIETY LTD (PROPOSED) is constructed. The

Members/Promoters have Purchase the Of�ce premises in the said

Building which is approved for Commercial Purpose. After Construction

of Building of SANJAR ENCLAVE PREMISES CO-OP, SOCIETY LTD.

(PROPOSED) on the Part portion of the said Plot of Land bearing Survey

Nos. 32, 32-A and 32-B and corresponding CTS. No. 428A, 428A/1 to 20

and 428B of Village Malad (N) some/balance Portion of the said Plot is

yet to be developed and Balance TDR and FSI of the whole Plot of Land

is to be ceraumed on the said plot of Land by the Co-Owners (1) Abdul

Latif Haji Adam, (2) Siraj Mohammed Haji Adam (3) Ashraf Mohammed

Haji Adam and (4) Abdul Sattar Haji Adam. All this is belonging to the

Co owners and we the Members of the SANJAR ENCLAVE PREMI SES

CO-OP, SOCIETY LTD. (PROPOSED) will not take any objection for the

same.

2. Adjoining to SANJAR ENCLAVE PREMISES CO-OP, SOCIETY LTD

PROPOSED) their are other old buildings on the same Plot of Land

which will be redevelopment by the Co-owners 

(1) Abdul Latif Haji Adam, (2) Siraj Mohammed Haji Adam (3) Ashraf

Mohammed Haji Adam and (4) Abdul Sattar Haji Adam on the said

property as and when the Co-owners will decide. We the Members of

SANJAR ENCLAVE PREMISES CO-OP, SOCIETY LTD PROPOSED) will

not take any objection for the same.

3. The Co-Owners/Vendors (1) Abdul Latif Haji Adam (2) S traj

Mohammed Haji Adam (3) Ashraf Mohammed Haji Adam and (4) Abdul

Sattar Haji Adam will be constructing additional buildings or separate

building in the same Plot of Land by utilizing the additional FSI on

account of TDR as may be available to the Co-Owners/Vendors as per

                PAGE NO.    19   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

the new Development Control Regulations published in 1991 as also

such further bene�t in FSI as may be available due to increase of FSI in

the same locality or due to any other provisions of the said Regulations,

we the Members SANJAR ENCLAVE PREMISES CO-OP. SOCIETY LTD.

(PROPOSED) will not take any objection for the same.

4. The Co-Owners/Vendors (1) Abdul Latif Haji Adam, (2) Siraj

Mohammed Haji Adam (3) Ashraf Mohammed Haji Adam and (4) Abdul

Setter Haji Adam may sell, assign, transfer or otherwise deal with their

right, title and Interest in the said Balance property/Layout and/or in

the building to be constructed thereon we the Members of the SANJAR

ENCLAVE PREMISES CO-OP. SOCIETY LTD.(PROPOSED) will not take

any objection for the same.

5. The Co-Owners/Vendors (1) Abdul Latif Haji Adam, (2) Siraj

Mohammed Haji Adam (3) Ashraf Mohammed Haji Adam and (4) Abdul

Sattar Haji Adam will make modi�cation, alteration, re-allocation or

change in layout or R.G as approved by the Municipal Corporation, we

the Members of the SANJAR ENCLAVE PREMISES CO-OP, SOCIETY

LTD.(PROPOSED) will not take any objection for the same.

6. The Co-Owners/Vendors (1) Abdul Latif Haji Adam, (2) Siraj

Mohammed Haji Adam (3) Ashraf Mohammed Haji Adam arid (4) Abdul

Sattar Ha� Ad um have already started development work in their

remaining part of land in their Layout, we the Members of the SANJAR

ENCLAVE PREMISES CO-OF SOCIETY LTD. (PROPOSED) will not take

any type of objection for the same including for all the plans approved

by the Authority.

7. The Sub Station for Whole layout is constructed in the Still Area of

SANJAR ENCLAVE PREMISES CO-OP. SOCIETY LTD.(PROPOSED) which

is approved by BMC. From this Sub-Station other Buildings in the same

plot of Land as and when the Co-Owners will develop Reliance Energy

will be giving connection to other Buildings which are to be constructed

in the same plot of Land for the Full Layout. We the Members of the

SANJAR ENCLAVE PREMISES CO-OP. SOCIETY LTD (PROPOSED) will

not take any objection for the sarme.

8. The Co-Owners/Vendors (1) Abdul Latif Haji Adam, (2) Size)

Mohammed Hajl Adam (3) Ashraf Mohammed Haji Adam and (4) Abdul

Sattar Haji Adam will execute the conveyance in favour of the Proposed

Society only after development of the whole layout bearing Survey Nos.

32, 32-A and 32-B and corresponding C.TS. No. 428A, 428A/1 to 20 and

428B of Village Malad (N) by them and we the Members of the SANJAR

                PAGE NO.    20   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

ENCLAVE PREMISES CO-OP SOCIETY LTD.(PROPOSED) do not have

any objection for the same.

We the Members of SANJAR ENCLAVE PREMISES CO-OP. SOCIETY

LTD.(PROPOSED), hereby given his/her consent to the

Co-Owners/Vendors (1) Abdul Latif Haji Adam, (2) Siraj Mohammed

Haji Adam (3) Ashraf Mohammed Haji Adam and (4) Abdul Sattar Haji

Adam for all above clauses mentioned in this Ar�davit in respect of

futher development of their layout. We the members will never interfere

nor arise any objections for further Development of the other buildings

which will be constructed at any time by the Co Owners in the said plot

of Land.

23) Thus, in the Af�davit-cum-No Objection dated 22 August

2014, the �at purchasers of the Sanjar Enclave building con�rmed that

their building stands on only a part of the plot and that the balance

FSI/TDR in respect of the entire plot belongs to the co-owners. That they

did not have objection to redevelopment of old building or for

construction of additional/separate buildings using TDR. That they have

no objection for modi�cation of the layout or RG etc. They also agreed

for execution of conveyance only after development of the whole layout.

24) According to Mr. Kakalia, the Af�davit-cum-No Objection

dated 22 August 2014 contains nothing but blanket consent clauses. He

submits that the Af�davit-cum-No Objection does not indicate in any

manner that the �at purchasers were shown either the approved plans or

details of proposed development. He has submitted that the Af�davit-

cum-No Objection was taken from the �at purchasers as a condition

precedent for formation of the Petitioner-society. Mr. Kakalia has

                PAGE NO.    21   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

therefore submitted that the Af�davit-cum-No Objection cannot be

treated as a consent within the meaning of Section 7 of MOFA.

25) On the other hand, Mr. Khandeparkar has submitted that the

Competent Authority cannot adjudge the issue of validity of those

consents as held by this Court in Satellite Garden I CHSL. Mr. Kakalia

has countered the submission by placing reliance on judgment of this

Court in Rose Villa CHSL. According to Mr. Kakalia, if the consents relied

upon by a developer/land owners contains blanket consent clause,

Competent Authority is justi�ed in ignoring them by treating them as

non-existing consents. He submits that in Rose Villa CHSL, this Court

has drawn a distinction between the concepts of existence of consent

and validity of consent.

26) In Rose Villa CHSL, there was a dispute before the

Competent Authority about the nature of consent letters. The society

therein had contended that what was secured by the developer was a

blanket consent whereas it was the contention of the developer that

consents were given after perusal of the approved plans. This Court has

ruled in Rose Villa CHSL by taking into consideration the judgment of

this Court in Nahalchand Laloochand Pvt. Ltd. Versus. Shree

Panchamurti CHSL

4

that in exercise of limited jurisdiction, Competent

Authority can conduct prima-facie enquiry about existence of or

otherwise of consent and that it need not blindly rely upon defence taken

by developer that �at purchasers have consented to the additional

construction in the building or in the layout. This Court has held that

4 2025 SCC Online Bom 341

                PAGE NO.    22   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

mere raising of a plea by a promoter/developer about existence of

consents by �at purchasers is not enough and the Competent Authority

can direct production of such consents and can satisfy itself about

existence or otherwise of such consents. This Court held in paragraphs

34 to 40 of the judgment as under :

34.In Nahalchand Laloochand (supra), this Court has held that the

Competent Authority can take into consideration the factum of

consents under Section 7 of MOFA. The Court held in paras-12 and 13

of the judgment as under:

12. The statutory �eld of the Maharashtra Ownership Flats

(regulation of the Promotion, Construction, Sale, Management

and Transfer) Act, 1963 (“MOFA”) imposes a threefold obligation

upon the promoter: (i) to execute and register agreements under

Section 4; (ii) to facilitate the formation of a legal entity or

society of �at purchasers under Section 10; and (iii) to execute a

conveyance of title within the stipulated timeline contemplated

under Section 11. The regulatory framework is further forti�ed

by Rule 8(1) of the Maharashtra Ownership Flats (regulation of

the Promotion, Construction, Sale, Management and Transfer)

Rules, 1964 (“the MOFA Rules”), which requires mat a

conveyance be executed within four months of the formation of

the society. Upon failure by the promoter to comply, the

competent authority is empowered under Section 11(4) of the

Act to grant a “deemed conveyance.” This legislative

intervention was introduced to address the systemic defaults of

errant promoters, who often failed to ful�ll their contractual and

statutory obligations, leaving �at purchasers perpetually

deprived of proprietary rights in the land and building.

13. However, it cannot be gainsaid that the competent

authority's functions under Section 11 are not unfettered. They

are circumscribed by fundamental norms of procedural fairness,

which include:

(i) veri�cation of the authenticity of the agreements and

consents under Section 7 of MOFA;

(ii) affording the promoter a reasonable opportunity to

contest the application under Rule 9(3) of the MOFA

Rules; and

(iii) ensuring that the society's claim aligns with the

sanctioned plan and the registered agreements.

(emphasis and underlining added)

                PAGE NO.    23   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

It is thus held in Nahalchand Laloochand that the Competent

Authority can conduct inquiry into authenticity of consents under

Section 7 of MOFA.

35.Thus, even in exercise of its limited jurisdiction, the Competent

Authority can conduct a prima facie enquiry about existence or

otherwise of consents to the additional construction in the building or

in the layout. Mere raising of a plea by a promoter/developer about

existence of consents by the �at purchasers is not enough and the

Competent Authority can direct production of such consents and can

satisfy itself about existence or otherwise of such consents. It therefore

cannot be contended that the issue of existence of consents under

Section 7 of MOFA is altogether outside the jurisdiction of the

Competent Authority.

36.Mr. Joshi has contended that once consent letters are produced

before the Competent Authority, it must accept the same and cannot

enter into the controversy as to whether the consents are valid or

otherwise. While there can be no dif�culty in accepting what is

suggested by Mr. Joshi, the issue for consideration is whether the

Competent Authority would blindly accept every consent and proceed

to reject the application for deemed conveyance? The answer, to my

mind, appears to be in the negative. Though the Competent Authority

cannot conduct a detailed enquiry into the validity of consents, it can

prima facie satisfy itself as to whether there exists a consent within the

meaning of Section 7 of MOFA or not. A party aggrieved by the decision

of Competent Authority can �le a suit and seek a declaration to the

contrary from Civil Court.

37.There is �ne distinction between ‘existence of consent’ and

‘validity of consent’. While the Competent Authority can record a

�nding about ‘existence’ of consent, it cannot determine the issue of

‘valid’ consent, which inquiry would fall squarely into the realm of a

Civil Court. However, whether mere production of a consent letter

would ouster jurisdiction of the Competent Authority is the issue for

consideration.

38.Promoters and developers do incorporate wide and blanket

clauses in the Agreements for Sale for recognising their entitlement to

milk future development potential in the land and the building. These

are popularly known as ‘blanket consent’ clauses. By now, the law is

well settled that such blanket consent clauses are

ineffective/unenforceable and do not entitle a developer to carry out

additional construction in the building or in the layout. While seeking

consent of �at purchasers for putting up additional construction in the

building or in the layout, it is mandatory that a full disclosure is made

                PAGE NO.    24   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

to the �at purchasers about the nature of additional construction. This

would include disclosure of the existing development potential, the

additional development potential made available, number of additional

�oors and additional �ats to be constructed etc. A developer cannot

simply secure consent to put up additional construction without

making disclosure of the necessary details. By now, the law is well

settled in this regard by judgments of this Court in Dosti Corporation,

Eternia CHSL and Ors. Vs Lakeview Developers and Ors.

5

and

Rajkumar Gulati and Ors. Versus. S.D. Corporation Pvt. Ltd. and Ors

6

.

39.Over the period of time, the promoters have exhibited a

tendency to circumvent the statutory provisions under MOFA about

embargo on additional construction contrary to disclosures. Obtaining

blanket consents from �at purchasers was one of the modus operandi,

which Courts were required to hold as unenforceable. After the blanket

consent clauses are held to be unenforceable, the developers have in

some cases started segregating the blanket consent clause from the

Agreements and printed the same in the form of a separate letter. The

clause is virtually the same empowering additional construction

without adequate disclosure. However, the same is in the form of a

separate letter. The issue for consideration is if such kind of consent

letters are produced, whether the Competent Authority would

immediately lose jurisdiction to decide the application of deemed

conveyance on the ground that the full construction as per the consent

letter is yet to be completed? Again, the answer to my mind appears to

be in the negative. Some prima facie inquiry by the Competent

Authority into ‘existence’ of consent would be necessary and production

of such letters would not mean that existence of consent is proved. It

can record a �nding that the consent letters do not conform to the

requirement of Section 7 of MOFA. Such �nding would be rebuttable

and can be questioned by the aggrieved developer before the Civil

Court. If it is held that the competent authority must reject the

application for deemed conveyance upon production of such letters

containing blanket consent clauses, the developers would take

disadvantage of such situation and would thereby delay conveyance of

land by securing such letters from �at purchasers while selling the �ats.

40.Thus, the Competent Authority needs to make a prima facie

enquiry into existence or otherwise of consents within the meaning of

Section 7 of MOFA even while deciding application under Section 11 of

MOFA. It cannot blindly rely upon the defence taken by developer that

�at purchasers have consented to additional construction. It can

conduct a prima facie inquiry into the aspect of disclosure preceding the

consent and if it �nds that the consent secured is without disclosing

any details of additional construction, it can ignore the consent letters

5 2015 SCC OnLine Bom 723

6 2025 SCC Online Bom 4370

                PAGE NO.    25   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

and proceed to convey the land. What it cannot conduct is an inquiry

into adequacy of disclosure. To illustrate, if consent for putting up

additional construction of disclosed area is secured, Competent

Authority cannnot go into issue as to whether disclosure includes

information about number of �oors/�ats, plinth of additional structure

etc. This inquiry would be about validity of consent and outside the

scope of inquiry of the Competent Authority. However, if a mere blanket

consent is produced, the Competent Authority can look into the same

and hold that there is no consent.

27) In the facts of the case in Rose Villa CHSL, this Court held

that at the time of execution of consents, plans were not approved. This

is clear from following observations made by this Court in paragraph 42

of the judgment:

42.Since consent letters referred to examination of the ‘approved

plans’, this Court repeatedly enquired with Mr. Joshi about the exact

plan which was allegedly disclosed to the �at purchasers at the time of

securing their consents. Till the petition was heard, Respondent No.2

had not placed on record any plan which was approved by MCGM at the

time of execution of the consent letters. On the contrary, it was always

the stand of Respondent No.2 that the revised Commenc ement

Certi�cate was issued for construction of 7

th

and 8

th

�oor in the year

2020. However, during the course of hearing and even after the hearing

ended, Mr. Joshi has placed on record copies of several plans. He has

placed on record the plan which was allegedly submitted to MCGM for

approval in the year 2017. He has referred to the said plan as a

‘Concession Approval’. However, there is nothing on record to indicate

that the plan allegedly submitted to MCGM for approval in September

2017, was approved and that such approved plan was brought to the

notice of the �at purchasers. Mr. Joshi has relied on a �owchart to

demonstrate as to how the plan submitted in September 2017 was

approved on 8 November 2017. Even if it is momentarily accepted that

the plan was indeed approved by MCGM on 8 November 2017, it is seen

that most of the consent letters are signed prior to 8 November 2017.

Only 7 consent letters in respect of 7 �ats are apparently signed after 8

November 2017. There are total 24 �ats in the building out of which 23

�ats are sold. This means that the consent letters in respect of 16 �ats

are executed before the alleged sanction of plan on 8 November 2017. It

therefore becomes dif�cult to accept that the �at purchasers were even

shown the approved plans for the purpose of securing their consents. In

                PAGE NO.    26   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

respect of majority of �ats, no approved plan in respect of 7

th

and 8

th

�oor of the building existed when their alleged consents were obtained.

28) In the present case, Mr. Kakalia has contended that

members of Petitioner-society were not shown the revised plans and

their blanket consents have been obtained. Ordinarily, following the

ratio of the judgment in Rose Villa CHSL, this Court could have directed

Competent Authority to undertake an enquiry into the aspect of

existence or otherwise of consents within the meaning of Section 7/7A of

MOFA. However, there is dif�culty in adopting such a course of action in

the facts of the present case. Petitioner did not seek any enquiry into

validity of consents before the Competent Authority. On the other hand,

it suppressed the Af�davit-cum-No Objection dated 22 August 2014 in

the deemed conveyance application. It also suppressed existence of

Akshar Kunj CHSL and Madina Manzil buildings in its d eemed

conveyance application. Far from seeking an inquiry before the

Competent Authority into the issue of validity of consents, Petitioner

�led L.C. Suit No. 1570 of 2020 before the City Civil Court, Dindoshi

inter-alia challenging the consents. Respondent Nos.3 to 7 have placed

on record copy of plaint in L.C. Suit No. 1570 of 2020. Prayer clause (a) of

the plaint reads thus:

(a) that this Hon'ble Court be pleased to declare that the undated suit

Af�davit cum No Objection on a stamp paper dated 22nd August, 2014

is illegal, bad in law, arbitrary, mala�de, unenforceable and not binding

upon the Plaintiffs;

29) Thus, the Petitioner-society accepted the position that

Competent Authority is not competent to decide the issue of existence or

                PAGE NO.    27   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

validity of consent and that the same need not be adjudicated by the

Civil Court. It has accordingly sought a declaration in the suit that the

Af�davit-cum-No Objection is illegal, bad in law, ab-initio void, arbitrary

and not binding on it. Having done so, the Petitioner cannot now turn

around and contend, by relying on this Court’s judgment in Rose Villa

CHSL, that the issue of the validity or otherwise of the consent must be

adjudicated by the Competent Authority in proceedings under Section 11

of the Act. Petitioner is bound by its conduct in not seeking adjudication

of issue of valid existence of consent by the Competent Authority in

Section 11 application. In my view therefore, the issue of valid existence

of consent can be adjudicated only by a Civil Court on account of �ling of

L.C. Suit No. 1570 of 2020 by the Petitioner.

30) If contention of Mr. Kakalia is accepted and if this Court

determines the issue of valid existence of consent, it would tantamount

to conduct of parallel inquiry on the same issue by two fora. Mr. Kakalia

has contended that, in the exercise of its wide jurisdiction under Article

227 of the Constitution of India, this Court is not precluded from

enquiring into the issues of validity of the consents or whether such

consents validly exist. However, what is being done in the present

petition by this Court is to examine correctness of order passed by the

Competent Authority. What the Competent Authority is precluded from

doing in law cannot be undertaken by this Court in the exercise of its

supervisory and corrective jurisdiction under Article 227 of the

Constitution of India. In the present case, the Petitioner did not seek

adjudication by the Competent Authority on the issue of the validity of

the consents. In any event, in view of the �ling of a suit seeking

                PAGE NO.    28   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

adjudication of the said issue after the �ling of the deemed conveyance

application, the Competent Authority cannot undertake that enquiry.

Thus, the Competent Authority is precluded by the Petitioner itself from

conducting enquiry into the valid existence of consents. It cannot now

turn around and contend that though Competent Authority has not

conducted that enquiry, this Court can conduct the same in exercise of

extraordinary jurisdiction under Article 227 of the Constitution of India.

31) Thus the Petitioner’s modi�ed prayer before this Court for

conveyance of proportionate land in the layout hinges squarely on the

issue of valid existence of consents. If consents executed by the members

of the Petitioner-society are found to be valid, modi�cations to the OC

plan dated 14 October 2009 would become valid for conveyanc e

purposes. All constructions carried out in pursuance of such consents

would be rendered valid in the eyes of law. Following the exception

recognised in judgment of this Court in Satellite Garden-I CHSL

conveyance would only be in accordance with modi�ed plans, which have

valid consents. On the other hand, if Petitioner succeeds in the suit and

secures a declaration that the Af�davit-cum-No Objection dated 22

August 2014 is illegal or void and does not amount to a consent under

Section 7 of MOFA, conveyance will have to be restricted as per OC plan

dated 14 October 2009. Petitioner therefore needs to await the decision

of L.C. Suit No. 1570 of 2020. Its claim to secure proportionate share in

the land can only be adjudicated after decision of prayer clause 61(a) in

L.C. Suit No. 1570 of 2020.

                PAGE NO.    29   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

32) Mr. Khandeparkar has relied on events that have occurred

after �ling of the present petition especially in relation to various orders

passed in L.C. Suit No.1570 of 2020. According to him, order dated 16

June 2021 is passed by the City Civil Court restraining Respondent Nos.3

to 7 only from constructing the suit building touching Sanjar Enclave

building. Otherwise, no injunction has been granted for construction of

the building in place of Madina Manzil building. Rejection of injunction

by order dated 16 June 2021 was challenged by the Petitioner-society by

�ling Appeal From Order No.142 of 2021 and by order dated 28 July 2021,

no further injunction is granted in favour of the Petitioner by this Court.

It appears that the plaint has been amended on 11 August 2023 for

claiming entire RG admeasuring 555.45 sq.mts, 60% share in another RG

of 518.87 sq.mts and possession of land component of 2222.52 sq.mts.

After completion of construction of building in place of Madina Manzil

building (Fortune Heights), part OC has been granted on 30 October 2024

and 19 October 2026.

33) In my view, however it is not necessary to take into

consideration the subsequent events post rejection of Petitioner’s

application for deemed conveyance. Even though the Trial Court has

refused injunction in favour of the Petitioner, it cannot be presumed at

this stage that the society may not succeed in the suit. Based on evidence

before it, if the Trial Court comes to the conclusion that the Af�davit-

cum-No Objection dated 22 August 2014 does not form valid consent

within the meaning of Section 7 of MOFA, the same would re�ect upon

validity of construction of Fortune Heights building. It is too early at this

                PAGE NO.    30   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

stage to speculate the exact outcome of the suit �led by the Petitioner. I

am therefore not inclined to make any observations about validity or

otherwise of consent contained in Af�davit-cum-No Objection dated 22

August 2014 and the entire issue is kept open for the City Civil Court to

decide. The City Civil Court shall consider whether appropriate

disclosures were made to the �at purchasers of the Sanjar Enclave

building before obtaining their consent on 22 August 2014, and whether

the consents so executed conform to the provisions of Section 7 of

MOFA. All rights and contentions of the parties in this regard are

expressly kept open.

34) I am therefore of the view that Petitioner cannot seek

conveyance of proportionate land at this stage based on OC plan dated

14 October 2009 i.e. land proportionate to BUA of 4109.64 sq. mts

utilised in its construction. It will have to await �nal decision of L.C. Suit

No. 1570 of 2020.

35) In my view therefore, Petitioner-society needs to await

decision of L.C. Suit No. 1570 of 2020 �led by it before the City Civil

Court. It is not that the building of the Petitioner-society is very old or

in a dilapidated condition. The OC therefor has been issued on 14

October 2009. The apprehension that the Petitioner carries is that

Respondent Nos.3 to 7 have already constructed building-Fortune

Heights in place of the earlier structure-Madina Manzil and that they are

likely to further redevelop the building Akshar Kunj CHSL by exploiting

the development potential in respect of the plot, part of which belongs to

it. The apprehension of the Petitioner-society is not totally unfounded.

                PAGE NO.    31   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

By delaying conveyance of the land till completion of la yout

development, Respondent Nos.3 to 7 basically want to exploit the entire

development potential created out of change in FSI regime. Petitioner’s

suit is already pending before the City Civil Court. In the event, any

further modi�cation in the plans is applied for by Respondent Nos. 3 to 7

for the purpose of carrying out further construction in the form of

redevelopment of the building of Akshar Kunj CHSL and if it is

demonstrated that Petitioner’s rights in respect of additional

development potential would be trampled upon, the Petitioner would

obviously be at liberty to seek appropriate temporary injunction in the

pending suit. It is also in the interest of the parties that the suit is

decided in an expeditious manner with a view to ensure that there is

clarity about the development activities that would be carried out in the

layout. If the consents are found to be invalid and contrary to the

provisions of Section 7 of MOFA, the same would obviously affect not

only the construction of Fortune Heights building, as well as further

construction to be carried out by Respondent Nos.3 to 7. It is therefore in

the interest of all the parties that L.C. Suit No. 1570 of 2020 is decided in

an expeditious manner.

36) Next issue for consideration is whether the Petitioner can

apply for conveyance of proportionate land even before completion of

process of redevelopment of Akshar Kunj building. The answer is in the

af�rmative. Mr. Khandeparkar has contended that in the Af�davits-cum-

Consent, the members of Petitioner-society have agreed for conveyance

only after the entire layout development. Even though the members of

the Petitioner-society may have agreed for execution of conveyance after

                PAGE NO.    32   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

development of the layout, there can be no estoppel against law. As of

now, conveyance of proportionate land in favour of the Petitioner-

society is postponed only on account of pendency of disputes relating to

validity of the consents. Provisions of MOFA read with Government

Resolution dated 22 June 2018 create a right in favour of a society in the

layout to secure conveyance of proportionate land even before

completion of development of the entire layout. As of now, the

development of the layout is complete as a co-operative society would be

formed in respect of Fortune Heights building and there are already two

other societies viz. Petitioner and Akshar Kunj CHSL. Redevelopment of

Akshar Kunj CHSL cannot be treated as incomplete layout development.

Even if the Petitioner loses in the suit, it would only have to agree for

proportionate land division by taking into consideration the BUA used in

construction of the building Fortune Heights/Madina Manzil. Pendency

of the suit or the agreement in the Af�davit for conveyance of land upon

completion of layout development does not give a right to the

landowners to continue milking the development potential in the land by

undertaking further development of Akshar Kunj building . The

competing claims as of now is only with regard to determining the

proportionate land of Fortune Height building. If the suit is decreed the

land division would be in accordance with the original plan and if the

suit is dismissed the land division would be as per the revised plan

sanctioned for construction of Fortune Heights building. In my view

therefore, immediately after decision of L.C. Suit No. 1570 of 2020,

Petitioner can apply for conveyance of proportionate land in its favour

and it is not necessary to await redevelopment of building of Akshar

Kunj CHSL. In fact, early disposal of the suit would provide clarity even

                PAGE NO.    33   of   34  

                3 November 2026

Neeta Sawant                                             WP-4710 OF 2022

qua the entitlement of Akshar Kunj CHSL as well. If Petitioner succeeds

in the suit, the success would enure to the bene�t of Akshar Kunj CHSL

as well and it can claim proportionate land in the layout as per the plan

dated 7 August 2003 and not as per the 2019/2020 plan of Fortune

Heights Building. To paraphrase, conveyance cannot be delayed to

further bene�t the land owners, for whom the time has arrived to quit

the scene so far as conveyance is concerned. It would therefore be

appropriate that the pending suit is decided in an expeditious manner.

37) In view of the above discussion, no interference is warranted

in the impugned order passed by the Competent Authority. The Writ

Petition is accordingly disposed of without granting the relief of

conveyance in Petitioner's favour at this juncture. However, Petitioner

would be at liberty to �le a fresh application for deemed conveyance

before the Competent Authority after decision of L.C. Suit No. 1570 of

2020. The City Civil Court shall decide the L.C. Suit No. 1570 of 2020 as

expeditiously as possible, preferably within 6 months. There shall be no

orders as to cost.

[SANDEEP V. MARNE, J.]

                PAGE NO.    34   of   34  

                3 November 2026

NEETA

SHAILESH

SAWANT

Digitally signed by

NEETA SHAILESH

SAWANT

Date: 2026.11.03

18:28:04 +0530

Reference cases

Description

Legal Notes

Add a Note....

Advance Search Tool

💡 How to Get the Best Legal Answers:

1. Keep it simple: Frame your question in plain language.

2. Add scope: Tag @ a court, judge, year, or act section for accurate results.

3. Attach files: Upload a PDF only if you are using a private document.

🌍 Ask in your language: English • Hindi • Assamese • Bangla • Gujarati • Kannada • Malayalam • Marathi • Odia • Punjabi • Tamil • Telugu • Urdu


💡 New Advocate? Don’t worry! Working without senior support today? Turn on Client Advisory to get instant legal strategies, practical angles, and precedent-backed options for your client.

Add research context Type to filter