Page 1 1

REPORTABLE

IN THE SUPREME COURT OF INDIA

CIVIL APPELLATE JURISDICTION

CIVIL APPEAL NO. 4842 OF 2017

(ARISING OUT OF SLP(CIVIL) NO.34384 OF 2016)

ESSAR STEEL INDIA LTD.  

AND ANR. … APPELLANT(S)

VERSUS

STATE OF GUJARAT AND ANR.    … RESPONDENT(S)

J U D G M E N T

ASHOK BHUSHAN,J.

1.This appeal has been filed against the Division

Bench   judgment   of   Gujarat   High   Court   dated

07.09.2016 dismissing Letters Patent Appeal of the

appellants affirming the judgment of Learned Single

Judge   dated   25.02.2010.   Special   Civil   Application

Page 2 2

was filed by appellant challenging the order dated

24.09.2099 passed by the State Government as well as

the demand notice dated 06.10.2009. Learned Single

Judge dismissed the Writ Petition.

2. Brief facts of the case which are necessary to be

noticed for deciding this appeal are: ­

The   appellant   no.1   is   duly   incorporated

company under the provisions of Companies Act, 1956

engaged   in   business   of   manufacturing   and   selling

steel products. The appellant no.2 is also a duly

incorporated   company   under   the   provisions   of

Companies Act, 1956, which is a generating company

selling/supplying  electrical  energy.  The  appellant

no.1 company set up its gas based steel plant at

Hazira,   in   the   year   1990   or   thereabout   for

production of HBI. It also set up a 20 MW Open Cycle

Power Plant for captive consumption of power for its

HBI plant. On the application made by the appellant

no.   1   Company,   the   State   Government   granted

exemption   from   payment   of   electricity   duty   for   a

Page 3 3

period of 10 years commencing from 21.07.1990 with

respect   to   the   said   Open   Cycle   Power   Plant.

Subsequently, the appellant no.1 Company converted

the said Open Cycle Power Plant of 20 MW into 30 MW

Combined   Cycle   Mode   Power   Plant   by   adding   steam

turbine.   Consequent   upon   such   conversion,   the

appellant   no.1   company   was   granted   by   the   State

Government   exemption   from   payment   of   electricity

duty   for   a   period   of   15   years   commencing   from

21.07.1990.   In   the   year   1991,   the   appellant   no.1

company also desired to put up a composite plant

after making substantial investment for production

of both HBI and HRC. Therefore, in or about the year

1991­92,   the   appellant   no.1   company   thought   of

setting up another Captive Power Plant of 300 MW of

capacity   in   Combined   Cycle   Mode   at   Hazira   for

meeting its requirement of more power. The appellant

thought   of   doing   so,   in   view   of   the   benefits

available to the Captive Power Plant at the relevant

time.   The   Government   of   Gujarat   and   the   Gujarat

Electricity Board granted in principle approval to

Page 4 4

the appellant no.1 company for setting up the said

Captive Power Plant of 300 MW. There was, however, a

change in the Power Policy of Government of India,

in the year 1991­92, which allowed the participation

of private sector in power generation. Government of

Gujarat also, with a view to give effect to that

policy, issued a Notification dated 27.02.1992 under

Section   3   of   the   Bombay   Electricity   Duty   Act,

1958(hereinafter   referred   to   as   1958   Act).   The

appellant   no.1   Company,   therefore,   abandoned   its

plan to set up the said Captive Power Plant of 300

MW in Combined Cycle Mode and in place and instead

thereof,   promoted   and   incorporated   a   separate

generating   company   under   the   name   and   style   of

“ESSAR   Power   Limited”,   the   appellant   no.2   is   a

Special Purpose Vehicle promoted by the appellant

no.1 company for supply of power to the appellant

no.1 company as well as to the Gujarat Electricity

Board.

Page 5 5

3. The   Government   of   Gujarat   issued   an   Order

dated 16.06.1995 agreeing in principle to the demand

of   appellant   no.2   to   set   up   510   MW   generating

station   at   Hazira.   The   appellant   no.2   started

production   of   electricity   w.e.f.   08.08.1995.   The

appellant   no.1   held   equity   shares   of   42%   of

appellant   no.2   company.   Out   of   515   MW,   300   MW

capacity   has   been   allocated   to   GEB   (Gujarat

Electricity   Board)   which   constitute   58%   of   the

installed   capacity,   remaining   capacity   of   215   MW

which constitute 42% to the ESSAR Group of company

as   per   the   stipulation   contained   in   the   Power

Purchase Agreement dated 30.05.1996.

4. The  appellant   no.1   had   filed   an  application

dated 15.03.2001 seeking exemption from payment of

electricity   duty   under   the   notification   dated

27.02.1992 issued under Section 3(3) of the Bombay

Electricity Act, 1958 (hereinafter referred to as

Act 1958). Another application dated 12.04.2001 was

sent   by   appellant   no.1   to   the   Commissioner   of

Page 6 6

Electricity seeking exemption from electricity duty

for a period of 15 years under Section 3(2)(vii)(a)

(i) of 1958 Act. The State of Gujarat Vide Order

dated 23.12.2002 rejected the request for exemption

under Section 3(2). The Order dated 23.12.2002 was

challenged in the High Court Wherein High Court vide

Order dated 17.03.2003 left open to the Government

to take a fresh decision. The State Government again

by Order dated 23.01.2006 rejected the application

of appellant no.1 for grant of exemption for payment

of   electricity   duty   for   215   MW   power   generation

equivalent to 42% of the total generation. The Writ

Petition was again filed challenging the Order dated

23.01.2006 in which High Court set aside the Order

dated 23.01.2006 and directed the Government to pass

a   fresh   Order.   The   State   Government   passed   the

detailed Order dated 24.12.2009 rejecting the claim

of   appellant   no.1   for   exemption   of   payment   of

electricity duty both under Section 3(2)(vii)(a)(i)

as   well   as   under   notification   dated   27.02.1992.

After   decision   dated   24.09.2009   recovery   notice

Page 7 7

dated   06.10.2009   was   issued   for   payment   of

electricity   duty   amounting   to   Rs.562/­   Crores

together with interest totaling Rs.1038.27/­ Crores

for the period of April 2000 to August 2009. The

Order   of   State   Government   dated   24.09.2009   was

challenged by the appellants before the High Court

by means of Special Civil application no. 10946 of

2009.   Learned   Single   Judge   dismissed   the   Writ

Petition   vide   its   judgment   dated   25.02.2010

aggrieved against which Letters Patent Appeal was

filed by the appellants. In Letters Patent Appeal,

an interim order was granted on conditions:

i)The appellant shall pay a sum of Rs.50

Crores   against   the   outstanding   dues   of

electricity   by   30.04.2010   in   two

installments of Rs.20 Crores each.

ii)The appellant no.1 shall further pay from

01.05.2010   a   sum   of   Rs.15   Crores   every

month   against   the   outstanding   dues   of

electricity.

Page 8 8

5. The Letters Patent Appeal ultimately came to

be dismissed by Division Bench on 07.09.2016 against

which judgment the present appeal has been filed.

6. We   have   heard   Shri   Mihir   Joshi,   Senior

Advocate for the appellants and Shri C.A.Sundram,

Senior Advocate appearing for the respondents.

7.  Learned Counsel for the appellants contends that

the issue is squarely covered in its favour by a

decision   of   this   Court   in   A.P.   Gas   Power

Corporation   Ltd.   Versus   AP   State   Regulatory

Commission and another, (2004) 10 SCC 511,   wherein

it   was   held,   inter   alia,   that   the   electricity

generated by a Special Purpose Vehicle and consumed

by the participating member to the extent of its

equity   contribution   would   amount   to   captive

consumption of electricity. The High Court in the

impugned   judgment,   however,   distinguished   the

aforesaid judgment of this Court on the ground that

in   that   case   the   parties   were   governed   by   a

Memorandum of Understanding (“MoU”) which was not

Page 9 9

there   in   the   present   case   and   secondly,   on   the

ground that ESIL was purchasing 215 MW of power from

EPL.

8. It is further submitted that rejection of the

application on the ground that same was not made in

the   prescribed   form   under   Rule   11   of   Bombay

Electricity Duty Rules, 1968 is erroneous and had

the rejection being only on the ground of non­filing

the application at the first stage same could have

been done since the State had power to condone the

delay. Alternatively, the appellant was entitled for

exemption   under   notification   dated   27.02.1992   by

reason of the fact that ESIL was jointly generating

electricity   with   EPL   and   had   also   purchased   the

generating sets by making payments of the purchase

price to the vendors during the period prescribed.

It   is   further   contended   that   in   the   similar

circumstances the Government of Gujarat had extended

the benefit of exemption from payment of electricity

duty to GIPCL and therefore, ESIL who is similarly

Page 10 10

situated   cannot   be   deprived   of   benefits   of

exemption.

9. Learned   Counsel   appearing   for   the   State

refuting   aforesaid   submission   contends   that

Government   as   well   as   High   Court   has   rightly

rejected   the   claim   of   exemption   of   duty.   The

appellant   neither   fulfills   the   statutory

requirements   under   Section   3(2)   nor   fulfill   the

conditions   of   the   notification   dated   27.02.1992.

ESSAR   Power   and   ESSAR   Steel   are   separate   and

independent   legal   entities.   ESSAR   Steel   is   not

generating   energy.   ESSAR   Steel   is   not   generating

either   singly   or   jointly   with   either   GEB   or   its

successor entity, Gujarat Urja Vikas Nigam Limited

or   even   with   ESSAR   Power.   ESSAR   Power   is   not

generating   energy   for   its   own   use.   ESSAR   Power

Limited has established 515 MW power station, out of

which 300 MW capacity has been allocated to Gujarat

Electricity Board (GEB). Thus 58% of the installed

capacity is allocated to GEB and in relation to such

Page 11 11

capacity; ESSAR Power Limited generates and sells

electricity as a generating station and not as a

captive Power Plant of GEB. The remaining capacity

of 215 MW, which constitutes 42%, is for ESSAR Group

of Companies, as per the stipulation contained in

the   Power   Purchase   Agreement   dated   30.05.1996

entered into between ESSAR Power and GEB as well as

the   Power   Purchase   Agreement   dated   29.06.1996

entered into between ESSAR Power and ESSAR Steel.

The clauses in each of these agreements is clearly

inconsistent   with   ESSAR   Power   being   treated   as

captive   generation   and   use   within   the   scope   of

Section 3(2)(vii) of the 1958 Act. The appellant has

rightly   been   denied   the   benefit   of   exemption   as

claimed under the notification dated 27.02.1992. The

condition   of   the   notification   dated   27.02.1992

specifically states that the generating set or sets

shall   have   to   be   purchased   or   installed   or

commissioned   during   the   period   beginning   from

01.01.1991 and ending on 31.12.1992. This does not

cover order placed for the purchase of generating

Page 12 12

set. Since ESSAR Steel has merely placed the order

for   generating   set   but   neither   purchased   nor

installed or generated within the period specified

in the aforesaid notification, it is not fulfilling

this condition and hence not entitled for benefits

of   the   said   notification.   In   case   of   purchase,

property in goods is transferred to the owner, here,

in   given   case,   property   in   goods   cannot   be

considered   as   transferred   when   same   is   simply

ordered.

10. Learned  Counsel  for  the  parties  have   placed

reliance   on   various   judgments   of   this   Court   in

support of their respective submission which shall

be referred to while considering the submissions in

detail.

11. We have considered the submissions of Learned

Counsel for the parties and perused the records. 

12. From the facts which have come on the record

it   is   clear   that   appellant   no.1   had   claimed

Page 13 13

exemption from duty under the provisions of Section

3(2)(vii) as well as under the notification issued

under Section 3(3) of 1958 Act for different period

which   exemption   was   earlier   granted.   Details   of

benefit of exemption availed by appellant no.1 has

been extracted by Division Bench of High Court in

Para 5.4 of the judgment. It is useful to extract

the table quoted in the judgment which is quoted

below to the following effect:

Sr.

No.

Date of

Application

seeking

exemption

from Duty

Prescribed

Form No.

for making

application

Applicable

provision for

exemption under

GED Act, 1958

Source of

electricity

supply

Date of

Issue of

Certificate

of

Exemption

Exemption

period

(1) (2) (3) (4) (5) (6) (7)

1.21.7.1990Form ‘E’Sec. 3(2) (vii) (a)

(ii)

20 MW

+ 1380 KVA

+ 590 KVA

+ 1500 KVA

of

Self-generating

sets of ESSAR

Steel

1.9.199521.7.1990

to

29.9.1999

2.30.7.1990Form 'F' Sec. 3(2) (vii)

(b)

GEB

connection No

HT 159

28.1.199219.12.1991

to

26.3.1995

Page 14 14

3.May, 1995Form 'F'Notification dt.

30.6.1993 issued

under

Sec. 3(3)

GEB

connection No

HT 0159/ HT

10029

+ 215 MW

from ESSAR

Power

(exclusively for

HRC Project)

6.9.199531.3.1995

to

30.3.2000

4.30.1.1996Form E Sec. 3(2) (vii) (a)

(i)

20 MW

(existing)

+ 11 MW i.e.

Co- generation

plant

26.11.199815.12.1995

to

29.9.2004

13. In   the   present   case,   no   application   in   the

prescribed   form   as   per   Rule   11   of   the   Rules   was

filed by the appellant no.1 and for the first time

the appellant had come up with an application dated

15.03.2001 seeking an exemption under notification

dated 27.02.1992 and subsequently on 12.04.2001 has

again claimed exemption under Section 3(2)(vii)(a)

(i) of 1958 Act. The exemption from payment of duty

as   claimed   by   the   appellant   is   in   two   parts.

Firstly, under Section 3(2)(vii)(a)(i) of 1958 Act

and   secondly,   under   the   notification   dated

27.02.1992.   We   proceed   to   examine   both   the   claim

separately.

Page 15 15

Claim under Section 3(2)(vii)(a)(i)

14. Section   3   of   1958   Act   deals   with   “duty   on

units of energy consumed”. Sub­Section 2 enumerates

various circumstances under which duty shall not be

leviable on the units of energy consumed. Section

3(2)(vii)(a)(i) and 3(3) is quoted below:

“3.  Duty   on   units   of   energy

consumed... ... ...

(2)   Electricity   duty   shall   not

be leviable on the units of energy

consumed.........

(vii)  for   motive   power   and

lighting   in   respect   of   premises

used by an industrial undertaking

for industrial purpose, until the

expiry   of   the   following   period,

that is to say­

(a)In the case of an industrial

undertaking   which   generates

energy   either   singly   or

jointly   with   any   other

industrial   undertaking   for

its own use or as the case

may   be,   for   the   use   of

industrial   undertakings

which are jointly generating

the energy.

(i) Fifteen   years   from

the   date   of

commencement   of   the

Page 16 16

Bombay   Electricity

Duty   (Gujarat

Amendment)   Act,

1983(hereinafter   in

this   sub­section   and

sub­sections (2A) and

(2AA) referred to as

“the   commencement

date”) or the date of

starting   the

generation   of   such

energy   whichever   is

later   in   such

generation   of   energy

is   by   back   pressure

turbine   or   if   such

generation   of   energy

is   obtained   by

co­generation.

(3) The State Government may, by

notification   in   the   Official

Gazette, and subject to such terms

and conditions as may be specified

therein, reduce the rate of duty or

remit the duty in respect of­

......”

15. The   keywords   in   the   statutory   scheme   are

“generates energy either singly or jointly with any

other industrial undertaking for its own use or as

the   case   may   be,   for   the   use   of   industrial

undertaking   which   are   jointly   generating   the

energy.”   We   have   to   look   into   the   facts   of   the

Page 17 17

present case to find out as to whether the statutory

conditions   enumerated   above   are   satisfied   in   the

facts of the present case or not. The appellant no.1

is   a   separate   registered   company   which   holds   42%

equity shares of the appellant no.2. The appellant

no.2   has   been   constituted   as   a   Special   Purpose

Vehicle   for   generating   electricity.   The   appellant

no.2 is a generating company within the meaning of

Section 2(4A) of Electricity (Supply) Act, 1948. The

submission which has been pressed by the counsel for

the appellant is that both the appellant no.1 and

appellant no.2 are generating energy jointly for the

use   of   industrial   undertaking   which   are   jointly

generating the energy.

16. As   noted   above,   there   is   a   Power   Purchase

Agreement   dated   30.05.1996   and   01.06.1996   which

contains various conditions for sale of electricity

by appellant no.2. The State Government in its order

dated 24.09.2009 has extracted the recitals in Power

Page 18 18

Purchase agreement dated 01.06.1996 which are to the

following effect: ­

“...WHEREAS   the   Company   is   a

Generating Company as defined under

clause   4(A)   of   Section   2   of   the

Electricity (Supply) Act, 1948

AND   WHEREAS   the   Company   has

substantially implemented a 515 MW

combined   Cycle   Generating   Station

at Hazira Dist. Surat, Gujarat of

which it has already commissioned 3

x 110 MW Gas Turbine Generating Set

an aggregate generating Capacity of

330 MW.

AND WHEREAS the Company is setting

up the said Generating Station and

has   been   permitted   as   a   special

case to supply power to its sister

concerns viz. ESSAR Steel Ltd. and

ESSAR Oil Ltd, hereinafter jointly

and severally referred to as ‘ESSAR

Group Companies’.

AND   WHEREAS   ESTL   which   is   engaged

in   the   manufacture   of   Steel

products   at   Hazira,   intends   to

purchase   electrical   output

generated by the Generating Station

equivalent   to   138   MW   capacity   in

the   Open   Cycle   mode   and   215   MW

capacity   in   Combined   Cycle   mode

operation (hereinafter collectively

or   severally   referred   to   as   the

‘Allocated Capacity’) on the terms

and   conditions   set   forth   in   this

Agreement.

Page 19 19

16.   Article   3   of   the   PPA   dated

01.06.1996   between   ESSAR   Power

Limited   and   ESSAR   Steel   Limited

reads as under:

3.1 ALLOCATION OF CAPACITY

The allocation of capacity shall

be as under:

(a) During Open Cycle mode operation

prior   to   commissioning   of   the

Combined Cycle mode operation the

Company shall allocate:

138 MW to the ESTL; and 

192 MW to GEB

(b)During Combined Cycle mode

215 MW to the ESTL; and 

300 MW to GEB

 ..........   ..................”

17. Even   assuming   appellant   no.1   and   appellant

no.2 are jointly generating the energy for the use

of   industrial   undertaking   which   are   jointly

generating the energy, the Gujarat Electricity Board

to whom 300 MW has been allocated cannot be held to

be   industrial   undertaking   which   is   jointly

generating the energy with appellant. The Statutory

scheme for grant of exemption has to be strictly

construed.   The   appellant   no.2   is   not   jointly

generating energy with Gujarat Electricity Board and

it is selling the energy to the extent of 300 MW to

Page 20 20

Gujarat   Electricity   Board.   The   conditions   of   the

statutory provisions of Section 3(2)(vii)(a) are not

fulfilled. The High Court has further held that both

ESL and EPL being distinct separate legal entities

merely because ESL might have 42% shares holding in

EPL,   it   cannot   be   said   that   ESL   is   generating

electricity jointly with EPL and EPL is generating

electricity jointly with ESL for use of electricity

by ESL.

18. The   statutory   conditions   for   grant   of

exemption as contained in Section 3(2)(vii)(a) can

neither   be   tinkered   with   nor   diluted.   Learned

Counsel for the appellant contends that the State

Government had granted permission to the ESSAR Power

Plant to set up a generating station as a special

case   and   to   supply   power   generated   by   it   to   its

sister concerned i.e. ESSAR Steel and ESSAR Oil as a

special   case.   The   letter   of   the   State   Government

dated 05.06.1995 further stated that if there is any

excess   power   generated   by   EPL,   the   same   may   be

Page 21 21

purchased by the Board at the price  decided by the

Board.   It   is   useful   to   extract   the   letter   of

permission   dated   05.06.1995   issued   by   the   State

Government which was to the following effect:­

"The   Govt.   has   considered   all   the

aspect on the above matter and after

careful   consideration,   has   decided

to agree in principle to the demand

of ESSAR Power Limited to set up a

generating   station   as   a   special

case, and to supply power generated

by   it   to   its   sister   concern,   i.e.

ESSAR   Gujarat,   ESSAR   Steels   and

ESSAR   Oil   again   as   a   special   case

only   subject   to   fulfillment   of

requirements of legal provisions as

laid   down   under   Section   15­A   and

18­A of the Electricity Supply Act

and with the express condition that

the   power   generated   through   this

subject shall never as sold outside

the   State   or   to   any   other   person

except as mentioned above. Moreover,

in case, the power generated by EPL

is to be wheeled, GEB shall decide

the wheeling rate according to the

sound   commercial   principles.   In

addition   to   this,   if   there   is   any

excess power generated by EPL, the

each may be purchased by the Board,

at   a   price   decided   by   the   Board

subject   to   the   norms   laid   down   by

GoI from to time.

Page 22 22

It   is,   therefore,   requested   that

GEB may take further necessary action

in the matter.”

19. We   have   noticed   above   that   Power   Purchase

Agreement   allocated   the   energy   to   the   Gujarat

Electricity Board to the extent of 58% and 42% power

supply was to be given to sisters concern i.e. ESSAR

Gujarat,   ESSAR   Steel   and   ESSAR   Oil   as   a   special

case. It is well settled that taxing statute are to

be   strictly   construed   specifically   the   exemption

notification. It has been held that the statutory

provisions   providing   for   exemption   has   to   be

interpreted in the light of words employed in it and

there cannot be any addition or substraction from

the statutory provision. This Court in  Commissioner

of   Central   Excise,   Surat­I   versus   Favourite

Industries,   2012   (7)   SCC   153,  while   considering

exemption notification issued under Central Excise

Tariff Act, 1985 laid down following in paragraph 35

to 40:­

"35. The notification requires to be

interpreted   in   the   light   of   the

Page 23 23

words employed by it and not on any

other   basis.   There   cannot   be   any

addition   or   subtraction   from   the

notification   for   the   reason   the

exemption   notification   requires   to

be strictly construed by the courts.

The   wordings   of   the   exemption

notification   have   to   be   given   its

natural   meaning,   when   the   wordings

are simple, clear and unambiguous.

36.  In Commr. of Customs v. Rupa &

Co.   Ltd.,   this   Court   has   observed

that the exemption notification has

to be given strict interpretation by

giving   effect   to   the   clear   and

unambiguous   wordings   used   in   the

notification.   This   Court   has   held

thus: (SCC pp. 413­14, para 7)

“7. … However, if the interpretation

given by the Board and the Ministry

is clearly erroneous then this Court

cannot   endorse   that   view.   An

exemption   notification   has   to   be

construed strictly but that does not

mean that the object and purpose of

the notification is to be lost sight

of   and   the   wording   used   therein

ignored.   Where   the   wording   of   the

notification   is   clear   and

unambiguous,   it   has   to   be   given

effect   to.   Exemption   cannot   be

denied by giving a construction not

justified   by   the   wording   of   the

notification.”

(emphasis supplied)

Page 24 24

37.  In   CCE   v.   Rukmani   Pakkwell

Traders,   this   Court   has   also   held:

(SCC p. 804, para 5)

“5.   …   It   is   settled   law   that

exemption   notifications   have   to   be

strictly   construed.   They   must   be

interpreted   on   their   own   wording.

Wordings of some other notification

are   of   no   benefit   in   construing   a

particular notification.”

(emphasis supplied)

38. In Kohinoor Elastics (P) Ltd. v. 

CCE this Court has held: (SCC p. 533,

para 7)

“7. … When the wordings of the 

notifications are clear and 

unambiguous they must be given 

effect to. By a strained reasoning 

benefit cannot be given when it is 

clearly not available.”

(emphasis supplied)

39. In Compack (P) Ltd. v. CCE, this

Court has observed thus: (SCC p. 

306, para 20)

“20. Bhalla Enterprises laid down a

proposition that notification has to

be   construed   on   the   basis   of   the

language   used.   Rukmani   Pakkwell

Traders

16

  is   an   authority   for   the

same   proposition   as   also   that   the

wordings of some other notification

are   of   no   benefit   in   construing   a

particular   notification.   The

notification   does   not   state   that

exemption cannot be granted in a case

where all the inputs for manufacture

Page 25 25

of containers would be base paper or

paperboard.   In   manufacture   of   the

containers   some   other   inputs   are

likely to be used for which MODVAT

credit facility has been availed of.

Such   a   construction,   as   has   been

suggested by the learned counsel for

the   respondents,   would   amount   to

addition of the words ‘only out of’

or ‘purely out of’ the base paper and

cannot   be   countenanced.   The

notification has to be construed in

terms of the language used therein.

It   is   well   settled   that   unless

literal meaning given to a document

leads   to   anomaly   or   absurdity,   the

golden rule of literal interpretation

shall be adhered to.”

(emphasis supplied)

40.  In CCE v. Mahaan Dairies, this

Court has held: (SCC p. 800, para 8)

“8. It is settled law that in order

to claim benefit of a notification,

a   party   must   strictly   comply   with

the terms of the notification. If on

wording   of   the   notification   the

benefit   is   not   available   then   by

stretching   the   words   of   the

notification or by adding words to

the   notification   benefit   cannot   be

conferred.   The   Tribunal   has   based

its decision on a decision delivered

by it in Rukmani Pakkwell Traders v.

CCE. We have already overruled the

decision in that case. In this case

also   we   hold   that   the   decision   of

the Tribunal is unsustainable. It is

accordingly set aside.”

(emphasis supplied)”

Page 26 26

20. The statutory provisions of Section 3(2)vii(a)

thus have to be strictly construed and in event the

condition   of   generating   energy   jointly   with   any

other industrial undertaking is not fulfilled, the

claim has to be rejected.

21. Learned   Counsel   for   the   appellant   submits

appellant   is   claiming   exemption   from   excise   duty

only to the extent of its shareholdings i.e. 42%.

The object for grant of exemption to the industrial

undertaking which generates energy either singly or

jointly   is  for   the   use   of   industrial   undertaking

which are jointly generating the energy.     When in

the present case, 58% of the energy generated has

been   allocated   to   Gujarat   Electricity   Board   with

whom appellant No. 2 is not jointly generating the

energy, the Statutory provisions has to be strictly

construed and when energy being generated is used by

industrial   undertaking   which   is   not   jointly

generating the energy the claim is not covered under

Section 3(2)(vii)(a).

Page 27 27

22. Learned   Counsel   for   the   appellant   has   also

referred to the judgment of this Court in  State of

U.P.   and   Ors.   versus   Renusagar   Power   Company   &

Ors.,   1988(4)   SCC   59.  In   the   above   case,   M/s

Renusagar Company had obtained a sanction to engage

in   the   business   of   supply   of   electricity   to   M/s

Hindustan Aluminium Corporation Ltd. In the above

case, this Court took the view that corporate Veil

should be lifted and Hindalco and Renusagar may be

treated   as   one   concern   and   the   Renusagar   Powers

Plant   must   be   treated   as   the   owned   source   of

generation   of   Hindalco.   Following   was   held   in

paragraph 67:­

"67.  In   the   aforesaid   view   of   the

matter   we   are   of   the   opinion   that

the corporate veil should be lifted

and   Hindalco   and   Renusagar   be

treated   as   one   concern   and

Renusagar’s   power   plant   must   be

treated   as   the   own   source   of

generation of Hindalco and should be

liable to duty on that basis. In the

premises   the   consumption   of   such

energy by Hindalco will fall under

Section   3(1)(c)   of   the   Act.   The

learned   Additional   Advocate­General

for   the   State   relied   on   several

Page 28 28

decisions, some of which have been

noted.”

23. In the present case, there is no dispute to

the   fact   that   appellant   No.2   was   created   as   a

Special Purpose Vehicle by appellant No.1 itself.

Had appellant No.2 would have been supplying energy

to   appellant   No.1   only,   the   claim   deserved

consideration.     But   present   is   a   case   where   the

appellant   no.2   is   supplying   energy   to   industrial

undertakings with whom it is not jointly generating

the energy. Judgment of this Court in State of U.P.

and Renusagar Company, thus, has no application in

the facts of present case.

24. Learned Counsel for the appellant has placed

reliance   on   judgment   of   this   Court   in  A.P.   Gas

Power Corporation Ltd. Versus A.P. State Regulatory

Commission   &   Another,   2004   (10)   SCC   511.   In   the

above case, the State Government of Andhra Pradesh

and Andhra Pradesh Electricity Board had mooted the

idea of setting up of 3 X 33 MW gas­based Combined

Page 29 29

Cycle Power Station for establishing a generating

station.   It   was   decided   to   invite   private

participation   in   the   venture.   A   Memorandum   of

Understanding dated 17.10.1988 and on 19.04.1997 was

entered   according   to   which   Andhra   Pradesh   State

Electricity Board had to have 26% shares in the new

company   to   come   up   as   A.P.GPCL   and   rest   of   the

participating   industries   were   to   have   different

percentage of shares and the power so generated by

company   was   to   share   proportionately   among   the

shareholding   participating   companies   and   their

sister   concerns.   The   question   which   fell   for

consideration before this Court was as to whether

A.P.GPCL was required to take a license under the

law   for   utilization/sale   and   supply   of   power

generated   by   the   participating   industries,   their

sister concerns and the companies to whom shares of

APGPCL   were   transferred   by   the   participating

industries.

Page 30 30

25. This   Court   after   noticing   the   contents   of

various clauses of Memorandum of Understanding and

the provisions of Indian Electricity Act, 1910 and

Andhra Pradesh Electricity Reform Act, 1998, laid

down following in paragraph 36 and 37:

“36. From the perusal of para 4

of the Memorandum of Understanding

it   is   clear   that   a   participating

industry has been given a right to

transfer   its   share   of   energy   and

power   to   its   sister   concern.   The

term   “sister   concern”   has   been

explained   as   “a   concern   under   the

same   group.”   There   is   no   further

clarification   or   clue   as   to   which

are   those   concerns   which   may   be

considered   under   the   same   group.

The   expression   “sister   concern”

used in para 4 of the Memorandum of

Understanding   certainly   does   not

mean a concern which is owned or is

a   subsidiary   of   the   participating

industry. It would be a concern or

unit   different   from   the

participating   industry   and   not   a

part   of   it.   Maybe,that   the   same

group   may   manage   two   different

independent   units   carrying   on   the

same nature of activities. They may

be addressed as sister concerns but

would   definitely   have   separate

entity   and   identity   of   their   own.

Consumption of power, generated by

a generating company, by a concern

which may be under the same group

as   any   of   the   participating

Page 31 31

industry   cannot   be   said   to   be

consumption or use of the power by

the   participating   industry   itself.

In   absence   of   the   element   of

self­consumption   by   the   generating

company, it would not fall in the

category   of   “captive   consumption”.

It   would   surely   be   a   supply   to   a

non­participating   industry   and   in

that event it would be necessary to

have   a   licence   under   the   relevant

provisions of law. If there is such

a   legal   requirement,   merely   an

agreement   amongst   certain   parties

would   not   exclude   the   application

of   law.   Provisions   of   law

regulating   the   situation   would

prevail over any kind of agreement

amongst some individuals as a group

or otherwise. We are, therefore, of

the view that such a clause in the

Memorandum   of   Understanding   would

not do away with the requirement of

having   a   licence   for   supply   of

electricity   generated   by   A.P.GPCL

to such concerns which may be under

the same group as the participating

industries   but   not   the

participating   industries

themselves.

37.   To   support   the   view   taken   by

us,   a   decision   of   this   Court

referred to by the respondents may

be   cited   as  in   State   of  U.P.   Vs.

Renusagar   Power   Co.   This   case,

however, was decided in a slightly

different   fact   situation.   M/s

Hindustan   Aluminium   Corporation

Ltd.   was   established   in   1959   on

assurance   of   providing   cheap

Page 32 32

electricity   to   it.   In   the   year

1964, however, M/s Renusagar Power

Co.   Ltd.   was   established   as   a

wholly owned and subsidiary of M/s

Hindustan   Aluminium   Corporation

Ltd. It was generating electricity,

but incorporated separately and had

its   own   separate   Memorandum   of

Understanding   and   Articles   of

Association.   To   raise   the   revenue

for the State, the U.P. Electricity

(Duty)   Act,   1952   was   enforced   to

levy a duty on the consumption of

electricity.   Several   amendments

were,   however,   incorporated   from

time   to   time   and   ultimately   a

provision   was   inserted   providing

that there would be levied and paid

to   the   State   Government   a   duty

called   electricity   duty   on   the

energy   sold   to   a   consumer   by   a

licensee/Board/the   Central

Government. The duty on consumption

of   electricity   was   leviable   even

though   it   may   be   from   his   own

source   of   generation.   Renusagar

Power Co. Ltd. had also obtained a

licence under Section 28 of the Act

of 1910. In such circumstances, it

was held that even though Renusagar

Power   Co.   Ltd.   was   a   subsidiary

company   owned   by   M/s   Hindustan

Aluminium   Co.   Ltd.,   yet   it   would

amount to supply of electricity by

a licensee to a consumer in view of

the provisions of the U.P. Act of

1952   which   levied   duty   on

consumption   of   electricity.   The

situation   in   the   case   in   hand   is

similar only to the extent that the

participating   industries   and   the

Page 33 33

sister   concerns   are   different

entities   and   separately

incorporated.   Distinction   may   be

there   in   view   of   the   statutory

provisions   intervening   under   the

U.P.   Act   of   1952   but   that   is   not

material for this case.”

26. Ultimately, the appeal was partly allowed and

judgment   of   the   High   Court   was   modified   vide

paragraph   57   of   the   judgment   which   is   to   the

following effect: ­

“57. We, therefore, hold that no

licence   is   necessary   for

utilization of energy generated by

A.P.GPCL   and   utilized   by   the

participating   industries   and   the

concerns holding shares of A.P.GPCL

transferred   to   them   by   the

participating   industries   to   the

extent   of   value   of   the   shares   so

transferred. It would, however, be

necessary   to   have   a   licence   for

supply   of   energy   to   the   sister

concerns.   In   the   result,   the

appeals are partly allowed and the

judgment   and   order   passed   by   the

High   Court   stands   modified   in   the

manner indicated above. Parties to

bear their own costs.”

Page 34 34

27. The   judgment   of   Andhra   Pradesh   Gas   Power

Corporation Limited is clearly distinguishable and

does not help the appellant in present case. In the

aforesaid   case   the   energy   was   utilized   by   the

participating industries and the concerned holding

shares   of   A.P.GPCL   but   supply   of   energy   to   the

sister   concerned   was   required   to   have   license.

Present is a case where Gujarat Electricity Board

who has been allocated 300 MW is not a participating

industry nor appellant no.2 is jointly generating

the energy with Gujarat Electricity Board, even if

it is held that the appellant no.1 to the extent it

holds 42% equity shares of appellant no.2 is jointly

generating the energy.  The Gujarat Electricity Board

which   has   been   allocated   58%   of   electricity

generated   can   not   be   said   as   the   industrial

undertaking jointly generating the energy.

28. The   judgment   of   this   Court   in  Gujarat   Urja

Vikas   Nigam   Ltd.   Versus   ESSAR   Power   Limited,

2016(9)   SCC   103,   has   also   been   referred   to.   The

Page 35 35

above case was a case where parties to the present

appeal were at issue and appeal was filed by Gujarat

Urja Vikas Nigam, successor of Gujarat Electricity

Board   under   Section   125   of   the   Electricity   Act

against   the   Order   of   Appellate   Tribunal   of

electricity. The appellant had filed the petition

before the Gujarat Electricity Regulatory Commission

for adjudication of the dispute arising out of Power

Purchase   agreement.   The   appellant   had   sought

compensation for wrongful allocation of electricity

by   EPL   to   the   sister   concerned   i.e.   ESSAR   Steel

Limited   in   preference   to   the   appellant.   The

Commission had occasion to examine various clauses

of Power Purchase Agreement dated 30.05.1996 between

the parties. This Court rejected the contention of

the EPL that it could sell power to ESL beyond its

allocated   capacity.   In   the   paragraph   22   of   the

judgment following was held: ­

“22.   The   agreement   clearly

contemplates   the   proportion   of

allocation   of   a   capacity.   EPL   has

to fuel and operate the generating

Page 36 36

station to meet the requirement of

electric   output   that   can   be

generated   corresponding   to   the

allocated   capacity.   The   appellant

has   to   pay   annual   fixed   cost   as

determined in terms of Clause 7.1.1

of   Schedule   VII   of   the   agreement.

The   Commission   is   thus,   right   in

observing   that   once   the   entire

capacity has been allocated in two

parts   in   a   particular   proportion,

the contention of EPL that it could

sell   power   to   ESL   beyond   the

allocated   capacity   could   not   be

accepted. EPL was under obligation

as   per   Schedule   VI   to   declare

weekly   schedule   of   the   capacity

available   and   the   dispatch

instructions   were   to   be   issued   on

the basis of the said declaration.

It could not thus be said that EPL

had   no   obligation   to   declare   the

capacity   and   the   obligation   of

GUVNL   to   issue   dispatch

instructions   was   not   dependent   on

declaration   of   the   available

capacity   by   EPL.   Contrary   view   of

the Tribunal is clearly erroneous.

In para 45 and 46 and elsewhere in

its judgment, the Tribunal erred in

holding   that   there   was   no

obligation   to   declare   available

capacity   on   proportionate   basis.

The   finding   of   the   Commission   in

paras   9.5   to   9.12   of   its   order

quoted   above   is   the   correct

interpretation of the agreement. We

hold accordingly.”

Page 37 37

29. In the above case the question of exemption in

excise duty within meaning of Section 3(2) of 1958

Act had not arisen nor the question was considered

whether   EPL   can   be   held   to   be   generating   energy

jointly with appellant no.1 and Gujarat Electricity

Board.   For   the   issues   which   have   arisen   in   the

present case, the above judgment does not render any

help.

30. Learned   Counsel   for   the   appellant   has

submitted that the High Court had rejected the claim

of payment only on the ground that there is no such

Memorandum of Understanding between EPL and ECL as

was found in  A.P. Gas Power Limited (Supra).   The

High Court although has noted the fact that in the

present   case   there   is   no   such   Memorandum   of

Understanding between EPL and ECL but the judgment

of the High Court is not based only on the above

premise   rather   High   Court   has   clearly   found   that

conditions stipulating under Section 3(2)(vii)(a)(i)

of 1958 Act are not satisfied, hence, appellant no.1

Page 38 38

is   not   entitled   for   exemption.   High   Court   has

elaborately considered all the submission raised by

the   appellant   and   rightly   came   to   the   conclusion

that conditions as enumerated in Section 3(2)(vii)

(a) are not fulfilled. We do not find any error in

the aforesaid finding of the High Court. 

Claim under notification dated 27.02.1992

31. The notification dated 27.02.1992 was issued

in exercise of power conferred by Section 3(3) of

Bombay Electricity Act, 1958. The relevant part of

the notification dated 27.02.1992, is as follows: ­

“NOTIFICATION

Sachivalaya Gandhinagar

27

th

 February, 1992

BOMBAY ELECTRICITY DUTY ACT, 1958

No. GHC/92/10/JCP/1188/2594/K

In exercise of the powers conferred

by Sub Section (3) of the Section 3

of   the   Bombay   Electricity   Duty

Act,1958(Bom.   XL   of   1958),   the

Government   of   Gujarat   hereby

remitted   with   effect   on   and   from

the   date   of   publication   of   this

notification   in   the   Official

Page 39 39

Gazette. In the whole of the State

of   Gujarat,   the   Electricity   Duty

payable under item (6) of Part I of

Schedule II to the said Act, on the

energy   consumed   for   motive   power

and   lighting   for   Industrial

purposes   by   industrial   under

takings   which   generate   energy

jointly for their own use either by

establishing   an   independent   joint

company solely for this purpose or

on pro­rata cost sharing basis, for

a period of ten years from the date

of commissioning of the generating

sets subject to the following terms

and conditions namely:­

(a)The generating set or sets shall have

been   purchased   and   installed   or

commissioned   during   the   period

beginning   from   1

st

  January,   1991   and

ending   on   31

st

  December,   1992.

Providing that such generating act or

sets   shall   not   have   been   previously

used in the State.

************”

 

32. The claim raised by the appellant under the

above said notification was specifically dealt by

the   High   Court   and   the   Government.   The   condition

which   was   found   lacking   for   applicability   of   the

notification   was   that   generating   sets   were   not

purchased or installed or commissioned during the

Page 40 40

period from 01.01.1991 to 31.12.1992. The High Court

has recorded categorical finding that the generating

sets have been commissioned in the month of August

1995. It is useful to refer to paragraph 12.0 of the

judgment of Division Bench which is to the following

effect: ­ 

“12.0.Now,   so   far   as   the

alternative claim of the appellants

to grant the exemption for a period

of 10 years under the Notification

dated   27.02.1992   is   concerned,   on

considering   Notification   dated

27.02.1992,   it   appears   that   the

conditions   precedent   laid   down   in

the   said   notification   cannot   be

said to have been compiled by the

appellants   more   particularly

appellant No.1 – ESL. For claiming

the   benefit   of   notification   dated

27.02.1992 it is to be established

that   the   generating   set   or   sets

have   been   purchased/installed   or

commissioned   during   the   period

beginning   from   01.01.1991   and

ending   on   31.12.1992.   From   the

record   it   appears   that   the

generating   sets   have   been

commissioned in the month of August

1995, the appellants have failed to

establish that the generating sets

were   even   purchased   during   the

aforesaid   period.   It   cannot   be

disputed   that   in   a   taxing   statute

more   particularly   with   respect   to

the exemption from payment of duty,

Page 41 41

all   the   conditions   which   can   be

said   to   be   statutory   are   required

to   be   fulfilled   and   unless   and

until all the conditions stipulated

in   the   exemption   notification   are

satisfied   and/or   compiled   with,

there   shall   not   be   any   exemption

under   the   notification.   In   the

present   case,   admittedly,   the

generating   sets   in   question   have

been   commissioned   in   the   month   of

August   1995.   The   appellants   have

failed to establish that they even

purchased   the   generating   sets

during   the   period   beginning   from

01.01.1991   to   31.12.1992.   More

placement   of   order   for   purchase

cannot amount to actual purchase of

the generating sets.”

33. Another   reason   given   by   the   High   Court   was

that   no   application   was   made   within   180   days   of

application of the notification dated 27.02.1992 or

even   from   the   date   of   installation   of   generating

sets i.e. August 1995. Even if the second reason

given by the High Court is ignored, non­fulfillment

of condition no.(a) of notification dated 27.02.1992

clearly   entailed   rejection   of   claim   under

notification   dated   27.02.1992.   There   is   no

foundation or basis laid down even in this appeal to

Page 42 42

assail the finding recorded by the High Court that

generating set was not purchased from 01.01.1991 to

31.12.1992.

34. We thus do not find any error in rejection of

claim   of   appellant   under   the   notification   dated

27.02.1992.

35. The High Court has rightly negatived the claim

of the appellant under Section 3(2) as well as under

the   notification   dated   27.02.1992   issued   under

Section   3(3).   We   do   not   find   any   merit   in   this

appeal, the appeal is accordingly dismissed.

 ......................J.

   (A. K. SIKRI)

......................J.

  (ASHOK BHUSHAN)

NEW DELHI,

MAY 02, 2017