State Bank Of India & Ors Vs. The Consortium Of Mr. Murari Laljalan And Mr. Florian Fritsch & Anr

  Supreme Court Of India Civil Appeal /5023-5024/2024
Link copied!

Case Background

As per the case facts, a Resolution Plan approved by the NCLAT nearly five years ago has seen no significant progress. The case involves issues such as non-payment of airport ...

Bench

Applied Acts & Sections

No Acts & Articles mentioned in this case

Hello! How can I help you? 😊
Disclaimer: We do not store your data.
Document Text Version

2024 INSC 852 REPORTABLE

IN THE SUPREME COURT OF INDIA

CIVIL APPELLATE JURISDICTION

CIVIL APPEAL NOS. 5023-5024 OF 2024

STATE BANK OF INDIA & ORS …APPELLANT(S)

VERSUS

THE CONSORTIUM OF MR. MURARI LAL

JALAN AND MR. FLORIAN FRITSCH & ANR …RESPONDENT(S)

WITH

CIVIL APPEAL NOS. 12220-12221 OF 2024

J U D G M E N T

Civil Appeal Nos. 5023-5024 of 2024 Page 1 of 168

J.B. PARDIWALA, J. :-

For convenience of exposition, this judgment is divided into the following parts: -

INDEX

A. FACTUAL MATRIX ................................................................................... 3

B. SUBMISSIONS ON BEHALF OF THE APPELLANTS ...................... 41

i. Issue No.1: Adjustment of PBG of Rs. 150 Crore towards the first

tranche payment............................................................................................ 43

ii. Issue No. 2: Non-payment of Airport dues ........................................... 53

iii. Issue No. 3: Non-payment of Workmen and Employees’ dues ........... 55

iv. Issue No. 4: Achievement of Effective Date .......................................... 57

v. Issue No. 5: Non-fulfilment of Conditions Precedent .......................... 59

C. SUBMISSIONS ON BEHALF OF THE RESPONDENTS ................... 63

D. ISSUES FOR DETERMINATION .......................................................... 76

E. ANALYSIS ................................................................................................. 77

i. Whether the Performance Bank Guarantee (PBG) could have been

adjusted against the first tranche payment which was to be made under

the Resolution Plan, within 180 days from the Effective Date, in

contravention of the order of this Court dated 18.01.2024, the terms of the

Resolution Plan and the provisions of law? ................................................ 85

a. Whether the Conditions Precedent were fulfilled by Respondent

No.1/SRA and the Effective Date was fixed at 20.05.2022? ................... 85

b. Whether the NCLAT could have directed the Performance Bank

Guarantee (PBG) to be adjusted against the first tranche payment which

was to be made within 180 days of the Effective Date? .......................... 93

Civil Appeal Nos. 5023-5024 of 2024 Page 2 of 168

I. The adjustment of the PBG was impermissible under the terms of

the Resolution Plan read with Regulation 36B(4A) of the 2016

Regulations. ........................................................................................ 94

II. The Lender’s Affidavit dated 16.08.2023 did not impose conditions

which were different from the terms of the Resolution Plan. .......... 106

ii. Whether the non-implementation of the Resolution Plan by the SRA

necessarily leads to the consequence of liquidation as under Section 33(3)

of the IBC, 2016? ......................................................................................... 117

a. Whether Respondent No.1/SRA had failed to implement the Resolution

Plan on non-payment of the Airport Dues as per the terms of the Resolution

Plan? ....................................................................................................... 118

b. Whether Respondent No.1/SRA could be said to have failed to

implement the Resolution Plan on account of the non-payment of workmen

and employees’ dues as per the terms of the Resolution Plan and the order

of the NCLT dated 21.10.2022 which was confirmed by the order dated

31.01.2023 of this Court? ....................................................................... 124

c. Whether there were sufficient grounds before the NCLAT to hold that

Respondent No.1/SRA had contravened the terms of the approved

Resolution Plan and that the Corporate Debtor must be directed to be

liquidated under Section 33(3) of the IBC, 2016? ................................. 131

iii. Whether the timely implementation of the Resolution Plan is also one

of the objectives of the IBC, 2016? ............................................................ 139

F. SHORTCOMINGS AND SUGGESTIONS TO THE IBC, 2016. ....... 150

G. CONCLUSION......................................................................................... 167

Civil Appeal Nos. 5023-5024 of 2024 Page 3 of 168

1. These appeals arise from the judgment and order dated 12.03.2024 passed by the

National Company Law Appellate Tribunal (hereinafter, the “NCLAT”) in

Company Appeal (AT) (INS) 129-130 of 2023 filed by the Appellant herein by

which the NCLAT dismissed the appeal and upheld the order dated 13.01.2023

passed by the National Company Law Tribunal (hereinafter, the “NCLT”). The

order of the NCLT held that Respondent No.1 had fulfilled all the Conditions

Precedent as stipulated in the Resolution Plan. The NCLAT further issued several

directions including a direction that the Performance Bank Guarantee of Rs. 150

Crore (hereinafter, the “PBG”) could be adjusted towards the first tranche

payment of Rs. 350 Crore which was to be made by Respondent No.1.

A. FACTUAL MATRIX

2. The NCLT vide its order dated 20.06.2019 in C.P. 2205 (IB)/ (MB)/ 2019

admitted the application for initiation of Corporate Insolvency Resolution

Process (hereinafter, the “CIRP”) filed by State Bank of India (hereinafter,

“SBI”) in respect of Jet Airways (India) Limited (hereinafter, the “Corporate

Debtor”) in accordance with Section 7 of the Insolvency and Bankruptcy

Code, 2016 (hereinafter, the “IBC, 2016”). The total admitted claim of the

Financial Creditors was Rs. 7800 Crore (approx.). Pursuant to the aforesaid

Order, Mr. Ashish Chhawchharia, was appointed as the Interim Resolution

Civil Appeal Nos. 5023-5024 of 2024 Page 4 of 168

Professional and was appointed as the Resolution Professional (hereinafter,

the “RP”) as well.

3. On 02.06.2020, the RP issued the 4

th

Round of the Request for Resolution Plan

(hereinafter, the “RFRP”) as approved by the Committee of Creditors

(hereinafter, “CoC”) which invited submissions of Resolution Plans for the

Corporate Debtor from potential Resolution Applicants. The relevant clauses

of the RFRP are reproduced hereinbelow:

“3.13 Performance Security

3.13.1 The Successful Resolution Applicant shall furnish or

cause to be furnished, an unconditional and irrevocable

performance bank guarantee or a demand draft, issued by

any scheduled commercial bank in India or a foreign bank

which is regulated by the central bank of a jurisdiction

outside India which is compliant with the Financial Action

Task force Standards and is a signatory to the International

Organisation of Securities Commissions Multilateral

Memorandum of Understanding, provided that it is

acceptable to the Resolution Professional (acting for the

CoC) (“PBG Bank”), of an amount of INR 150 Crores

(Indian Rupees Hundred and Fifty Crores only) or 10% of

upfront amount (payable as per the resolution plan by the

Successful Resolution Applicant), whichever is higher in

favour of “State bank of India, (that is, SBI) (in its capacity

as an agent of the CoC (and acting on behalf of the

Company), within 7 (seven) days of declaration of the

Successful Resolution Applicant, or by way of a direct

deposit by way of the real time gross settlement system into

a bank account held by the SBI Bank, the details of which

shall be shared separately with the Successful Resolution

Applicant (“Performance Security”)

Civil Appeal Nos. 5023-5024 of 2024 Page 5 of 168

3.13.2 If the Performance Security is being provided as a

performance bank guarantee, it shall be in accordance with

Format VIII-A of this RFRP (“PBG”). The PBG shall be

valid, till the later of (i) a period of 180 days from the date

of the PBG; and (ii) the date of completion of the

implementation of the Resolution Plan (as determined by the

RP and the (CoC) and shall be subject to re-issuance or

extension by the Successful Resolution Applicant as may be

required by the CoC (as assisted by the Resolution

Professional) (“PBG Validity”).

xxx xxx xxx

3.13.7 SBI, in its capacity as an agent of the CoC (and acting

on behalf of the Company), shall have the right to invoke the

Performance Security on behalf of the CoC (and upon

receiving approval from the CoC), (by issuance of a written

demand to the Bank to invoke the Performance Security, if

provided as a PBG). The Performance Security can be

invoked and appropriated at any time, upon occurrence of

any of the following conditions, without any reference to the

Resolution Applicant.

i. any of the condition under the Letter of Intent or the

Successful Resolution Plan are breached;

ii. if the Resolution Applicant fails to re-issue or extend

the Performance Security (if provided as a PBG), in

accordance with the terms of this RFRP; or

iii. failure of the Successful Resolution Applicant to

implement the Approved Resolution Plan to the

satisfaction of the CoC, and in accordance with the

terms of the Approved Resolution Plan.

3.13.8 The Performance Security shall be returned to the

Successful Resolution Applicant within a period 7 (seven)

Business Days (based on the request received from the

Successful Resolution Applicant) upon 100% (one hundred

percent) of the completion of the implementation of the

Approved Resolution Plan by the Successful Resolution

Applicant.

Civil Appeal Nos. 5023-5024 of 2024 Page 6 of 168

3.13.9 The Performance Security shall not be set-off against

or used as part of the consideration that the Successful

Resolution Applicant proposes to offer in relation to the

Company, even if expressly indicated as such by the

Successful Resolution Applicant in the Successful Resolution

Plan.”

(emphasis supplied)

4. On 21.09.2020, the Consortium of Murari Lal Jalan and Florian Fritsch

(hereinafter, the “Respondent No.1 / SRA”) submitted its Resolution Plan. It

was amended by the version dated 30.09.2020 and further supplemented and

amended by the addendum dated 02.10.2020. At the 17

th

meeting of the CoC

held on 03.10.2020, the Resolution Plan was placed before the CoC by the RP

and was voted upon by the CoC from 05.10.2020 to 17.10.2020 in accordance

with Regulation 39 of the Insolvency and Bankruptcy Board of India

(Insolvency Resolution Process for Corporate Persons) Regulations, 2016

(hereinafter, the “2016 Regulations”). The CoC, in its commercial wisdom,

approved the Resolution Plan proposed by Respondent No. 1 with a majority

of 99.22% votes. The relevant clauses of the Resolution Plan are reproduced

hereinbelow:

“2. INTRODUCTION OF THE RESOLUTION

APPLICANT

2.1.4. The resolution applicant ("Resolution Applicant") is

defined to mean a Consortium of:

Civil Appeal Nos. 5023-5024 of 2024 Page 7 of 168

a) Mr. Murari Lal Jalan who is the Lead Partner of the

Consortium;

b) Mr. Florian Fritsch is the Other Partner of the

Consortium; and

2.1.5. Mr. Murari Lal Jalan will hold shares in the Corporate

Debtor in his personal capacity.

xxx xxx xxx

6.3.1(c) Summary of Financial Proposal

THE RESOLUTION PLAN SUBMITTED BY THE

RESOLUTION APPLICANT IS UNCONDITIONAL

AND NOT SUBJECT TO SALE OF THE ASSETS OF

THE CORPORATE DEBTOR.

HEADS PACKAGE OF

~RS. 4,783

CRORES

COMPRISING

OF

• ~RS. 1,090.1

CR

COMMITTED

CASH

• ~Rs. 3,668

Crores –

estimated

value of 10%

Equity Stake in

Jet 2.0 at Year

5

• 7.5% Equity

stake in JPPL

AMOUNT

(In Rs.)

PAYMENT TERMS

Civil Appeal Nos. 5023-5024 of 2024 Page 8 of 168

for Assenting

FCs.

• Airport

Savings

• Additional

Upside on

Aircraft +

ATR + Spares

+ BKC

• ~ Rs. 25

Crores for

acquisition of

additional

50.1% stake in

JPPL from

Etihad

Within 180

days from

the

Effective

Date

After 180

from

Effective

Date

CIRP Cost CIRP COST 25 Cr 100% -

ASSENTING

FCS

• Rs. 195 Cr +

up to Rs. 185

Cr +

Guaranteed

NPV of Rs.

391 Cr (using

the discount

rate specified

in the

Evaluation

Matrix)

• Rs. 40 Cr of

Positive Cash

Balance

• 9.5% equity

in Jet 2.0 (5th

Yr Value ~Rs.

3,485 Crore)

• 7.5% equity

in JPPL

• Upside on

Aircrafts +

380 Cr 185 Cr

(Incl. 10 Cr

for

BKC)

9.5%

Equity in

Jet 2.0

7.5%

equity in

JPPL

Additional

Upside on

Aircrafts

Sales +

ATR Sales

+ Spares

Savings on

CIRP

Costs

195 Cr

in Yr. 2

Guaranteed

NPV of 391

Cr (using

the

discount

rate

specified in

the

Evaluation

Matrix) in

Yr. 3, 4, 5

Upside on

BKC

Savings on

Airport

Civil Appeal Nos. 5023-5024 of 2024 Page 9 of 168

ATR

Inventory +

Spares + BKC

Property (if

given)

• Savings on

CIRP Costs

• Savings on

airport and

parking

charges

• Savings on

Contingency

Fund

• All payments

are secured

against

tangible

security

• Dissenting

FCs will be

paid in priority

as per IBC

Positive

Cash

Balance

Workmen &

Employees

• Rs. 52 Crores

52 Cr 100% -

OCs • Rs. 15,000 to

each of the

Operational

Creditors,

irrespective of

their claim

10 Cr 100% -

OC (Dutch

Admin)

10,000 100% -

Other

Creditors

(other than

FCs and

OCs)

10,000 100% -

Civil Appeal Nos. 5023-5024 of 2024 Page 10 of 168

Shareholders

(promoters,

Etihad and

PNB)

10,000 100% -

Contingency

Fund

8 Cr

100%

Established

JPPL Offer from RA

to acquire

50.01%

shareholding in

JPPL

from Etihad.

The said sum of

Rs. 25 Crores

will be infused

by the RA in

addition to the

abovementioned

amounts.

25 Cr - 100%

TOTAL

475 Cr

+

25 Cr

*THIS IS A SUMMARY OF THE FINANCIAL

PROPOSAL. PLEASE REFER TO THE DETAILED

PROVISION UNDER THE RESPECTIVE HEAD.

xxx xxx xxx

(d) PROPOSAL FOR RESOLUTION OF

OUTSTANDING AIRPORT AND PARKING DUES (RS.

240 CRORES AS OF AUGUST 31, 2020)

[…]

BKC Property not part of resolution - If CoC decides to

retain the BKC Property as a non-core asset and not offer it

as part of this resolution process as proposed above, then the

Resolution Applicant will not pay the upfront sum of Rs. 10

Crores to the Assenting Financial Creditors as envisaged in

the above Clause for BKC Property. Further, then the

Civil Appeal Nos. 5023-5024 of 2024 Page 11 of 168

airport dues and parking charges after the ICD (approx. Rs.

240 Crores as of August 31, 2020) will be paid by the

Resolution Applicant upfront in priority over any other

payments to the creditors of the Corporate Debtor, subject

to a maximum of Rs. 475 Crores. As per the general aviation

practice in respect to parking and airport space, as and when

the Corporate Debtor will intend to use/ move the aircrafts

or use the airport space, such claimants will seek their past

dues. Therefore, their payments need to be resolved upfront

by pro rata reduction of amounts payable to other creditors,

to enable the Corporate Debtor to re-commence its

operation, which is why the Resolution Applicant has

suggested that their payments be made upfront against the

BKC Property. SUCH PAYMENTS WILL BE SETTLED

UPFRONT IN FULL IN FIRST 180 DAYS FROM THE

EFFECTIVE DATE AND WITHOUT ANY

CONDITIONS (INCLUDING NOT BEING

STAGGERED PAYMENTS SPREAD ACROSS A

PERIOD OF TIME) SO THAT FLYING CAN START

IMMEDIATELY WITHOUT ANY FUTURE DISPUTES

AND CONCERNS WITH SUCH CLAIMANTS FOR

PAST DUES. Alternatively, the Resolution Professional can

provide the Resolution Applicant with a no-dues certificate

from such contingent creditors, in which case, these

creditors will be treated in compliance with the provisions of

the IBC.

The Resolution Applicant states and confirms that this

"Proposal for Resolution of outstanding airport and parking

dues (approx. Rs. 240 Crores as of August 31, 2020)" which

deals with the appropriation of the BKC Property is merely

a proposal and not a condition to the implementation of this

Resolution Plan and the CoC has the discretion to accept/

reject such proposal. If the above-mentioned proposal is

acceptable to the CoC, then it is acceptable to the Resolution

Applicant in the manner stated hereinabove.

(g) Infusion of funds and timelines

Civil Appeal Nos. 5023-5024 of 2024 Page 12 of 168

Infusion

Timelines (In

Days)

Amount (In Rs.) Purpose/Utilization

As Equity As ECB

Upfront

(within 180

days)

350,00,00,000 - CIRP Cost;

Contingency Fund;

Payment to FCs,

OCs, Other

Creditors, and

other stakeholders;

working capital for

business; Misc.

Admin Expenses

181-365 days 250,00,00,000 - Working capital for

business; Portion

of funds can be

used for acquiring

Etihad's stake in

JPPL; making

payments to

creditors if RA is

inclined in

advancing any

payment timelines

Year 2 - 175, 00,00,000 Remaining

payment to FCs.;

Misc. expenses for

general corporate

and day-to-day

operations, in

compliance with

the extant ECB

Regulations.

After Year 2 - 600,00,00,000 Working capital for

business

Sub-Total 600,00,00,000 775,00,00,000

TOTAL

1,375,00,00,000

xxx xxx xxx

Civil Appeal Nos. 5023-5024 of 2024 Page 13 of 168

6.4. Treatment of Stakeholders

6.4.1. Treatment of outstanding CIRP Costs

(a) In terms of Section 30(2)(a) of the IBC, the CIRP Costs

are to be paid in priority to any other creditor of the

Corporate Debtor.

(b) As per the information disclosed by the Resolution

Professional on August 14, 2020, the CIRP Costs includes:

i. Operating and Process Costs (Rs. 27.16 Crores, as

of August 31, 2020) which includes fees, charges,

salaries of Asset Protection Team (APT) of the

Corporate Debtor and other costs incurred by the

Resolution Professional in running the operations of

the Corporate Debtor as a going concern;

ii. Interim Finance Cost (Rs. 54.4 Crores, as of August

31, 2020).

[…]

(d) The Resolution Professional has also disclosed to the

Resolution Applicant that the Corporate Debtor has a

positive bank balance of approx. Rs. 92 Crores and estimates

to collect a further sum of Rs. 40 Crores in the next 2-3

months.

[…]

(f) The Resolution Professional has estimated an approx.

sum of Rs. 240 Crores (as of August 31, 2020) towards

parking charges for aircrafts and airport space lease

charges. Such amounts are good faith estimates of the

Resolution Professional based on previous invoices as it has

not received any invoice/ demand from any of the lessors/

owners for such amounts. The Resolution Applicant shall

endeavour to negotiate the parking fee and rental fee for the

Corporate Debtor with the various airports and will

endeavour that the cost for such heads is kept to the

minimum.

[…]

Civil Appeal Nos. 5023-5024 of 2024 Page 14 of 168

(h) Based on the information provided, the Resolution

Applicant have assumed that the amounts standing to the

credit of the bank account of the Corporate Debtor

(including amounts estimated to be received subsequently)

are sufficient to cover for the CIRP Costs of the Corporate

Debtor (excluding parking charges, rental charges,

employee dues, taxes etc). Accordingly, the Resolution

Applicant has set aside a sum of Rs. 25 Crores as CIRP Costs

towards payment of any such costs until the Approval Date.

Any expenses incurred by the Corporate Debtor from the

Approval Date until the Effective Date will be incurred out

of the positive bank balance of the Corporate Debtor.

(i) As stated in Clause 6.3.1(d) above, if the CoC agrees to

offer a clear and marketable title in the BKC Property (one

floor) to the Resolution Applicant, then the Resolution

Applicant shall settle the airport and parking charges

(estimated at approx. Rs. 240 Crores, as of August 31, 2020).

Savings from such charges will be distributed to the

Assenting Financial Creditors. If the airport and parking

charges over are over Rs. 245 Crores, then amounts over and

above Rs. 245 Crores will be first paid out of Rs. 25 Crores

reserved as CIRP Costs (if there are no outstanding CIRP

Costs) and then out of the positive cash flows of the

Corporate Debtor. Any amounts over and above such

amounts will be shared between the Resolution Applicant

and the Assenting Financial Creditors in equal proportion.

(j) The Resolution Applicant states that if the CIRP Cost is

less than the estimated amounts and the airport dues are less

than Rs. 245 Crores, then the differential amounts will be

paid by the Resolution Applicant to the Assenting Financial

Creditors, which amounts are over and above the amounts

reserved for them this Resolution Plan. However, if the CIRP

Cost exceeds the current estimates, then the CIRP Costs will

be paid by the Resolution Applicant as per actuals in

compliance with the provisions of the IBC and commercial

proposal for other creditors of the Corporate Debtor will be

adjusted accordingly, subject however to a maximum of Rs.

475 Crores. It is clarified that on account of such payments

from the amounts infused by the Resolution Applicant in the

Civil Appeal Nos. 5023-5024 of 2024 Page 15 of 168

Corporate Debtor, the pay-outs towards other claimants as

currently stated will be reduced proportionately to account

for such additional CIRP Costs, subject to a minimum

payment of liquidation value to the Operational Creditors

and Dissenting Financial Creditors of the Corporate Debtor

and subject to a maximum of Rs. 475 Crores.

(k) The outstanding CIRP Costs shall be paid by the

Resolution Applicant out of funds infused by the Resolution

Applicant in the Corporate Debtor and as per the

Implementation Schedule set out in Clause 7.7 below.

[…]

(m) Priority of Payment CIRP Cost shall be fully paid and

discharged after the Effective Date before payment is made

to any of the Creditors as per the Resolution Plan. The

Resolution Applicant will be entitled and will use funds

available with the Corporate Debtor on the Effective Date

for making any portion of CIRP payments.

(n) The Resolution Applicant has sufficient funds and do not

envisage any challenge in terms of source for making such

payments. The net worth and financial capabilities of the

Resolution Applicant are evident from its financial

statements submitted at the time of submitting its EOI.

Regarding the Source of Funds, the CIRP Costs shall be met

out of funds infused by the Resolution Applicant in the

Corporate Debtor.

xxx xxx xxx

6.4.2. Treatment of Employees/Workmen dues, including

dues of Authorized Representatives of Employees/

Workmen

(a) The Resolution Applicant proposes to pay a fixed sum of

Rs. 52 Crores to the Workmen/ Employees towards

settlement of all the claims made by the Employees and

Workmen of the Corporate Debtor, including to the

Authorized Representatives of Employees and Workmen as

Civil Appeal Nos. 5023-5024 of 2024 Page 16 of 168

set out in the List of Creditors ("Admitted Workmen and

Employees Dues").

(b) The payments towards Admitted Workmen and

Employees Dues shall be made out of funds infused by the

Resolution Applicant in the Corporate Debtor and as per the

Implementation Schedule set out in Clause 7.7 below. The

said payment is also being made in priority to the payment

to the financial creditors.

(c) In any case, if the Liquidation Value due to Operational

Creditors (Employees/ Workmen dues, including dues of the

Authorized Representatives of Employees/ Workmen) is not

"NIL", then the Resolution Applicant undertakes that the

Liquidation Value due to such Operational Creditors

(Employees/ Workmen dues including dues of Authorized

Representatives of Employees/ Workmen) shall be paid and

shall be given priority in payment over Financial Creditors

as is already reflected in the Implementation Schedule in

Clause 7.7 below. The entire payment to the Employees/

Workmen dues including dues of Authorized Representatives

of Employees/ Workmen is being made in priority within 175

(one hundred seventy five) days from the Effective Date.

[…]

(g) Other than Admitted Workmen and Employees Dues

which the Resolution Applicant proposed to pay, all other

potential obligations and workmen dues including any dues

towards Provident Fund (Contribution of Employees /

Company), Gratuity, Employees State Insurance Scheme,

Professional Tax or any other taxes in nature of employment

owed or payable to, (including any demand for any penalty,

penal interest already accrued/ accruing or in connection

with any claims) and all rights and entitlements of present or

past, direct or indirect, permanent or temporary, employees

and/or workmen of the Corporate Debtor, whether admitted

or not, due or contingent, asserted or unasserted, crystalized

or uncrystallized, known or unknown, secured or unsecured,

disputed or undisputed, present or future, whether or not set

Civil Appeal Nos. 5023-5024 of 2024 Page 17 of 168

out in the balance sheet of the Corporate Debtor or the profit

and loss account statements of the Corporate Debtor or the

List of Creditors, claim submitted or not submitted, claim

admitted or not admitted, in relation to any period prior to

the ICD will be written off in full and shall be deemed to be

permanently extinguished and waived off subject to Clause

9.9 of this Resolution Plan by virtue of the order of

Adjudicating Authority approving the Resolution Plan and

neither the Corporate Debtor nor the Resolution Applicant

shall, at no point of time be, directly or indirectly, held

responsible or liable in relation thereto.

[…]

(i)(xi) For the avoidance of doubt it is hereby clarified that

notwithstanding the acceptance or rejection of the terms of

the proposed demerger by the employees and/or workmen,

the Resolution Applicant shall ensure the payment of (i)

minimum value due and payable to such employees and

workmen (under Section 30(2) of the IBC); and (ii) the CIRP

costs admitted by the Resolution Professional, subject to a

maximum of Rs. 475 Crores.

xxx xxx xxx

6.4.4. Treatment of Financial Creditors

[…]

Summary of payments and security package

Head Amount

Payable

Security

Offered

Value

of

Security

Date of

Creation

of

Security

Date of

Release of

Security

Cash

Payment

Up to Rs.

185

Crores

PBG of Rs.

47.5 Crores

Rs.

393.5 Cr

(with

BKC)

Or

Effective

Date

PBG

adjusted

BKC

Property (if

given)

To be

released on

sale of

BKC

Civil Appeal Nos. 5023-5024 of 2024 Page 18 of 168

Mortgage

over Dubai

Property No.

1 valued at

more than Rs.

100 Crores

Rs.

147.5 Cr

(without

BKC)

Year 5 or

on

complete

payment,

whichever

is earlier

Cash

Payment

Rs. 195

Crores

BKC

Property (if

given)

Rs. 445

Cr

(with

BKC)

Or

Rs. 200

Cr

(without

BKC)

Effective

Date

To be

released on

sale of

BKC

Mortgage

over Dubai

Property No.

1 valued at

more than Rs.

100 Crores

Effective

Date

Year 5 or

on

complete

payment,

whichever

is earlier

Mortgage

over Dubai

Property No.

2 valued at

more than Rs.

100 Crores

Effective

Date

Cash

Payment

NPV of

Rs. 391

Crores

(using the

discount

rate

specified

in the

Evaluation

Matrix)

Mortgage

over Dubai

Property No.

1 valued at

more than Rs.

100 Crores

Rs. 600

Crores

Effective

Date

Year 5 or

on

complete

payment,

whichever

is earlier

Mortgage

over Dubai

Property No.

2 valued at

more than Rs.

100 Crores

Effective

Date

Mortgage

over Dubai

Property No.

3 valued at

more than Rs.

50 Crores.

Effective

Date

Civil Appeal Nos. 5023-5024 of 2024 Page 19 of 168

Floating

charge by

way of

hypothecation

on India POS

Credit Card

Receivables

of Year 3,

Year 4, Year

5 of the

Corporate

Debtor of Rs.

350 Crores or

the total

outstanding

dues of the

Assenting

FCs,

whichever is

lower.

Effective

Date

Upside

on

Aircrafts

Rs. 60

Crores +

upside as

per terms

of Series

B ZCB

Three 737s;

Five 777s &

Three A330

BV of

Rs.

1,900

Effective

Date

On sale of

relevant

aircraft(s)

as it

could be

sold in

Lots and in

phases

or on

relevant

redemption

date,

whichever

is earlier.

Upside

on ATR

Inventory

Rs. 15

Crores +

upside as

per terms

of Series

C ZCB

Entire ATR

Inventory

BV of

Rs. 134

Cr

Effective

Date

On sale of

ATR

Inventory

on

relevant

redemption

Civil Appeal Nos. 5023-5024 of 2024 Page 20 of 168

date,

whichever

is

earlier.

Upside

on

Spares

Rs. 50

Crores +

upside as

per terms

of Series

D ZCB

Aircraft

Spares

BV of

Rs. 600

Cr

Effective

Date

On sale of

Spares

on relevant

redemption

date,

whichever

is earlier.

(a) COMMITTED CASH PAYMENTS

(i) The Resolution Applicant will pay the Assenting Financial

Creditors a total sum of Rs. 185 Crores on 180th day from

the Effective Date. If the BKC Property is not provided to the

Resolution Applicant as per the proposal stated in Clause

6.3.1(d), then the Resolution Applicant will pay the Assenting

Financial Creditors, a total sum of Rs. 175

Crores on 180th day from the Effective Date. The said

amounts shall be paid on the following principal terms:

Amount Payable Up to Rs. 185 Crores/ up to Rs. 175

Crores

Payable By Jet Airways (India) Limited

Payable To Financial Creditors against

conversion of admitted claims of

equivalent amount.

Date of Payment 180th day from the Effective Date.

Security • Performance bank guarantee of

Rs. 47.5 Crores

• Mortgage over BKC Property

(if given to the RA).

Civil Appeal Nos. 5023-5024 of 2024 Page 21 of 168

• Mortgage over Dubai Property

No. 1 valued at more than Rs.

100 Crores.

Date of creation of

security

Effective Date

Date of release of

Security

• BKC Property - On sale of BKC

Property (if given to the RA) or

on the date of payment,

whichever is earlier.

• Charge over Dubai Property

No. 1 with respect to this

payment will be released on the

date of payment.

Security Related

Terms

RBI approval required for creating

charge over Dubai Property No. 1

will be applied after the CoC

approves this Resolution Plan. If

the RBI approval for creating such

charge is not received by the

Effective Date, then alternate

security will be provided in India

of equivalent value on the

Effective Date.

Event of Default Corporate Debtor’s failure to make

such committed payment

Consequences of Event

of Default

Enforcement of security for

recover the outstanding amounts.

Governing Law and

Jurisdiction

Indian Law and courts of Mumbai

will have exclusive jurisdiction.

xxx xxx xxx

6.4.12. Request for the consideration of the CoC - As

required under the RFRP, the Resolution Applicant shall

provide the performance security bank guarantee (“PBG”)

for a total sum of Rs. 150 Crores. The PBG will be provided

in two parts, with the first PBG of Rs. 47.5 Crores provided

Civil Appeal Nos. 5023-5024 of 2024 Page 22 of 168

within 7 (seven) days from the date of receipt of LOI; and

PBG for the remaining sum of Rs. 102.5 Crores provided on

the Effective Date.

7.3. Compliance with respect of Regulation 36B (4A)

The Resolution Applicant undertakes to provide the

performance security bank guarantee as per the terms of the

RFRP in favour of "State Bank of India" (in its capacity as

an agent of the CoC (and acting on behalf of the Corporate

Debtor)), within 7 (seven) days of it being declared the

"Successful Resolution Applicant", or by way of a direct

deposit by way of the real time gross settlement system into

a bank account held by the SBI Bank, as per the terms of the

RFRP.

xxx xxx xxx

7.1. Term of the Resolution Plan

7.1.2. The effectiveness and implementation of the Resolution

Plan by the Resolution Applicant shall be subject to the

approval of the NCLT. Notwithstanding anything set out in

this Resolution Plan, the implementation of this Resolution

Plan by the Resolution Applicant shall not be conditional

upon satisfaction of any conditions, other than approval of

the NCLT.

7.6. Conditions to the Implementation of the Resolution

Plan

7.6.1. Conditions Precedent - The obligation of the

Resolution Applicant to re-commence operations as an

aviation company, being the business proposed to be

acquired is subject to the fulfilment of the following

conditions after the Approval Date ("Conditions

Precedent"):

(a) Validation of AOP of the Corporate Debtor by DGCA &

MoCA - The AOP of the Corporate Debtor shall have been

Civil Appeal Nos. 5023-5024 of 2024 Page 23 of 168

validated by the DGCA, the MoCA and any other relevant

Government Authority and grant of all other mandatory

approvals to the Corporate Debtor to enable it to re-

commence flying operations (including commercial/ cargo

operations) and related on-ground services.

(b) Submission and approval of the Business Plan to DGCA &

MoCA - The Business Plan of the Resolution Applicant shall

have been submitted after the Approval Date to the DGCA

and MoCA for their review, and approval. The Resolution

Applicant agrees to modify its business plan to incorporate

all reasonable changes required by the DGCA/ MoCA,

which otherwise does not make the business unviable for the

Resolution Applicant.

(c) Slots Allotment Approval - The DGCA and MoCA shall have

approved the reinstatement of all the suspended slots

(including the bilateral rights and traffic rights) back to Jet

Airways/ Corporate Debtor. The slots (along with related

bilateral rights and traffic rights) can be allotted to the

Corporate Debtor gradually as per its Business Plan with

immediate slots allotment approval (along with related

bilateral rights and traffic rights) for sectors on which Jet

2.0 proposes to recommence operations after the Effective

Date.

(d) International Traffic Rights Clearance - The Corporate

Debtor shall have received the International Traffic Rights

Clearance in compliance with Applicable Laws.

(e) Demerger - The Scheme filed as part of this Resolution Plan

shall have been approved under Applicable Laws and the

Demerged Employees shall have demerged from the

Corporate Debtor to AGSL along with all their past dues,

liabilities and outstanding's with effect from the Approval

Date, without the requirement of any further consent or

approval of any other stakeholder of AGSL (since we

understand that AGSL currently does not have any creditor)

or any stakeholder of the Corporate Debtor (including

existing or past employee or workmen or employees' unions

of the Corporate Debtor).

7.6.2. Fulfilment of Conditions Precedent - The date of

fulfilment of all the Conditions Precedent as stated in Clause

Civil Appeal Nos. 5023-5024 of 2024 Page 24 of 168

7.6.1 above shall be the effective date for the purposes of this

Resolution Plan ("Effective Date").

7.6.4. Automatic Withdrawal - The Resolution Applicant is

confident of completing all the Conditions Precedent (as set

out in Clause 7.6.1 above) within 90 (ninety) days from the

Approval Date. In the unlikely event that all the Conditions

Precedent cannot be fulfilled within 90 (ninety) days, the

Resolution Applicant takes the responsibility of completing

the outstanding Conditions Precedent at the earliest and

seeks to extend the Conditions Precedent fulfilment period

by another term of maximum 180 (one hundred and eighty)

days. If all the Conditions Precedent are not fulfilled within

such period (i.e. 270 (two hundred and seventy) days from

the Approval Date), then this Resolution Plan shall

automatically stand withdrawn without any further acts,

deeds, or things. On such withdrawal, the members of the

Resolution Applicant in the Monitoring Committee shall

resign, and the remaining members of the Monitoring

Committee shall assume absolute control of the Corporate

Debtor.

7.7. Implementation Schedule -

7.7.1. The Resolution Applicant shall take the following steps

in the order of sequence (except otherwise mentioned in any

step for any part of the step) as an integral part of the

Resolution Plan. It is provided that the procedure, timelines

and the sequence of steps listed below are only indicative and

that they may be re-arranged/ changed as may be required

or directed based on discussions with the necessary

Governmental Authorities/ stock exchange (on account of

past non-compliances of the Corporate Debtor or otherwise)

or for the purposes of advancing any payments to the

stakeholders, and at all times in compliance with Applicable

Laws:

Step Activity Days

1. Receipt of approval from the Competition

Commission of India under the provisions of

Before

approval of

Civil Appeal Nos. 5023-5024 of 2024 Page 25 of 168

the Competition Act, 2002 read with the

provisions of the IBC.

Resolution

Plan by CoC

2. Declaration of the Successful Resolution

Applicant and Receipt of LoI from the CoC

X

3. Unconditional acceptance of the LoI X + 3

4. Issuance of Performance Security Bank

Guarantee

X + 7

5. Finalization of the members of the

Monitoring Committee

Between X

and

Approval

Date

6. Approval Date Y

7. Monitoring Committee to take control as per

Clause 7.8.2.

Y

8. Fulfilment of Conditions Precedent as per

Clause 7.6.1

After Y

9. Filings of the certified copy of the Order of

Approval

received from Adjudicating Authority

sanctioning the Resolution Plan with the

relevant Government Authorities/ Stock

Exchange/ Departments.

Y + 10

10. Effective Date Z

11. Infusion of Rs. 350 Crores in the

Corporate Debtor

Z + 150

12. Setting up the Contingency Fund Z + 170

13. Cancellation of Shares (excluding Public

Shares) as per Clause 7.4.1(c).

Z + 170

14. Reconstitution of Share Capital as per Clause

7.4.2 above.

Z + 170

15. Steps towards issuance of equity shares as

per Clause 7.4.3

above.

Z + 170

16. Payment of CIRP Costs as per Clause 6.4.1. Z + 170

17. Payment to the Operational Creditors

(Workmen and

Employees, including Authorized

Representatives of

Workmen and Employees) as per Clause

6.4.2.

Z + 175

Civil Appeal Nos. 5023-5024 of 2024 Page 26 of 168

18. Payment to all the Operational Creditor

(other than Workmen and Employees) as per

Clause 6.4.3 above.

Z + 175

19. Payment to Other Creditors and Stakeholders

as per Clause 6.4.5, Clause 6.4.6, 6.4.7, and

6.4.8

Z + 175

20. Payment to Dissenting Financing Creditors

as per Clause 6.4.4(m)(i).

Z + 176

21. 1st Tranche payment to Financial Creditors

as per Clause

6.4.4.

Z + 180

22. Monitoring Committee to be released and

Reconstituted Board of Directors to take over

the management of the Corporate Debtor.

Z + 180

23. Closing Date. Z + 180

24. Redemption of Series B, Series C; and Series

D ZCBs

Z + 365

25. Necessary statutory approvals Y + 365

(in

accordance

with Sec

31(4) of the

IBC)

26. Redemption of Series A ZCB Z + 730

27. Release of charge (if any) over assets of the

Corporate Debtor (which have not been

previously released).

Z + 730

28. Redemption of NCDs and release of any

charge (if any)

Z + 5 Years

xxx xxx xxx

9.4. Implementation - The performance guarantee provided

by the Resolution Applicant can be invoked in accordance

with the terms of the RFRP.”

5. The RP preferred an application under Section 30(6) read with Section 31 of

the IBC, 2016 before the NCLT seeking approval of the Resolution Plan

Civil Appeal Nos. 5023-5024 of 2024 Page 27 of 168

submitted by Respondent No.1 and vide order dated 22.06.2021, the NCLT

approved the Resolution Plan. In view of the uncertainty regarding the

achievement of the “Effective Date” under Clauses 7.6.2 and 7.6.4 of the

Resolution Plan, it was clarified that the same would be fixed on the 90

th

day

from the Plan Approval Order dated 22.06.2021. Respondent No.1 was also

given liberty to approach the NCLT for appropriate orders with respect to an

extension of the timeline, subject to a maximum of another 180 days, in case

they fail to fulfill all the Conditions Precedent within 90 days. The relevant

observations are reproduced hereinbelow:

“33. During the hearing, the uncertainty of the time frame

for implementation of the Resolution Plan was discussed. It

is stated by the SRA in clause no. 7.6.2 (pdf 276) of the

Resolution Plan that the effective date would mean the date

of the fulfilment of all the conditions precedent as stated in

clause 7.6.1 thereof. The SRA, at clause no. 7.6.4, has gone

on to add that the consortium would make all endeavor to

ensure all the compliances are done for the fulfillment of the

conditions precedent within a period of 90 days. In the

unlikely event that the conditions precedent are not complied

within this period, SRA would require a maximum of 180

days more to fulfil the conditions. Failing which the

Resolution Plan would stand automatically withdrawn

without any further act, deed or thing. In view of such

uncertainty in the ‘effective date’ the Bench suggested that

let the effective date be the 90th day from the Approval Date

(clause 3.1 at pdf page 201). The SRA as well as the

Applicant (RP of the Corporate Debtor) had agreed to the

suggestion. This in our opinion is not in the nature of a

substitution or addition to the decision, commercial or

otherwise, of the CoC. The suggestion is made only to give

finality and certainty to the effective date, which the SRA has

otherwise committed in the Resolution Plan to endeavor to

do. It could accordingly be ordered so. Failing which the

Civil Appeal Nos. 5023-5024 of 2024 Page 28 of 168

SRA / Corporate Debtor would be at liberty to approach this

Authority for appropriate orders with regard to extension of

the timeline, as would be deemed proper. That would help

prevent the SRA from the frustration of ‘automatic

withdrawal’ referred to in clause 7.6.4 of the Resolution

Plan.”

(emphasis supplied)

6. Since the initial period of 90 days for fulfilment of the Conditions Precedent

expired on 22.09.2021, an extension of another 90 days was granted by the

NCLT vide order dated 29.09.2021 (1

st

extension). The 1

st

extension of 90

days expired on 22.12.2021. The NCLT vide order dated 20.01.2022, again,

granted an extension of another 90 days (2

nd

extension). The 2

nd

extension of

90 days expired on 22.03.2022. The maximum extension that could have been

provided under Clause 7.6.4 of the Resolution Plan i.e., an additional 180

days, had now come to an end. However, vide order dated 11.04.2022, the

NCLT granted exclusion of a period of 65 days from 17.01.2022 to

22.03.2022, which was spent in moving the application for grant of time. This

finally extended the time for achieving the Effective Date from 22.03.2022 to

25.05.2022 (3

rd

extension).

7. On 20.05.2022, Respondent No.1 obtained the Air Operation Certificate

(hereinafter, the “AOC”) and asserted that all the Conditions Precedent

required under Clause 7.6.1 of the Resolution Plan had been met and that the

Effective Date in accordance with Clause 7.6.2 had been achieved. As a

Civil Appeal Nos. 5023-5024 of 2024 Page 29 of 168

consequence, Respondent No.1 had 180 days from 20.05.2022 i.e., until

16.11.2022 to infuse an amount of Rs. 350 Crore in the Corporate Debtor as

per Clause 6.3.1(g) and the Implementation Schedule under Clause 7.7.1 of

the Resolution Plan.

8. The workmen and employees of the Corporate Debtor and several Operational

Creditors challenged the order of the NCLT dated 22.06.2021 by which the

Resolution Plan was approved before the NCLAT. Vide order dated

21.10.2022, the NCLAT upheld the order of the NCLT dated 22.06.2021.

However, it was observed that the workmen and employees are entitled to the

payment of their full provident fund and gratuity which was unpaid as on the

insolvency commencement date and that the balance of the above dues should

be paid by the Successful Resolution Applicant i.e., Respondent No.1, in order

to satisfy its statutory obligations. It was further stated that “Non-payment of

full PF and Gratuity shall lead to violation of Section 30(2)(e) and hence, to

save the plan, the above payments have to be made”. On 20.12.2022,

Respondent No.1 preferred Civil Appeal Nos. 465-469 of 2023 against the

aforesaid order dated 21.10.2022 passed by the NCLAT, before this Court.

9. It is the case of Respondent No.1 that between May 2022 and October 2022,

the Appellants disputed the fulfilment of the Conditions Precedent by

Respondent No.1 on one ground or another. Therefore, on 18.10.2022,

Civil Appeal Nos. 5023-5024 of 2024 Page 30 of 168

Respondent No.1 filed two Interim Applications – First, IA No. 3398 of 2022

(hereinafter, “Implementation Application”) before the NCLT seeking

necessary directions for the implementation of the Resolution Plan and a

declaration that all the Conditions Precedent have been fulfilled; Second, IA

No. 3508 of 2022 requesting that the period from 20.05.2022 till the date on

which the Implementation Application would be decided by the NCLT be

excluded for the purpose of calculating 180 days from the Effective Date, for

the purpose of making the first tranche payment of Rs. 350 Crore.

10. The NCLT allowed both the aforesaid IAs and vide its common order dated

13.01.2023 held that all the Conditions Precedent have been duly complied

with and therefore, 20.05.2022 would be the Effective Date. Further, it

excluded the period from 20.05.2022 to 16.11.2022 (180 days) from the period

of 180 days within which the first tranche payment had to be made, in the

interests of justice and to achieve the primary objective of maximization of

assets and resolution of the Corporate Debtor. As a consequence, the deadline

to meet with the first tranche payment obligation of Rs. 350 Crore was

extended till 15.05.2023 (hereinafter, “1

st

implementation extension”). The

appellants challenged this common order dated 13.01.2023 passed by the

NCLT before the NCLAT by way of Company Appeal (AT)(INS) Nos. 129-

Civil Appeal Nos. 5023-5024 of 2024 Page 31 of 168

130 of 2023 (hereinafter, “Company Appeal”) and also sought a stay on the

same.

11. On 30.01.2023, this Court dismissed Civil Appeal Nos. 465-469 of 2023 filed

by Respondent No.1 and upheld the order dated 21.10.2022 passed by the

NCLAT. In such circumstances, Respondent No.1 was obliged to pay the full

provident fund and gratuity that the workmen and employees were entitled to

within 180 days from the Effective Date.

12. The NCLAT vide its order dated 03.03.2023, declined to stay the order dated

13.01.2023 passed by the NCLT while observing that the steps regarding the

implementation of the Resolution Plan have to be taken by the SRA which

needs to be overseen by the Monitoring Committee. On 17.04.2023, the

Appellants filed Civil Appeal Nos. 3736-3737 of 2023 before this Court

against the order of the NCLAT declining the grant of stay.

13. Since 15.05.2023 was fixed as the deadline to make the first tranche payment

of Rs. 350 crore, Respondent No.1, on 11.05.2023, filed IA Nos. 2028-2029

of 2023 respectively before the NCLAT in the Company Appeal for the

purpose of seeking exclusion of the period from 16.11.2022 till the time the

Company Appeal is decided from the calculation of 180 days stipulated for

the infusion of first tranche of funds under the Resolution Plan. Immediately

Civil Appeal Nos. 5023-5024 of 2024 Page 32 of 168

thereafter, on 17.05.2023, IA Nos. 2059-2060 of 2023 in the Company Appeal

were also filed by Respondent No.1 seeking to restrain the Appellants from

encashing or appropriating the Performance Bank Guarantee and Earnest

Money deposited by Respondent No.1 in favor of the Appellants under the

Resolution Plan.

14. The NCLAT vide its common order dated 26.05.2023, stated that the period

between 16.11.2022 and 03.03.2023 (107 days) be excluded from the

calculation of 180 days for the infusion of first tranche of funds under the

Resolution Plan and also held that the Appellants could invoke the PBG only

with the leave of the NCLT. This, effectively, extended the period to infuse

Rs. 350 Crore under the first tranche till 31.08.2023 (2

nd

implementation

extension). Soon thereafter, on 13.06.2023, the Appellants filed Civil Appeal

Nos. 4131-4134 of 2023 against the common order dated 26.05.2023 passed

by the NCLAT.

15. On 16.06.2023, Respondent No. 1 filed two other IA Nos. 3789-3790 of 2023

(hereinafter, “Gratuity Application”) in the Company Appeal requesting that

they be allowed to discharge the gratuity claims of the employees and

workmen of the Corporate Debtor in three tranches and also allow them to

approach the EPFO authorities in order to reduce or waive off the claim

towards damages amounting to Rs. 24.4 Cr imposed on the Corporate Debtor

Civil Appeal Nos. 5023-5024 of 2024 Page 33 of 168

or grant permission to challenge the imposition of damages in an appeal before

the appropriate authority.

16. In the meantime, vide letter dated 27.07.2023, the Office of the Director

General of Civil Aviation, Government of India (hereinafter, “DGCA”)

extended the validity of the AOC issued to the Corporate Debtor until

03.09.2023 subject to certain conditions. The relevant extracts from the letter

are reproduced hereinbelow:

“Sir,

Reference is invited to Jet Airways Letter dated 16.05.2023

followed by email dated 12.06.2023 and discussions with Sh

Ankit Jalan, representative of Jalan-Kalrock Consortium

(SRA) on 14.07.2023 and 27.07.2023 regarding extension of

validity of AOC.

2. In view of the fact that Jet Airways is still undergoing

CIRP under IBC, 2016, NCLT and NCLAT having the

jurisdiction in respect of the insolvency of the Company have

granted extension(s)/exclusion(s) of time for implementation

of the approved Resolution Plan upto 03.09.2023, the AOC

No. 6A in respect of Jet Airways (India) Ltd. shall be

considered as valid until 03.09.2023, subject to the following

conditions:-

i. This extension shall be applicable only for the limited

purpose of completing the ongoing CIRP.

ii. Jet Airways shall be required to undergo re-

certification in accordance with the procedure

contained in CAP 3100, as applicable for issuance of

AOC and demonstrate compliance of all the

applicable regulatory requirements afresh before

commencement of flight operations.

Civil Appeal Nos. 5023-5024 of 2024 Page 34 of 168

iii. Fee as applicable for issuance of AOC, shall be

payable for such re-certification.

iv. Jet Airways shall submit a firm action plan for revival

of operations after the company is taken over by the

SRA in accordance with the NCLT approved

resolution plan.

This issues with the approval of the Director General.”.

17. While the Company Appeal was pending before the NCLAT, the Appellants

filed an Affidavit dated 16.08.2023 (hereinafter, “Lender’s Affidavit”)

before the NCLAT. The Lender’s Affidavit provided that, if Respondent No.1,

firstly, infuses Rs. 350 Crore by 31.08.2023; secondly, complies with the

payment obligations to the workmen and employees, and; thirdly,

scrupulously follows the other terms and conditions of the Resolution Plan -

the Appellants would not contest the issues relating to the grant of

exclusion/extension of time as well as the issue relating to the compliance of

all Conditions Precedent by the Respondent and would withdraw the

Company Appeal pending before the NCLAT along with the Civil Appeals

filed before this Court. The Lender’s Affidavit also provided that, upon failure

to comply with the aforesaid conditions, the Corporate Debtor should be

directed to go into liquidation. This opportunity was given to Respondent

No.1/SRA as a one-time measure. Para 8 of the Lender’s Affidavit which

stipulates these conditions is reproduced hereinbelow:

“8. In the present appeal, the lenders are agreeable that in

case;

Civil Appeal Nos. 5023-5024 of 2024 Page 35 of 168

a) SRA infuses Rs. 350 Crores by 31.08.2023, the date by which

said payment is to be made as per the Resolution Plan, read

with Order dated 26.05.2023 passed by this Hon’ble

Tribunal; and

b) SRA Undertakes to scrupulously follow the other terms and

conditions of the resolution plan and

c) SRA complies with the liabilities relating to payment to the

employees as per order of NCLAT dated 21.10.2022 which

has been upheld by the Hon’ble Supreme Court in its order

dated 30.01.2023,

the Lenders would not contest the issues relating to granting

of exclusion/extension of time (in terms of the orders dt.

13.01.2023 passed by NCLT and order dt. 26.05.2023 passed

by this Hon’ble Tribunal) as well as on the issue relating to

compliance of condition precedent by the SRA and

accordingly undertakes to withdraw the present Company

Appeal (AT) Ins 129-130 of 2023 which is pending

adjudication before this Hon'ble Tribunal along with Civil

Appeal Nos. 4131-34 of 2023 & 3736-37 of 2023 filed before

the Hon'ble Supreme Court, on the said two issues. In other

words, lenders would not contest the granting of exclusions

as well as on the issue regarding the compliance of

Conditions Precedent, in case the aforesaid steps are taken

by SRA without any further delay. Failing to comply with the

conditions mentioned in Para 8(a) to (c) above, the

Corporate Debtor should be directed to go into liquidation.”

18. In response to the aforesaid Lender’s Affidavit, Respondent No.1 on

18.08.2023 filed IA Nos. 3801 and 3802 of 2023 (hereinafter, “Adjustment

application”) in the Company Appeal seeking inter alia – First, a direction

to the Appellants to adjust the PBG of Rs. 150 Crore towards part payment of

the first tranche under the Resolution Plan; second, to allow Respondent No.1

to infuse Rs. 100 Crore as share application money on or by 31.08.2023 and;

Civil Appeal Nos. 5023-5024 of 2024 Page 36 of 168

thirdly, to allow Respondent No.1 to infuse the remaining Rs. 100 Crore as

share application money on or before 30.09.2023. Through these applications,

Respondent No.1 further urged that, in the event the Gratuity Application was

not allowed, the Resolution Plan would not be implemented and in such

eventuality, the Appellants and the Corporate Debtor may be directed to

refund all the amounts infused or deposited by Respondent No.1. including

the share application money and the PBG.

19. The NCLAT, vide its order dated 28.08.2023, partly allowed the Adjustment

Application so far as the payment of the first tranche of Rs. 350 Crore was

concerned and stated that as regards the prayer with respect to the Gratuity

Application, the submissions required further consideration. The PBG of Rs.

150 was allowed to be adjusted against the first tranche payment and the

remaining Rs. 200 Crore was allowed to be infused on or by 31.08.2023 and

30.09.2023 respectively. Therefore, the deadline to infuse the aforesaid

amount and implement the Resolution Plan was further extended to

30.09.2023 (3

rd

implementation extension). Immediately thereafter, the

Appellants filed Civil Appeal Nos. 6427-6428 of 2023 before this Court

against the aforesaid order dated 28.08.2023 passed by the NCLAT.

20. Meanwhile, on 03.09.2023, the conditional AOC issued by the DGCA came

to an end. Before the expiry of the 3

rd

implementation extension i.e.,

Civil Appeal Nos. 5023-5024 of 2024 Page 37 of 168

30.09.2023, Respondent No. 1 had deposited an amount of Rs. 200 Crore.

However, it is the case of the Appellants that the manner of infusion of the

same was in contravention of the Resolution Plan, specifically Clause 2.1.5,

since Respondent No.1 infused a portion of the funds through a third party,

thereby inducting them into the Resolution Plan as a shareholder.

21. Before this Court, the following three Interim Orders passed by the NCLAT

came to be challenged by the Appellants over a period of time:

i) Civil Appeal Nos. 3736-3737 of 2023 challenging the Interim Order

dated 03.03.2023 passed by the NCLAT by which it declined to stay

the NCLT Order dated 13.01.2023 which held that all the Conditions

Precedent had been fulfilled;

ii) Civil Appeal Nos. 4131-4134 of 2023 challenging the Interim Order

dated 26.05.2023 passed by the NCLAT through which the NCLAT

restrained the Appellants from invoking the PBG and extended the

time for infusion of first tranche payment of Rs. 350 Crore up to

31.08.2023; and

iii) Civil Appeal Nos. 6427-6428 of 2023 challenging the Interim Order

dated 28.08.2023 passed by the NCLAT allowing the PBG of Rs. 150

Crore to be adjusted against the first tranche payment and allowing

the remaining amount of Rs. 200 Crore to be infused by 30.09.2023.

Civil Appeal Nos. 5023-5024 of 2024 Page 38 of 168

22. All the aforementioned appeals were heard together and vide common

judgment and order dated 18.01.2024, this Court held that the PBG cannot be

permitted to be adjusted against the first tranche payment and therefore,

directed that the amount of Rs. 150 Crore be infused in cash on or before

31.01.2024 (4th implementation extension). In the event of failure by

Respondent No.1 to infuse the said amount within the said date, this Court

held that the consequences under the Resolution Plan would follow. It

disposed of the appeals as thus:

“25. The lenders have argued in the appeals that there has

been a failure on the part of the successful resolution

applicant to comply with the conditions precedent. If the

successful resolution applicant were to comply with the

terms as envisaged in SBI's affidavit dated August 16, 2023,

evidently issues pertaining to compliance with the conditions

precedent were not to be pressed thereafter. In order to

furnish this successful resolution applicant a final

opportunity to comply and consistent with the above

position, we issue the following directions:

(i) The successful resolution applicant shall peremptorily on

or before January 31, 2024, deposit an amount of Rs. 150

crores into the designated account of SBI, failing which the

consequences under the resolution plan shall follow;

(ii) The performance bank guarantee of Rs. 150 crores shall

continue to remain in operation and effect, pending the final

disposal of the appeal before the National Company Law

Appellate Tribunal, and shall abide by the final outcome of

the appeal and the directions that may be issued by the

National Company Law Appellate Tribunal; and

(iii) Whether or not the successful resolution applicant has

been compliant with all the conditions of the resolution plan

as well as of the conditions set out in paragraph 8 of the

affidavit dated August 16, 2023 shall be decided by the

Civil Appeal Nos. 5023-5024 of 2024 Page 39 of 168

National Company Law Appellate Tribunal in the pending

appeal.”

(emphasis supplied)

23. Respondent No.1 failed to deposit Rs. 150 Crore in cash by 31.01.2024 as

directed by this Court. Therefore, on 27.01.2024, Respondent No.1 filed Misc.

Application Nos. 216-217 of 2024 in the Civil Appeal Nos. 6427-6428 of 2023

seeking an extension of time for making the deposit of Rs. 150 Crore. The

same was dismissed by us vide order dated 02.02.2024 as being misconceived

in view of our previous order dated 18.01.2024. This order is reproduced

hereunder:

“ ORDER

1. The Miscellaneous Application is misconceived in

view of the final order passed by this Court on 18 January

2024.

2. The Miscellaneous Application is accordingly

dismissed.

3 Pending applications, if any, stand disposed of.”

24. Later, the NCLAT, vide its impugned order dated 12.03.2024, dismissed the

Company Appeal filed by the Appellants against the order of the NCLT dated

13.01.2023 while holding that Respondent No.1 had fulfilled all the

Conditions Precedent and had also complied with all the other terms of the

Resolution Plan. The following were the concluding observations in the

impugned order of the NCLAT:

Civil Appeal Nos. 5023-5024 of 2024 Page 40 of 168

“129. In view of our foregoing discussions and conclusions,

we dispose of these Appeals in the following manner:

1. The impugned order passed by the Adjudicating

Authority dated 13.01.2023 is upheld.

2. The Monitoring Committee and MC Lenders as well as

SRA are directed to take steps for creation of charge

over the Dubai Property No. 1, Dubai Property No. 2,

and Dubai Property No.3 within a period of 30 days

from today. The SRA to bear all necessary expenses for

creation of necessary charge.

3. The Performance Bank Guarantee of INR 150 Crores,

which is lying with the Monitoring Committee/MC

Lenders, shall be adjusted towards the first tranche

payment of INR 350 crores as INR 200 crores have

already been paid by the SRA. By adjustment of PBG

as per the Resolution Plan, the first tranche of payment

of INR 350 crores shall be completed.

4. Steps shall be taken for re-constitution of the shares as

per the Resolution Plan forthwith.

5. Out of the first tranche payment of INR 350 crores,

payments shall be made to the workmen and employees

and the creditors as per the Resolution Plan, including

the payment of CIRP cost as per the Resolution Plan,

which payment shall be completed within 60 days from

the date of this judgment.

6. The SRA shall submit an Application for re-issue of Air

Operation Certificate which may be obtained within 90

days from the date of this judgment.

7. The closing date shall be 90

th

day from the date of this

judgment, on which date, handing over of the

Corporate Debtor to the SRA by the Monitoring

Committee shall be completed.

8. Towards the payment of provident fund dues, as per the

order dated 21.10.2022 passed by this Tribunal in

Company Appeal (AT) (Insolvency) Nos. 643 of 2021,

SRA has undertaken to make payment of provident fund

upfront along with payment of dues of workmen and

employees as per the Resolution Plan, which payment

Civil Appeal Nos. 5023-5024 of 2024 Page 41 of 168

of INR 12 Crores as undertaken, shall be made in

addition to the payments as directed above.”

(emphasis supplied)

25. The aforesaid judgment and order of the NCLAT once again extended the time

limit for implementation of the Resolution Plan and satisfaction of the first

tranche payment obligation of Rs. 350 Crore to 11.04.2024 i.e., the date within

which the creation of charge over the various Dubai properties was to be

completed (5

th

implementation extension). The same charge has, admittedly,

not been created as on date.

26. In light of the above, the Appellants have challenged the aforesaid impugned

order of the NCLAT dated 12.03.2024 by way of the present Civil Appeals

filed under Section 62 of the IBC, 2016.

B. SUBMISSIONS ON BEHALF OF THE APPELLANTS

27. Mr. N. Venkataraman, learned ASG appearing for the Appellants broadly

classified his submissions into the following issues:

i. That the direction of the NCLAT in the impugned order dated

12.03.2024 allowing Respondent No.1 to adjust the PBG of Rs. 150

Crore towards the first tranche payment of Rs. 350 Crore, runs counter

Civil Appeal Nos. 5023-5024 of 2024 Page 42 of 168

to the judgement of this Court dated 18.01.2024. The Resolution plan

mandates a cash infusion and the question of PBG adjustment would

arise only when the three Dubai properties valued at Rs.250 crores are

mortgaged by Respondent No.1.

ii. That the NCLAT, through its impugned order dated 12.03.2024

erroneously limited the Airport Dues to Rs. 25 Crore and further

categorising it as a part of the CIRP costs especially when the

Resolution Plan obligates an upfront payment of Rs. 475 Crore towards

Airport Dues. Such an error is glaring since the Resolution Plan clearly

excludes the Airport Dues from the ambit of CIRP costs.

iii. That the NCLAT while approving the Resolution Plan vide its Order

dated 21.10.2022 increased the workmen’s dues from Rs. 52 Crore to

Rs. 289.2 Crore (which according to the appeals filed by the workmen

would be reduced to Rs. 226 Crore post the demerger of the ground

handling business). An appeal against the order stood dismissed by this

Court on 30.01.2023. Therefore, it is a matter of concern that the

impugned order of the NCLAT limited the workmen’s compensation

to a mere Rs. 12 Crore which is contrary to its earlier order dated

21.10.2022 as upheld by this Court on 30.01.2023.

Civil Appeal Nos. 5023-5024 of 2024 Page 43 of 168

iv. Clause 7.6.1 of the Resolution Plan deals with the five Conditions

Precedent and imposes an obligation on the SRA to fulfil the same in

order to recommence the operations of the Corporate Debtor as an

aviation company. The SRA could be said to have breached three of

these conditions i.e. Condition (a) on obtaining the AOC; Condition (c)

on obtaining the Slots Allotment Approval, and; Condition (d) on

obtaining the International Traffic Rights Clearance. The NCLT, vide

its order dated 13.01.2023 had held that the Conditions (a) and (c) stood

fulfilled and amended Condition (d) which effectively transformed it

from a condition precedent to a condition subsequent. Such erroneous

findings came to be wrongly affirmed by the NCLAT through its

impugned order dated 12.03.2024.

i. Issue No.1: Adjustment of PBG of Rs. 150 Crore towards the first

tranche payment

28. As far as the first tranche payment of Rs. 350 Crore is concerned, it was

submitted that a payment of only Rs. 200 Crore in cash has been made and the

SRA has failed to infuse the remaining Rs. 150 Crore in cash.

Civil Appeal Nos. 5023-5024 of 2024 Page 44 of 168

29. The learned ASG submitted that Clause 6.3.1(g) relating to the “Infusion of

Funds and Timelines” provides that the timeline for the infusion of the upfront

first tranche payment of Rs. 350 Crore was within 180 days from the Effective

Date. The clause also indicates the manner in which the first tranche would

be utilized and obligates a distribution pattern towards the CIRP costs,

contingent fund, payments to FCs, OCs, other creditors and other

stakeholders, working capital for business and miscellaneous administrative

expenses.

30. The learned ASG then elaborated on the scope of Clause 7.7 of the Resolution

Plan which provides the “Implementation Schedule” and requires that the

Resolution Plan be completed within 5 years from the Effective Date.

According to this clause, the performance of different obligations was to be

completed within the said corresponding timelines. S.No. 11 under this table

specifically requires the infusion of Rs.350 Crore in the Corporate Debtor by

the SRA within “Z+150 days” where “Z” represents the Effective Date. The

expression “infusion” has been interpreted by this Court vide its judgement

dated 18.01.2024 to mean “payment in cash”.

31. Reference was made by the learned ASG to the RFRP, more particularly to

Clauses 3.13.1, 3.13.2, 3.13.7(iii) and 3.13.9 which mandate the execution of

a PBG for an amount of Rs. 150 Crore and also provide that the PBG cannot

Civil Appeal Nos. 5023-5024 of 2024 Page 45 of 168

be set-off against or used as a part of the consideration which the SRA

proposes to offer in relation to the company even if expressly indicated as such

in the successful Resolution Plan. It also provides for an automatic right to

invoke the PBG without any reference to the SRA, should the SRA fail to

implement the approved Resolution Plan in accordance with the terms of the

Resolution Plan and to the satisfaction of the CoC. It was also submitted that

vide Clauses 7.3 and 9.4 of the Resolution Plan respectively the spirit and

intention of the RFRP stood translated into the Resolution Plan. Under Clause

7.3 of the Resolution Plan, the SRA undertook to provide the PBG as per the

RFRP and in compliance with Regulation 36B(4A) of the 2016 Regulations.

Clause 9.4 of the Resolution Plan authorizes the invocation of the PBG in

terms of the RFRP.

32. The learned ASG submitted that Clause 6.4.4 of the Resolution Plan on

“Treatment of Financial Creditors - Summary of payments and Security

package” under its tabular column evidently conveys the mandate that the

SRA is under an obligation to execute a mortgage over the three Dubai

properties i.e., Property No. 1 valued at Rs. 100 Crore, Property No.2 valued

at Rs. 100 Crore and Property No.3 valued at Rs. 50 Crore. The table provides

that the date of creation of such security would be the Effective Date. This

security had to be created at the cost of the SRA. Therefore, the SRA was

obliged to not only infuse an amount of Rs. 350 Crore within 180 days of the

Civil Appeal Nos. 5023-5024 of 2024 Page 46 of 168

Effective Date, but also execute the mortgage of the three Dubai properties on

the Effective Date. In other words, the Resolution Plan obligated the SRA to

satisfy the following twin conditions for the PBG to be discharged – (a)

infusing Rs. 350 Crore as the first tranche payment and (b) executing a

mortgage on the three Dubai properties worth Rs. 250 Crore on the Effective

Date. The learned ASG submitted that, it is not in dispute that the NCLT vide

its order dated 11.04.2022 extended the time for achieving the Effective Date

to 25.05.2022 and Respondent No.1 claimed to have achieved the same on

20.05.2022. Consequently, all the three Dubai properties ought to have been

mortgaged on or before 20.05.2022.

33. It was submitted that the Respondent SRA failed to make the first tranche

payment of Rs. 350 Crore despite the fact that it ought to have been infused

within 6 months from 20.05.2022. Instead, the Respondent SRA continuously

contended that the order of the NCLT dated 13.01.2023 (holding that the

Conditions Precedent have been fulfilled) was challenged by the Appellants

before the NCLAT and that they could not therefore bring in Rs. 350 Crore

since the Effective Date had not yet materialized.

34. It was submitted that the Appellants filed the Lender’s Affidavit dated

16.08.2023 before the NCLAT and vide Para 8 of the Lender’s Affidavit, the

Appellants agreed not to contest the issues relating to the grant of exclusion

of time (granted by the Order of the NCLT dated 13.01.2023 and the NCLAT

Civil Appeal Nos. 5023-5024 of 2024 Page 47 of 168

dated 26.05.2023) and the issue relating to the compliance with the Conditions

Precedent. In the said affidavit, the Appellants also agreed to withdraw the

Company Appeal pending before the NCLAT along with the Civil Appeal

Nos. 4131-4134 of 2023 and Civil Appeal Nos. 3736-3737/2023 filed before

this Court. However, this would be subject to the fulfilment of the three

conditions imposed vide Para 8 by the SRA. The conditions were that – firstly,

the SRA infuses an amount of Rs. 350 Crore by 31.08.2023 i.e., the date by

which the said payment is to be made as per the Resolution Plan read with

order dated 26.05.2023 passed by the NCLAT; secondly, the SRA undertakes

to scrupulously follow the other terms and conditions of the Resolution Plan

and; thirdly, the SRA complies with the liabilities in relation to the payment

to be made to the employees as per the order of NCLAT dated 21.10.2022,

which has been upheld by this Court vide order dated 30.01.2023

35. It was submitted that in terms of Serial No. 11 under Clause 7.7.1 read with

Clause 6.1.3(g), the SRA had to infuse cash amounting to Rs 350 Crore and it

was for this reason alone that Para 8(a) of the Lender’s Affidavit refers

specifically to the infusion of Rs. 350 crore in cash by 31.08.2023. It was

reiterated that the first tranche payment had to necessarily be made in cash

since such a requirement flows from the Resolution Plan. It was not open to

the SRA to contend that the Resolution Plan had a different mode of payment

namely, the payment of Rs. 200 Crore in cash and Rs. 150 Crore by way of

Civil Appeal Nos. 5023-5024 of 2024 Page 48 of 168

adjusting the PBG. The learned ASG contended that none of the clauses in the

Resolution Plan stipulates such condition. To the contrary, under Clause 6.4.4,

the PBG could be released or adjusted only upon the satisfaction of the twin

requirements abovementioned. Therefore, the assumption by the Respondent

that the infusion of Rs. 350 Crore emanates only out of the Lender’s Affidavit

dated 16.08.2023, is totally incorrect. The Lender’s Affidavit has not and

cannot impose any condition over and above those which are provided under

the Resolution Plan. The Lender’s Affidavit was filed to only set out a

deadline for infusing Rs. 350 Crore by 31.08.2023, which was subsequently

extended by the order dated 28.08.2023 of the NCLAT to 30.09.2023. The

Lender’s Affidavit only insisted on compliance with payment obligations

within specified timelines and neither did it alter the Resolution Plan nor lay

out new conditions.

36. The NCLAT in its order dated 28.08.2023 fell in error in allowing the

adjustment of PBG of Rs. 150 Crore as a part of the first tranche payment.

This is evident from the order of this Court dated 18.01.2024, specifically

under Para 21, wherein it was held that an infusion of Rs. 350 Crore would

only mean an infusion by cash and the same could not be substituted for the

adjustment of PBG. This Court, further, under Para 25 directed that a failure

to make this payment on or before 31.01.2024 would necessitate the

consequences under the Resolution Plan to follow. This Court further issued

Civil Appeal Nos. 5023-5024 of 2024 Page 49 of 168

a direction that the NCLAT shall decide whether the SRA had been compliant

with all the conditions contained in the Resolution Plan as well as the

conditions in Clause 8 of the Affidavit dated 16.08.2023. This Court made it

clear that the non-infusion of Rs. 150 Crore in cash would lead to

consequences both in terms of the Affidavit and also the Resolution Plan since

the condition insofar as infusion was concerned, remained the same both in

the Affidavit and in the Resolution Plan. Therefore, the observation of the

NCLAT in the impugned order holding that the consequences of non-deposit

of Rs. 350 Crore was that “the SRA was not entitled to take any benefit of the

offer” is contrary to the Resolution Plan and the order of this Court dated

18.01.2024.

37. This Court had directed a cash payment of Rs. 150 Crore on or before

31.01.2024 and the SRA had admittedly failed to remit the same. Realizing

that this would lead to the initiation of the consequences under the Resolution

Plan, Respondent No.1 had applied for an extension before this Court which

was declined outright as being misconceived vide order dated 02.02.2024.

Therefore, the SRA having failed to make the payment and having breached

this Court’s order dated 18.01.2024, the NCLAT ought to have concluded that

the Resolution Plan had failed.

38. In the alternative, the ASG argued that, assuming without admitting that the

non-compliance of this Court’s Judgement dated 18.01.2024 would only have

Civil Appeal Nos. 5023-5024 of 2024 Page 50 of 168

the consequence of bringing a closure to the offer made in the Lender’s

Affidavit dated 16.08.2023 and not have any effect on the Appeal that was

pending before the NCLAT, the NCLAT while passing it’s final order dated

12.03.2024 ought to have insisted on the payment of Rs. 150 Crore in cash.

That would have been in tune with the specific direction that was issued by

this Court & the intent with which the direction was issued, and the SRA

having not paid the same, had committed a breach of the Resolution Plan. The

NCLAT went to the extent of swapping the conditions laid out in the

Resolution Plan by directing the adjustment of the PBG first and the execution

of the mortgage on the three Dubai properties later i.e., within 30 days from

its order dated 12.03.2024. It was submitted that even the extension that was

allowed for the execution of mortgage expired on 11.04.2024 and the SRA

continues to be a defaulter in this regard as well.

39. The ASG vehemently contended that, there has been a triple breach on the part

of SRA – Firstly, breach of the Resolution Plan; secondly, violation of the

directions issued by this Court dated 18.01.2024 and; thirdly, the failure to

execute the mortgage of the three Dubai properties before 11.04.2024.

40. The ASG submitted that the impugned order of the NCLAT dated 12.03.2024

at Para 129, granted 30 days’ time to the SRA for the creation of charge over

the Dubai properties and directed the SRA to bear all the necessary expenses.

Civil Appeal Nos. 5023-5024 of 2024 Page 51 of 168

It was submitted that there was complete inaction on the part of the SRA for

29 days from the date of the impugned order and on 10.04.2024 at 16:38 hours,

the SRA sent an email stating that they are willing to proceed with the security

creation of the Dubai properties and also informed that since its value had

reduced by Rs. 14 Crore, they would bridge the gap with an additional

property or a cash security. On the same date, another email was sent by the

SRA at 17:18 hours stating that an account balance of Rs. 76.07 Lakh is

available with the Appellants and the same may be used to execute the

mortgage. The ASG submitted that the Appellants replied to the said

communication on the same day at 19:18 hours stating that:

(a) The assenting financial creditors on 13.10.2023 have appointed Mashreq

Bank to act as the agent for creation of the mortgage in terms of the

prevailing law in Dubai and the necessary amount required to be paid to

them had not yet been received.

(b) After the impugned order of the NCLAT came to be passed on 12.03.2024,

the Appellants sent an email on 22.03.2024 regarding the cost for the

creation of a mortgage over the properties located in Dubai, which had not

been paid till date.

(c) That, instead of remitting the amount for creation of security as already

advised, the SRA was sending an email that it had “no objection with the

Civil Appeal Nos. 5023-5024 of 2024 Page 52 of 168

MC lenders immediately proceeding with the security creation of the

Dubai properties”.

(d) It was also brought to the notice of the SRA that 11.04.2024 would be the

last date for complying with the impugned order of the NCLAT and that

the SRA was well aware of the fact that the cost of creation of securities is

Rs. 2,36,00,767 and not Rs. 76.07 lakh. This shows the SRA’s clear

disinclination to execute the mortgage. It was further brought to the SRA’s

notice that they had failed to comply with the Resolution Plan and the

impugned order of the NCLAT dated 12.03.2024.

Further, on the same day, at 21:05 hours, the SRA sent an email referring to

12 acres of contiguous land situated in Aligarh, Uttar Pradesh which had been

valued in excess of Rs. 250 Crore, owned by a reputed individual entrepreneur

resident in India and that the SRA was ready to offer this property as an

alternative security in India. The Appellants replied to the said email on

16.04.2024 and stated that the period of 30 days had already expired on

11.04.2024, the expenses for creation of charge had not been paid and that

accepting the property in India which belongs to a third party would

tantamount to modification of the Resolution Plan.

41. The ASG therefore submitted that the above exchanges patently bring out the

SRA’s non-cooperation, defiance to judicial orders and desperate attempts to

Civil Appeal Nos. 5023-5024 of 2024 Page 53 of 168

suggest the creation of security of unknown third-party properties, all of which

were done after the expiry of the time period of 30 days provided by the

NCLAT for compliance with their order dated 12.03.2024. Consequently,

even in terms of the impugned Order of the NCLAT, there has been a total

breach on the part of the SRA which only indicates that they have no

inclination worth the name to implement the Resolution Plan. Consequently,

in terms of Clause 9.4 of the Resolution Plan and Clause 3.13.7(iii) of the

RFRP respectively, the Appellants are entitled to invoke the PBG

automatically without any reference to the SRA.

ii. Issue No. 2: Non-payment of Airport dues

42. It was submitted that in terms of Clause 6.3.1(d), the airport dues and parking

charges are to be paid by the SRA upfront in priority over any other payment

to the creditors of the Corporate Debtor. Clause 6.4.1(f) provides that on

31.08.2020, an approximate figure of Rs 240 Crore towards parking charges

for aircrafts and airport space lease charges was arrived at through the estimate

given by the RP and this was subject to a maximum of Rs. 475 Crore. Specific

attention was drawn to the expression in Clause 6.3.1(d) which states that

“such payments will be settled upfront in full in first 180 days from the

effective date and without any conditions (including not being staggered

Civil Appeal Nos. 5023-5024 of 2024 Page 54 of 168

payments spread across a period of time) so that flying can start immediately

without any future disputes and concerns with such claimants for past dues”.

The respondents, however, have not remitted any amount towards the airport

dues nor have they allowed the Resolution Plan to be implemented. As a result

of the several extensions/exclusions given by the NCLT and NCLAT to the

SRA, the airport dues as on date stand at a staggering figure of Rs. 1100 Crore

approx., which amount, again, is to be paid by the respondents alone.

43. The ASG submitted that, when the aforesaid is the position in the Resolution

Plan, the NCLAT in its impugned order dated 12.03.2024 vide Paras 53-55

respectively has chosen to restrict the Airport dues to a mere Rs. 25 Crore and

has erroneously construed it to be a part of the CIRP cost. The counsel drew

specific attention to Para 53 of the impugned order wherein the NCLAT had

referred to Clause 6.4.1(h) and stated that “…CIRP cost of the Corporate

Debtor (excluding parking charges, rental charges, employees dues, taxes

etc.) Accordingly, the Resolution Applicant has set aside a sum of Rs 25 crores

as CIRP cost towards payment of any such cost until the approval date…”.

Thus, despite the fact that Clause 6.4.1(h) on treatment of Outstanding CIRP

Costs excludes the parking charges, rental charges, employees’ dues, taxes

etc., the NCLAT has surprisingly read the same to mean as “inclusive

of/included in” the CIRP costs while directing the payment of a mere Rs. 25

Civil Appeal Nos. 5023-5024 of 2024 Page 55 of 168

Crore. Therefore, this is an error apparent on the face of it which requires

interference by this Court.

44. It was submitted that, in case the argument of the SRA that a maximum of

only Rs. 475 Crore is to be paid by the SRA under the Resolution Plan, is

accepted, then the entire amount of Rs. 475 Crore shall go towards the airport

dues and as a consequence, nothing would become payable to the financial

creditors, operational creditors, workmen etc. The amount of Rs. 240 Crore

was a mere estimate of the dues payable in the year 2020. Due to non-payment

and non-commencement of flying operations, the same amount in the year

2024 has increased multi-fold. To contend that such an increased amount does

not fall under the Resolution Plan and therefore, is not payable, will cast a

further burden on the CoC of the Corporate Debtor. Further, it would be unfair

to accept that, for the reason of the Respondent’s default in payment, the CoC

would have to bear the Airport dues of Rs. 1100 Crore and none of the

creditors or workmen would get anything out of this plan. This misconceived

contention which intentionally makes the plan unworkable needs to be

outrightly rejected.

iii. Issue No. 3: Non-payment of Workmen and Employees’ dues

Civil Appeal Nos. 5023-5024 of 2024 Page 56 of 168

45. The ASG submitted that the Resolution Plan originally provides for a sum of

Rs. 52 Crore towards the payment of workmen’s and employees’ dues.

However, the NCLAT vide its order dated 21.10.2022, in Para 78, had

increased the same to Rs. 289.2 Crore which now stands modified to about

Rs. 226 Crore. The NCLAT in the order dated 21.10.2022 under Para 80 had

observed in unambiguous terms that “the workmen are entitled to full payment

of provident fund and gratuity, hence the balance of above dues ought to be

paid by the SRA to satisfy statutory obligations. Non-payment of full provident

fund and gratuity shall lead to violation of Section 30(2)(e) and hence, to save

the Plan the above payments have to be made”. This view of the NCLAT had

also been upheld by this Court vide its order dated 30.01.2023. The Resolution

Plan under Clause 6.3.1(c) obligates the payment of such dues within 180 days

from the Effective Date.

46. It was submitted that, the NCLAT, vide Paras 111-114 had erroneously

directed the payment of an amount of Rs. 12 Crore towards the Provident

Fund and has completely ignored the payment of dues pertaining to gratuity

of the workmen and employees. The Appellants contend that this finding is

not only an error apparent but completely inconsistent with the NCLAT’s

own earlier order dated 21.10.2022, which stood upheld by this Court on

31.01.2023.

Civil Appeal Nos. 5023-5024 of 2024 Page 57 of 168

iv. Issue No. 4: Achievement of Effective Date

47. It was submitted that Clause 7.6.2 of the Resolution Plan provided that the

date of fulfilment of all the Conditions Precedent as stated in Clause 7.6.1,

shall be the Effective Date for the purposes of the Resolution Plan. A failure

to fulfill the Conditions Precedent within 270 days of the Approval Date

would lead to an automatic withdrawal of the Resolution Plan as per Clause

7.6.4. However, the NCLT, vide its order dated 22.06.2021, expressed its

opinion that there was uncertainty with respect to the achievement of the

Effective Date under the Resolution Plan and therefore, modified Clause 7.6.4.

As a consequence, it fixed the Effective Date to be the 90

th

day from the

Approval Date of 22.06.2021 and stated that this could be extended for a

maximum period of another 180 days. The Effective Date, therefore, became

22.09.2021 i.e., 90 days from 22.06.2021. Subsequently, three extensions

were given to the SRA with respect to the achievement of the Effective Date

– First, vide order dated 29.09.2021, the NCLT extended it to 22.12.2021;

Secondly, vide order dated 20.01.2022, the NCLT extended to 22.03.2022

through which the maximum extension of 270 days that could be provided

under the Resolution Plan had been reached and; Thirdly, vide order dated

11.04.2022, the NCLT further extended it to 25.05.2022 by excluding a period

Civil Appeal Nos. 5023-5024 of 2024 Page 58 of 168

of 65 days spent in moving the application for grant of time. Therefore, the

Effective Date was finally frozen on 25.05.2022.

48. The learned ASG submitted that the SRA, however, contended that the

Effective Date had been achieved on 20.05.2022 and the same was accepted

by the NCLT in its order dated 13.01.2023. Therefore, the calculation of 180

days for the infusion of the First Tranche Payment begins from 20.05.2022.

The initial 180 days had expired on 16.11.2022. However, several extensions

were given to the SRA for infusion of the first tranche payment – Firstly, vide

order dated 13.01.2023, the NCLT extended the timeline for infusion of First

Tranche Payment till 15.05.2023; Secondly, vide order dated 26.05.2023, the

NCLAT further extended the timeline of 180 days till 31.08.2023; Thirdly,

vide order dated 28.08.2023, the NCLAT extended the timeline of 180 days

till 30.09.2023 and; Fourthly, vide Order dated 18.01.2024, this Court

extended the time of 180 days for infusion till 31.01.2024.

49. The learned ASG highlighted that Respondent No.1 had failed to make the

first tranche payment of Rs. 350 Crore, airport dues of Rs. 475 Crore and the

workmen’s and employees’ dues of Rs. 226 Crore within the initial 180 days

from the Effective Date as well as within the multiple extensions granted by

the NCLT, NCLAT and this Court. The ASG submitted that multiple

extensions and accommodations have already been granted to the SRA for

Civil Appeal Nos. 5023-5024 of 2024 Page 59 of 168

implementation of the Resolution Plan. Therefore, it is too late in the day to

claim that the non-infusion of Rs. 150 Crore to complete the first tranche

payment of Rs. 350 Crore is only a breach of the Lender’s Affidavit dated

16.08.2023 and not the Resolution Plan. The same needs to be rejected

outrightly.

v. Issue No. 5: Non-fulfilment of Conditions Precedent

50. The ASG submitted that the respondents have failed to comply with 3

Conditions Precedent, specifically under Clauses 7.6.1(a), (c) and (d) of the

Resolution Plan respectively.

51. It was submitted that Clause 7.6.1 (a) requires the SRA to obtain an AOC

which has to be validated by the DGCA and the Ministry of Civil Aviation

(hereinafter, “MoCA”). The Respondent possessed an AOC on 20.05.2022

i.e., the Effective Date as contended by the SRA. The validity of the AOC was

further extended by the DGCA on 27.07.2023 up to 03.09.2023 subject to

certain conditions. It was clearly stated that the extension is only for the

limited purpose of completing the ongoing CIRP process and the Corporate

Debtor would be required to undergo fresh re-certification in accordance with

the prescribed procedure for issuance of an AOC and also submit a firm action

Civil Appeal Nos. 5023-5024 of 2024 Page 60 of 168

plan for the revival of its operations. The AOC expired on 03.09.2023 and the

same was never extended by the SRA.

52. It was submitted that the NCLT in its order dated 13.01.2023 had recorded a

finding that the Condition Precedent with respect to the AOC was fulfilled but

it must be noted that this was an observation made during a time when the

SRA had a valid subsisting AOC, which subsequently expired.

53. It was further submitted that vide letter dated 26.12.2023, the Director General

of Civil Aviation confirmed that no further extension of the AOC was granted

to the Corporate Debtor beyond 03.09.2023. The NCLAT in its impugned

order dated 12.03.2024 required the SRA to submit an application for re-

issuance of the AOC within 90 days from the date of its order and the deadline

for the same had expired on 12.06.2024. It was submitted that, even today,

the Respondents do not have a valid AOC and the fact that the Respondents

are contending that they had not renewed the AOC solely because of the matter

being under litigation, only exposes their disinterest and disinclination in

taking their obligations forward.

54. It was then submitted that Clause 7.6.1(c) requires the SRA to obtain Slot

Allotment Approval. The NCLT in its order dated 13.01.2023 vide para 124

had clearly rendered a finding that “there is no dispute that slots for which

Civil Appeal Nos. 5023-5024 of 2024 Page 61 of 168

SRA applied were granted to them by the concerned competent authority

including the slots in Delhi and Mumbai on settling the old dues and as such,

it cannot be considered as non-allotment of slots, as SRA has received the

slots it requested for in compliance with the plan approval order.” The ASG

also referred to the email dated 27.06.2022 issued by MAIL and the same

reads as under: “We are happy to consider your request for slots on parking

bay during the ongoing summer schedule. The same is subject to the closure

of ongoing discussions pertaining to settlement of outstanding dues of jet

airways towards MAIL.”

55. While the NCLT had correctly recorded a finding that the slot allotment is

subject to the payment of airport dues (which the Respondents had not paid

even today), the NCLAT vide para 50 and Para 55 erroneously concluded that

“the adjudicating authority has rightly observed that settling of old dues

cannot be considered as non-allotment of slots” and therefore condition

7.6.1(c) stands fulfilled. This finding is contrary to the finding recorded by

NCLT and the Resolution Plan and as a consequence, the Respondents could

be said to have breached this condition precedent as well.

56. The ASG submitted that Clause 7.6.1(d) requires the SRA to obtain the

International Traffic Rights Clearance. The NCLT, vide Para 125, had righty

held that “the international traffic rights clearance is required to be obtained

Civil Appeal Nos. 5023-5024 of 2024 Page 62 of 168

in compliance with the applicable laws which stipulates that minimum 20

aircrafts are required to be deployed before applying for such clearance”.

However, after holding so, the NCLT proceeded to conclude that this

condition cannot be satisfied upfront and can be fulfilled only when the

operations have recommenced successfully and that, therefore, this condition

precedent stood fulfilled. In simple terms, the NCLT could be said to have

modified a condition precedent to a condition subsequent and this view of the

NCLT has been upheld by the NCLAT in Paras 56 to 58. These findings are

in clear contradiction to the express stipulation in the Resolution Plan and

therefore, this condition too stands breached by the respondents.

57. One more aspect that the learned ASG highlighted through his submissions

was that, the Circular F.No.AV.14027/17/2018-AT-1 issued by the Office of

Director General of Civil Aviation provides certain requirements for

undertaking aerial work. Para 6 of the said Circular deals with Security

Clearance and the same requires the Applicant or Company and its Board of

Directors to obtain Security Clearance from the Ministry of Home Affairs

(MHA) if they are foreign nationals. It was submitted that according to the

communications dated 09.07.2024 issued by the Ministry of Civil Aviation, it

had been confirmed that Security Clearance had not been conveyed in respect

of Mr. Florian Fritsch. Hence, the threshold requirement of security clearance

Civil Appeal Nos. 5023-5024 of 2024 Page 63 of 168

has not yet been obtained by one of the Resolution Applicants, who according

to Clause 2.1.4 of the Resolution Plan, is the other partner to the Consortium

along with Mr. Murari Lal Jalan. The ASG also placed reliance on news items

which suggested that Mr. Florian Fritsch is facing money laundering

proceedings in three different jurisdictions. The same had been dealt with by

the NCLAT summarily in its impugned order in Para 125. However, it was

wrongly concluded that this was yet another attempt by the Appellants to

create roadblocks in the process of implementation of the Resolution Plan.

58. The counsel finally submitted that, since the Airport Dues and the CIRP costs

have substantially increased solely on account of the delay, the Court should

invoke its powers under Article 142 of the Constitution of India and direct that

the Corporate Debtor be sent to liquidation.

C. SUBMISSIONS ON BEHALF OF THE RESPONDENTS

59. On the other hand, Mr. Mukul Rohatgi, learned senior counsel appearing on

behalf of Respondent No.1 submitted that Section 62 of the IBC, 2016 requires

an appeal to the Supreme Court from an order of the NCLAT to be on a

“question of law”. He submitted that the present appeal only seeks to

challenge the concurrent findings of fact recorded by the NCLT and the

Civil Appeal Nos. 5023-5024 of 2024 Page 64 of 168

NCLAT, with regard to compliance of the Conditions Precedent by the SRA

and does not bring out any question of law. To fortify this submission, the

counsel placed reliance on the decision of this Court in IFCI Ltd. v. Sutanu

Sinha and Others reported in 2023 SCC OnLine SC 1529.

60. The counsel submitted that the directions issued by this Court vide order dated

18.01.2024 were interim and not final. The appeals which were decided by

this Court arose out of an interlocutory application which was filed by the

SRA seeking directions from the NCLAT on the mode of satisfying the

conditions in the Lender’s Affidavit dated 16.08.2023. It was submitted that

the same is evident from a reading of Para 19 which reads that “.. Observations

in the present judgment are confined to the arrangement which must operate

during the pendency of the appeal without the court expressing a final view

on merits of the appeal, which will fall for consideration before the NCLAT”.

Further, Para 21 of the same order stated that, “…The impugned order of the

NCLAT, on the other hand, allowed the plea of the SRA for adjustment and

consequential release of the PBG at the interlocutory stage. This prima facie

would not be in accordance with the tenor of paragraph 8 of the affidavit…”.

Therefore, it was submitted that the directions issued by this Court only related

to a scenario were the SRA sought benefit of the offer made in the Lender’s

Affidavit.

Civil Appeal Nos. 5023-5024 of 2024 Page 65 of 168

61. The counsel submitted that the NCLAT in its impugned order dealt with this

Court’s order dated 18.01.2024 at length and concluded that the direction

issued by this Court to deposit the amount of Rs. 150 Crore peremptorily on

or before 31.01.2024 was in reference to the Lender’s Affidavit dated

16.08.2023. Meaning thereby, the order of the NCLAT dated 28.08.2023 to

adjust the PBG of Rs. 150 Crore was substituted by the direction of the

Supreme Court. Therefore, the SRA would render itself disentitled to take

benefit of the offer of the Appellant that they would withdraw the Company

Appeal and the appeals before the Supreme Court. As such, the pending

Company Appeal was to be heard on merits and decided in accordance with

law by the NCLAT. In short, the entire issue before this Court was confined

to an interpretation as to how the condition of Rs. 150 Crore in the affidavit

was to be interpreted and if the condition was complied with, the Appeals

would stand withdrawn, if not, they would be decided on their own merits.

62. It was further submitted that the NCLAT rightly observed that, the submission

of the Appellant that the Corporate Debtor should be directed to be liquidated

on account of non-deposit of Rs. 150 Crore, cannot be accepted since the

Supreme Court neither considered nor expressed any opinion on the question

of liquidation. Liquidation was never recorded as a consequence and this is

evident from liquidation not being mentioned in; (a) the arguments of the

Civil Appeal Nos. 5023-5024 of 2024 Page 66 of 168

Appellants recorded by the NCLAT in its order dated 28.08.2023, (b) the

judgment of the NCLAT dated 28.08.2023, (c) the arguments of the

Appellants recorded by this Court in its order dated 18.01.2024 and, the

findings or the directions of this Court in its order dated 18.01.2024.

63. The counsel also submitted that the adjustment of the PBG against the first

tranche payment was possible under the Resolution Plan, specifically under

Clause 6.4.4 which sets out the “Summary of payments and security package”.

It is evident through Clause 6.4.4 that a revolving package was agreed against

each tranche of the payment under the Resolution Plan. For the first tranche

of payment, the security package comprises of the PBG and one of the Dubai

Properties and it is stated that the PBG will be adjusted against the first tranche

payment. For subsequent tranches of payment, the security package does not

include the PBG and instead includes other types of security. It was submitted

that the Lenders are relying on the RFRP to claim that no adjustment of the

PBG was possible. However, the RFRP is only a wish list of the CoC which

was informed to the applicants at the time of inviting plans. Therefore, it

cannot override a negotiated and approved provision of the Resolution Plan.

This is precisely why the approved Resolution Plans often deviate from the

RFRP.

Civil Appeal Nos. 5023-5024 of 2024 Page 67 of 168

64. The counsel submitted that according to Clause 6.4.4 of the Resolution Plan,

the Balance Security is in the form of immovable properties located in Dubai

and since they are located outside India, the approval of the RBI was necessary

for the creation of security. The security on the Dubai properties of the SRA

was to be created on the Effective Date, i.e., 20.05.2022. On 21.05.2022, a day

after the Effective Date, the SBI had applied for the approval and the same

was received on 22.07.2022.

65. It was submitted that, on 03.02.2023 the SRA had shared drafts of the

transaction documents required for the creation of security. However, no

comments were received from the Appellants. It is the case of the SRA that

the Appellants did not reply to the reminder emails sent between the months

of May and October 2023 and this issue was also discussed during the 37

th

MC Meeting dated 09.10.2023. However, after more than a year of sharing

the transaction documents, the Appellants sent their comments on the same on

08.04.2024 i.e., three days before the expiry of the 30-day timeline given

under the impugned order of the NCLAT.

66. It was further submitted that, only in the 42nd MC Meeting that took place on

02.04.2024 the SRA was informed for the first time that, as per the recent

valuation, the valuation of the Balance Security worked out at Rs. 236 Crore

and that there was a shortfall of Rs. 14 Crores. In the same meeting, the SRA

Civil Appeal Nos. 5023-5024 of 2024 Page 68 of 168

suggested that a property in India valued at Rs. 250 Crore could be provided

as an alternate security. Vide email dated 10.04.2024, the SRA provided

details of the alternate security equivalent to Rs. 250 Crore in India. However,

the Appellants responded to the above vide their email dated 16.04.2024

stating that providing an alternate security would tantamount to modification

of the Resolution Plan.

67. The counsel submitted that the SRA, vide email dated 16.04.2024 conveyed

that they had not received any invoice from Mashreq Bank towards payment

of their costs for acting as an agent for security creation and that the payment

of security related costs to the extent of Rs. 76 Lakh could be done from the

existing deposit with the Appellants. For the balance amounts, they requested

that the invoices be shared with the SRA and that the same would be processed

immediately. On 20.04.2024 and 01.05.2024 respectively, the SRA reminded

the Appellants to share the invoices for the purpose of security creation.

68. On the issue of security creation, the counsel summed up submitting that the

SRA had done everything within its control to enable the Appellants to create

security including agreeing to bear all costs and expenses for creation and

preservation of security, providing contracts for such security creation, and

providing title documents of all the immovable properties to the Appellants.

Civil Appeal Nos. 5023-5024 of 2024 Page 69 of 168

Therefore, the contention that the SRA failed to create Balance Security is

factually incorrect.

69. With respect to the payment of the Airport Dues, it was submitted that, the

Resolution Plan provides for the adjustment of CIRP dues from the positive

cash balance of the Corporate Debtor and then from the share of the Lenders.

The Appellants’ own case is that the Airport Dues amount to Rs. 1000 Crore

approximately. Therefore, as per the Resolution Plan, Rs. 400 Crore approx.

is payable towards the airport dues, first, from the positive cash balance of the

Corporate Debtor and if that is insufficient, then from the Lenders’ share being

CIRP Dues. Finally, the remaining Rs. 600 Crore would be borne by the SRA

70. As regards the payment of Provident Fund and Gratuity to the workmen and

employees, it was submitted that the NCLAT did not waive off the liability of

the SRA towards the payment of PF and Gratuity. On the contrary, for the

implementation of the same, the NCLAT had provided timelines for making

such payments in compliance with the applicable laws. It was further

submitted that in the 42

nd

MC meeting held on 02.04.2024, the SRA undertook

to make the payment towards the dues of PF and gratuity and the Appellants

are aware of the same.

Civil Appeal Nos. 5023-5024 of 2024 Page 70 of 168

71. The counsel submitted that there are concurrent findings on the fulfillment of

Conditions Precedent vide the order of the NCLT dated 13.01.2023 and the

impugned order of the NCLAT dated 12.03.2024. Clause 7.6.1 of the

Resolution Plan sets out five Conditions Precedent. It was submitted that two

of the five Conditions Precedent were “admittedly complied” with. On the

remaining three, both the Tribunals have rendered concurrent findings, which

ought not to be interfered with in an appeal under Section 62 of the IBC, 2016,

which is effectively a Second Appeal.

72. The counsel submitted that the SRA cannot suo moto infuse funds into the

Corporate Debtor since such infusion necessarily requires steps/actions to be

taken by the Appellants and the Corporate Debtor acting through the MC.

These steps include the appointment of directors on the board of the Corporate

Debtor and seeking in-principal approval from the relevant stock exchanges

under the SEBI LODR Regulations by the Corporate Debtor. However,

despite constantly following up with the Appellants, the same has not been

received yet and therefore, they have not allowed the SRA to undertake such

a funding.

73. The Counsel submitted that the first Condition Precedent is the Validation of

AOC by DGCA and MoCA as provided under Clause 7.6.1(a). The SRA had

a valid AOC until 03.09.2023 and the lapse of the AOC during the pendency

Civil Appeal Nos. 5023-5024 of 2024 Page 71 of 168

of the appeals cannot mean that the Condition Precedent was not met. It was

submitted that the condition was met on the date of the implementation

application being filed before the NCLT and that the AOC has not been

renewed only due to the fault of the Appellants.

74. It was submitted that the third Condition Precedent was the requirement of

Slot Allotment Approval as provided under Clause 7.6.1(c). The counsel

rejected the contention of the Appellants that the slots were not provided

because the airport charges were not paid and stated that the airport charges

are a part of the CIRP costs which could be met as and when the Resolution

Plan was operationalized. It was further submitted that the SRA had obtained

48 slots on the Effective Date when it was supposed to secure only 46 slots.

The NCLT in its order dated 21.06.2022 had also held that it was not possible

for the SRA to obtain the slots that were historically available to the Corporate

Debtor. Therefore, this Condition Precedent has also been met.

75. The counsel submitted that the fourth Condition Precedent related to obtaining

the International Traffic Right Clearance as stated under Clause 7.6.1(d) of

the Resolution Plan. This Condition Precedent had to be satisfied in

accordance with the “applicable laws”. Upon applying for the Clearance, the

MoCA had informed the SRA that, Clause 8(b) of the National Civil Aviation

Policy, 2016 requires a minimum of 20 aircrafts to be deployed for domestic

Civil Appeal Nos. 5023-5024 of 2024 Page 72 of 168

operations before applying for international clearance and that therefore, the

same can be granted when 20 aircrafts of the Corporate Debtor are in

operation. The Business Plan only envisages 6 aircrafts and the SRA can

operationalize 20 aircrafts once the operations of the Corporate Debtor begin.

This is evident from Clause 8.2.6(f) that states that the restart of international

operations can be envisaged only after the completion of 12 months of

operating the airline. Since this condition requires operations to re-commence

before it can be satisfied, this Condition Precedent has also been complied

with.

76. Mr. Gopal Sankaranarayanan, learned senior counsel also appearing for the

Respondents, concurred with all the aforesaid submissions made on behalf of

the SRA. In addition to bringing our attention to Clause 6.4.4 on the issue of

adjustment of the PBG, he also referred to Clause 6.4.12 of the Resolution

Plan which stated that the PBG will bring financial flexibility for the SRA and

help the SRA to advance the committed payments and achieve its goal of re-

commencing the operations of the Corporate Debtor at the earliest.

77. It was submitted that the NCLAT order dated 28.08.2023 rightly recognized

that Regulation 36B(4A) of the 2016 Regulations only provides for the PBG

requirement for the purposes of the RFRP and the same has been complied

with by the SRA. Further, the counsel pointed out that Clause 6.4.4 (a)(i)

Civil Appeal Nos. 5023-5024 of 2024 Page 73 of 168

elaborates on the “Committed Cash Payments” to be made to the Financial

Creditors. In the table, under the heading “Date of release of Security”, the

PBG of Rs. 150 Crore was not mentioned while the other two forms of security

find a mention. Thus, the intention was that, the PBG be adjusted in making

the first tranche payment.

78. The counsel further submitted that there is no specific consequence provided

under the Resolution Plan for a default in the creation of security. It was

reiterated that the SRA had undertaken all possible steps to further the

execution of the mortgage of the Dubai properties as per the Resolution Plan

and it is the Appellants who have not cooperated in this regard.

79. The counsel submitted that the Appellants have taken contradictory stances at

different stages of the dispute before different forums. Before the NCLAT in

its pending Company Appeal, it was contended by the Appellants that the

NCLT had erroneously allowed the Resolution Plan to be implemented

without the complete compliance of the Conditions Precedent by the SRA.

However, before this Court, they have argued that the SRA has claimed that

the Conditions Precedent were fulfilled on 20.05.2022 and has asserted that it

would be the Effective Date. As a consequence, the SRA should have met with

their first tranche payment obligations within 180 days from the Effective

Date.

Civil Appeal Nos. 5023-5024 of 2024 Page 74 of 168

80. The counsel submitted that the consequences of non-compliance with the

Conditions Precedent were that the SRA would not be able to re-commence

operations as an aviation company as stated in Clause 7.6.1 of the Resolution

Plan. He also submitted that the Effective Date for the purposes of the

Resolution Plan would only kick in upon the fulfillment of all the Conditions

Precedents. The consequence of non-compliance with the Conditions

Precedent would be that the Resolution Plan shall automatically stand

withdrawn and upon, such withdrawal, the members of the SRA in the MC

shall resign and the remaining members of the MC shall assume absolute

control of the Corporate Debtor.

81. Adding to the submissions as regards the Airport Dues, it was submitted that

as per the estimates made by the RP, the airport dues i.e., the parking charges

and airport space lease charges were Rs. 240 Crore and this was reflected in

Clause 6.4.1(f) of the Resolution Plan. It was submitted that the dues accrued

during the period of CIRP i.e., till the date of approval of the Resolution Plan,

is a part of the CIRP costs and such payments have to be made within 170

days from the Effective Date as per Clause 6.4.1 of the Resolution Plan. As

per Clause 6.4.1(h), a sum of Rs. 25 Crore was set aside for CIRP costs.

However, it must be noted that Clause 6.4.1(m) allows the SRA to utilize the

funds available with the Corporate Debtor for making payments of any portion

Civil Appeal Nos. 5023-5024 of 2024 Page 75 of 168

of the CIRP costs. It was submitted that the Lenders rely on Clause 6.3.1(d)

to state that the airport dues have to be settled upfront and not in staggered

payments. However, Clause 6.3.1(d) is just a proposal and not a condition of

the Resolution Plan.

82. On workmen and employees’ dues, it was submitted that, as per Clause 6.4.2

on the “Summary of Financial Proposal” the amount demarcated for all the

claims related to employees or workmen was Rs. 52 Crore and as per the

Implementation Schedule, these claims were to be paid within 175 days from

the Effective Date. However, the NCLAT vide its order dated 21.10.2022

increased it to Rs. 113 Crore since it was the minimum liquidation value that

they were entitled to as per the estimates of the RP. The final directions issued

by the NCLAT in the aforesaid order conveyed that the workmen and

employees are entitled to the payment of unpaid PF and gratuity till the

Insolvency Commencement Date and the RP was directed to compute such

payment within 30 days. The RP had calculated such amounts to be Rs. 14

Crore towards PF and Rs. 188.7 Crore towards gratuity. It was submitted that

neither the NCLAT order dated 21.10.2022 nor the order of this Court dated

30.01.2023 had provided any specific timelines for fulfillment of these

additional liabilities which were cast upon the SRA. This is precisely why the

SRA proposed to pay Rs. 14 Crore towards PF upfront in compliance with

Civil Appeal Nos. 5023-5024 of 2024 Page 76 of 168

Section 11 of the PF Act and pay the Gratuity dues of Rs. 188.2 Crore in a

staggered manner.

83. The counsel finally referred to the letter dated 16.08.2024 sent by MoCA

which provided Security Clearance in respect of a proposed Director of the

Corporate Debtor, Mr. Swapnil Jain. The validity period of this Security

Clearance was stated to be co-terminus with the validity period of the AOC

which was issued by the DGCA.

D. ISSUES FOR DETERMINATION

84. Having heard the learned counsel appearing for the parties and having gone

through the materials on record, the following questions of law fall for our

consideration: -

i. Whether the Performance Bank Guarantee (PBG) could have been

adjusted against the first tranche payment which was to be made under

the Resolution Plan, within 180 days from the Effective Date, in

contravention of the order of this Court dated 18.01.2024, the terms of

the Resolution Plan and the provisions of law? To put it in other words,

whether the impugned order of the NCLAT allowing the adjustment of

the Performance Bank Guarantee (PBG) in lieu of payment of the first

tranche could be said to be perverse?

Civil Appeal Nos. 5023-5024 of 2024 Page 77 of 168

ii. Whether the non-implementation of the Resolution Plan by the SRA

necessarily leads to the consequence of liquidation as provided under

Section 33(3) of the IBC, 2016?

iii. Whether the timely implementation of the Resolution Plan is also one

of the objectives of the IBC, 2016?

E. ANALYSIS

85. Before we proceed to advert to the rival submissions canvassed on either side

and the issues outlined above, we must look into the preliminary objection

raised on behalf of the SRA i.e., that the scope of an appeal under Section 62

of the IBC must be restricted to a “question of law”. In this regard, reliance

was placed on the decision of this Court in IFCI Ltd. v. Sutanu Sinha and

Others reported in 2023 SCC OnLine SC 1529 which dealt with the issue as

to whether compulsorily convertible debentures could be treated as a “debt”

instead of an equity instrument, to submit that the jurisdiction under Section

62 is restricted to a question of law akin to a second appeal. The relevant

observations are reproduced hereinbelow:

“29. Last but not the least, we must also note that our

jurisdiction comes from section 62 of the Code. The said

section reads as under:

“62. (1) Any person aggrieved by an order of the

National Company Law Appellate Tribunal may file an

appeal to the Supreme Court on a question of law

Civil Appeal Nos. 5023-5024 of 2024 Page 78 of 168

arising out of such order under this Code within forty-

five days from the date of receipt of such order”.

30. The jurisdiction is restricted to a question of law akin to

a second appeal. The law does not envisage unlimited tiers

of scrutiny and every tier of scrutiny has its own parameters.

Thus, the lis inter se the parties has to be analysed within the

four corners of the ambit of the statutory jurisdiction

conferred on this court.

31. We are thus of the view that the appeal does not raise any

such question of law and that the findings of the courts below

are in accordance with settled principles.”

(emphasis supplied)

86. Section 100 of the Code of Civil Procedure, 1908 is the provision related to a

second appeal and it reads as thus:

“100. Second appeal – (1) Save as otherwise expressly

provided in the body of this Code or by any other law for the

time being in force, an appeal shall lie to the High Court

from every decree passed in appeal by any Court

subordinate to the High Court, if the High Court is satisfied

that the case involves a substantial question of law.

(2) An appeal may lie under this section from an appellate

decree passed ex parte. (3) In an appeal under this section,

the memorandum of appeal shall precisely state the

substantial question of law involved in the appeal.

(4)Where the High Court is satisfied that a substantial

question of law is involved in any case, it shall formulate that

question.

(5)The appeal shall be heard on the question so formulated

and the respondent shall, at the hearing of the appeal, be

allowed to argue that the case does not involve such

question:

Provided that nothing in this sub-section shall be deemed to

take away or abridge the power of the Court to hear, for

reasons to be recorded, the appeal on any other substantial

Civil Appeal Nos. 5023-5024 of 2024 Page 79 of 168

question of law, not formulated by it, if it is satisfied that the

case involves such question.”

(emphasis supplied)

87. This Court in Chandrabhan (Deceased) Through Lrs. And Others v.

Saraswati and Others reported in 2022 SCC OnLine SC 1273 explained as

to what constitutes a “substantial question of law” under Section 100 of the

Code of Civil Procedure, 1908. The relevant observations made are

reproduced hereinbelow:

“33. The principles relating to Section 100 of the CPC

relevant for this case may be summarised thus:

(i) An inference of fact from the recitals or contents of a

document is a question of fact. But the legal effect of the

terms of a document is a question of law. Construction of a

document involving the application of any principle of law,

is also a question of law. Therefore, when there is

misconstruction of a document or wrong application of a

principle of law in construing a document, it gives rise to a

question of law.

(ii) The High Court should be satisfied that the case involves

a substantial question of law, and not a mere question of law.

A question of law having a material bearing on the decision

of the case (that is, a question, answer to which affects the

rights of parties to the suit) will be a substantial question of

law, if it is not covered by any specific provisions of law or

settled legal principle emerging from binding precedents and

involves a debatable legal issue. A substantial question of

law will also arise in a contrary situation, where the legal

position is clear, either on account of express provisions of

law or binding precedents, but the court below has decided

the matter, either ignoring or acting contrary to such legal

principle. In the second type of cases, the substantial

question of law arises not because the law is still debatable,

Civil Appeal Nos. 5023-5024 of 2024 Page 80 of 168

but because the decision rendered on a material question,

violates the settled position of law.

(iii) The general rule is that the High Court will not interfere

with findings of facts arrived at by the courts below. But it is

not an absolute rule. Some of the well-recognised exceptions

are where (i) the courts below have ignored material

evidence or acted on no evidence; (ii) the courts have drawn

wrong inferences from proved facts by applying the law

erroneously; or (iii) the courts have wrongly cast the burden

of proof. When we refer to “decision based on no evidence”,

it not only refers to cases where there is a total dearth of

evidence, but also refers to any case, where the evidence,

taken as a whole, is not reasonably capable of supporting the

finding.”

(emphasis supplied)

This Court recapitulated that a substantial question of law would also arise in

a situation where the legal position is clear, either on account of express

provisions of law or binding precedents, but the Court below has ignored or

acted contrary to such legal principles while deciding the matter. In such

circumstance, the decision rendered by the Court below would violate a settled

position of law and therefore, constitute a substantial question law.

Furthermore, it was observed therein that it is not an absolute rule that the

Court in a second appeal will not interfere with findings of fact. One of the

well-recognized exceptions is where the Courts below have drawn wrong

inferences from proved facts, by applying the law erroneously.

88. In Maria Colaco and Another v. Alba Flora Herminda D’souza and Others

reported in (2008) 5 SCC 268, it was held that in the second appeal under

Civil Appeal Nos. 5023-5024 of 2024 Page 81 of 168

Section 100 CPC, the High Court should not interfere on the questions of fact.

However, if on a scrutiny of the evidence, it is found that the finding recorded

by the first appellate court is totally perverse then an interference is certainly

possible in the matter as it constitutes a question of law. The relevant

observations are reproduced hereinbelow:

“7. The learned Single Judge after considering the matter

found that these averments did not constitute the basis on the

part of the plaintiff that he was not in possession of the suit

property. On the contrary, the learned Single Judge found in

reply to Para 13 of the plaint that the defendants in their

written statement admitted that the work was stopped by

Defendant 1 for some time but they restarted the work again.

This, according to the learned Single Judge was a proof of

the fact that Defendants 1 and 2 and Defendant 3 were not

sure about the possession and right of Defendants 1 and 2

over the property. In fact, what transpires from all these facts

is that the trial court reached the same conclusion as the

learned Single Judge in second appeal in the High Court. It

is true normally that in the second appeal the High Court

should not interfere on the questions of fact. But if on the

scrutiny of the evidence it is found that the finding recorded

by the first appellate court is totally perverse then certainly

the High Court can interfere in the matter as it constitutes

the question of law.”

(emphasis supplied)

89. In Abdul Raheem v. Karnataka Electricity Board and Others reported in

(2007) 14 SCC 138, the Court acknowledged that the High Court’s

jurisdiction in terms of Section 100 is limited. Having said so, it was also

Civil Appeal Nos. 5023-5024 of 2024 Page 82 of 168

observed that a consideration of irrelevant facts, non-consideration of relevant

facts and a finding of fact arrived at by overlooking vital documents would

also give rise to a substantial question of law. The relevant observations are

reproduced hereinbelow:

“10. A substantial question of law ordinarily would not arise

from the finding of facts arrived at by the trial court and the

first appellate court. The High Court's jurisdiction in terms

of Section 100 of the Code is undoubtedly limited.

11. The question as to whether the plaintiff was ready and

willing to perform its part of contract by itself may not give

rise to a substantial question of law. Substantial question of

law should admittedly be formulated relying on or on the

basis of findings of fact arrived at by the trial court and the

first appellate court.

12. However, there cannot be any doubt whatsoever that

consideration of irrelevant fact and non-consideration of

relevant fact would give rise to a substantial question of law.

Reversal of a finding of fact arrived at by the first appellate

court ignoring vital documents may also lead to a substantial

question of law. In Vidhyadhar v. Manikrao [(1999) 3 SCC

573] this Court held : (SCC p. 586, para 23)

“23. The findings of fact concurrently recorded by the

trial court as also by the lower appellate court could not

have been legally upset by the High Court in a second

appeal under Section 100 CPC unless it was shown that

the findings were perverse, being based on no evidence or

that on the evidence on record, no reasonable person

could have come to that conclusion.”

(See also Iswar Bhai C. Patel v. Harihar Behera [(1999) 3

SCC 457] .)

14. We may, however, notice a few decisions in regard to the

jurisdiction of the High Court under Section 100 of the Code.

In Commr. of Customs (Preventive) v. Vijay Dasharath

Civil Appeal Nos. 5023-5024 of 2024 Page 83 of 168

Patel [(2007) 4 SCC 118] this Court held : (SCC p. 128,

paras 22-26)

“22. We are not oblivious of the fact that the High Court's

jurisdiction in this behalf is limited. What would be

substantial question of law, however, would vary from

case to case.

23. Moreover, although, a finding of fact can be interfered

with when it is perverse, but, it is also trite that where the

courts below have ignored the weight of preponderating

circumstances and allowed the judgment to be influenced

by inconsequential matters, the High Court would be

justified in considering the matter and in coming to its

own independent conclusion. (See Madan

Lal v. Gopi [(1980) 4 SCC 255] .)

24. The High Court shall also be entitled to opine that a

substantial question of law arises for its consideration

when material and relevant facts have been ignored and

legal principles have not been applied in appreciating the

evidence. Arriving at a decision, upon taking into

consideration irrelevant factors, would also give rise to a

substantial question of law. It may, however, be different

that only on the same set of facts the higher court takes a

different view. (See Collector of Customs v. Swastic

Woollens (P) Ltd. [1988 Supp SCC 796 : 1989 SCC (Tax)

67] and Metroark Ltd. v. CCE [(2004) 12 SCC 505] .)

25. Even in a case where evidence is misread, the High

Court would have power to interfere. (See W.B.

Electricity Regulatory Commission v. CESC Ltd. [(2002)

8 SCC 715] and also Commr. of Customs v. Bureau

Veritas [(2005) 3 SCC 265] .)

26. In Dutta Cycle Stores v. Gita Devi Sultania [(1990) 1

SCC 586] this Court held : (SCC p. 587, para 4)

‘4. Whether or not rent for the two months in question

had been duly paid by the defendants is a question of

fact, and with a finding of such fact, this Court does not

ordinarily interfere in proceedings under Article 136 of

the Constitution, particularly when all the courts below

reached the same conclusion. But where the finding of

fact is based on no evidence or opposed to the totality

Civil Appeal Nos. 5023-5024 of 2024 Page 84 of 168

of evidence and contrary to the rational conclusion to

which the state of evidence must reasonably lead, then

this Court will in the exercise of its discretion intervene

to prevent miscarriage of justice.’

(See also P. Chandrasekharan v. S. Kanakarajan [(2007)

5 SCC 669] .)”.

(emphasis supplied)

Therefore, what would constitute a substantial question of law would differ

in each case. When material and relevant facts have been ignored and legal

principles have not been applied while appreciating the evidence, a substantial

question of law can be said to have arisen. Additionally, even in a case where

evidence is misread, the power to interfere under Section 100 would exist.

90. In our considered view the impugned order of the NCLAT directing the SRA

to adjust the PBG of Rs. 150 Crore against the first tranche payment of Rs.

350 Crore was in flagrant disregard of the order of this Court dated

18.01.2023, the terms of the Resolution Plan and established law. Such an

order was perverse for having not properly considered several material and

relevant facts and misreading evidence as well. Furthermore, the non-infusion

and payment of funds in compliance with the applicable laws and the terms of

the Resolution Plan had led to circumstances causing a failure of the

Resolution Plan. We have no doubt in our mind that the NCLAT acted

contrary to the settled legal principles and went to the extent of drawing wrong

Civil Appeal Nos. 5023-5024 of 2024 Page 85 of 168

inferences from proved facts while deciding the matter. This itself justifies the

examination of various issues in exercise of the jurisdiction afforded to us

under Section 62 of the IBC, 2016.

i. Whether the Performance Bank Guarantee (PBG) could have been

adjusted against the first tranche payment which was to be made

under the Resolution Plan, within 180 days from the Effective Date, in

contravention of the order of this Court dated 18.01.2024, the terms of

the Resolution Plan and the provisions of law?

a. Whether the Conditions Precedent were fulfilled by Respondent

No.1/SRA and the Effective Date was fixed at 20.05.2022?

91. Clause 7.6.1 of the Resolution Plan details five Conditions Precedent that have

to be fulfilled by the SRA. They are: - (a) Validation of AOC, (b) Approval of

Business Plan, (c) Slot Allotment Approval, (d) International Traffic Rights

Clearance, and (e) Demerger of AGSL. Of the five Conditions Precedent that

find mention under Clause 7.6.1 of the Resolution Plan, the Appellants have

only disputed the fulfilment of three Conditions Precedent i.e., Validation of

AOC, Slots Allotment Approval and International Traffic Rights Clearance.

According to Clause 7.6.2 of the Resolution Plan, the date of fulfillment of all

the Conditions Precedent as stated in Clause 7.6.1 would be the Effective Date

Civil Appeal Nos. 5023-5024 of 2024 Page 86 of 168

for the purposes of the Resolution Plan. A failure to fulfil the Conditions

Precedent within a maximum of 270 days from the date of approval of the

Resolution Plan would lead to an automatic withdrawal of the Resolution Plan

as per Clause 7.6.4.

92. On 22.06.2021, the NCLT had given its imprimatur to the Resolution Plan that

was submitted by the SRA and this was the Approval Date i.e., “Y” as per the

Implementation Schedule set out under Clause 7.7 of the Resolution Plan. The

SRA had to fulfil the five Conditions Precedent within a period of 90 days,

that was extendable to an additional 180 days i.e., 270 days in total. This

period expired on 22.03.2022. However, the same was extended vide order

dated 11.04.2022 by the NCLT until 25.05.2022, by allowing an exclusion of

65 days.

93. Upon receiving the AOC from the relevant authorities on 20.05.2022 i.e.,

within the extended time period as allowed by the NCLT, the SRA asserted

that the Effective Date had been achieved. The SRA had approached the

NCLT seeking a declaration from the Tribunal that all the Conditions

Precedent have been met and that the SRA be allowed to begin the

implementation of the Resolution Plan. Vide order dated 13.01.2023, the

NCLT held that all the Conditions Precedent had indeed been met and that

20.05.2022 would be considered as the Effective Date for the purposes of

Civil Appeal Nos. 5023-5024 of 2024 Page 87 of 168

implementation of the Resolution Plan. The findings of the NCLT in the

aforesaid order are reproduced hereinbelow:

“Findings:

122. […] However, having considered the rival submissions

and on perusal of record with regards to satisfactory

compliance of conditions precedent (CPs) it is noted that

there is no dispute so far as satisfactory compliance of CPs

at serial no. (i) and (v) as per approved plan i.e.:- (i)

Validation of Air Operator Certificate by Directorate

General of Civil Aviation (DGCA) and Ministry of Civil

Aviation (MoCA) and (v) Approval of demerger of ground

handling business into all capital AGSL.

In this background we have thus considered if the remaining

three CPs are duly complied with by the applicant or

otherwise.

123. As regards to CP No. 2 i.e. Submission and approval of

business plan to DGCA and MoCA: The business plan was

submitted to above Authorities to fulfil compliance of

DGCA’s Show Cause Notice (SCN) to CD of April 2019.

SCN states that Air Operator Certificate will be issued after

MoCA approves the business plan. Thus, with issuance of Air

Operator Certificate, it is implied that the business plan has

been approved. Even otherwise, guidelines for issuance of

Air Operator Certificate being CAP 3100 clearly states that

the DGCA will review the detailed business plan of the

Applicant before issuance of Air Operator Certificate and

with issuance of Air Operator Certificate there is implied

approval of MoCA. In the background of above we find that

this CP is satisfactorily complied with the issuance of AOC.

124. As regards to CP No. 3 i.e. Slots Allotment Approval: It

is noted that plan approval order of this Tribunal dated 22

nd

June, 2021 stipulates that no historic slots will be granted to

Corporate Debtor or SRA. Admittedly, there is no challenge

to this order thereby accepting the fact that old slot cannot

be reinstated. Accordingly, this CP needs to be read with

plan approval order, where Corporate Debtor shall be

provided with such slots for which it applies. There is no

Civil Appeal Nos. 5023-5024 of 2024 Page 88 of 168

dispute that slots for which SRA applied were granted to

them by the concerned Competent Authority including the

slots in Delhi and Mumbai, on settling the old dues and as

such it cannot be considered as non-allotment of slots, as

SRA has received the slots it requested for in compliance

with plan approval order. The SRA cannot get all previous

slots as this condition needs to be read with plan approval

order of this Tribunal. In that view of the matter, above CPs

is also found to be Satisfactorily complied with.

125. As regards to CP no. 4: International Traffic Right

Clearance: On perusal of the plan approval order dated

22nd June, 2021, it is found that no blanket approval can be

granted upfront to the SRA as it has to approach the

concerned authorities for grant of such approval as per

applicable laws. As already stated above, the plan approval

order has reached its finality, thus, accepting the fact that all

the approval issued upfront cannot be reinstated.

Accordingly, this condition precedent needs to be read with

plan approval order. Even otherwise there is no dispute that

under the approved plan, SRA has to re-commence with

operation of six aircrafts. The International Traffic Rights

clearance is required to be obtained in compliance with the

applicable laws which stipulates that minimum twenty

aircrafts are required to be deployed before applying for

such clearance. In view of this, we find that this condition

cannot be satisfied upfront and needs to be satisfied in

compliance with applicable laws i.e., after the SRA has

twenty aircrafts in operation which can only be achieved

once the operation is re-commenced successfully.

Accordingly, this condition can only be fulfilled after the

SRA/Applicants re-commences its business and not prior to

its commencement.

It goes without saying that plan approved by this Tribunal

has to be implemented without any modification much less

than on satisfaction of any other undertaking and thus, the

effective date and completion date of condition precedent

under the plan shall have to be read as 20th May, 2022.

126. In the background of above facts and for the reasons

stated above we hold that in addition to CPs (I) & (V) which

Civil Appeal Nos. 5023-5024 of 2024 Page 89 of 168

are admittedly complied, remaining CPs (II), (III), (IV) are

also duly complied.”

94. During the period when the aforesaid order of the NCLT was passed, the SRA

possessed a valid AOC and therefore, there was no dispute pertaining to this

Condition Precedent. With respect to the Slot Allotment Approval, the NCLT

observed that although the historic slots which were available to the Corporate

Debtor could not be obtained by the SRA, yet the slots for which the SRA had

applied were granted to it by the concerned authorities upon settling the old

dues and as such, this could not be considered as non-allotment of slots.

Therefore, this Condition Precedent was found to be satisfactorily complied

with. As regards the Condition Precedent on obtaining International Traffic

Rights Clearance, the applicable law required a minimum of 20 aircrafts to be

deployed before applying for such a clearance. However, under the approved

Plan, the SRA had to re-commence with the operations with only six aircrafts.

It was, therefore, held that this Condition Precedent could not have been

satisfied upfront and could only be satisfied once the operations of the

Corporate Debtor had commenced successfully. With such observation, this

Condition Precedent was also found to be duly complied with. The NCLT

noted that the plan which was approved vide the Plan approval order dated

22.06.2021 had to be implemented without any modification and thus the

Civil Appeal Nos. 5023-5024 of 2024 Page 90 of 168

Effective Date i.e., the date of completion of the Conditions Precedent under

the Resolution Plan should be read as 20.05.2022.

95. The Appellants filed a statutory appeal against the order of the NCLT dated

13.01.2023 before the NCLAT and also sought a stay on the same. However,

the grant of stay was declined by the NCLAT on 03.03.2023. This should have

closed the debate on the understanding between the parties that the Effective

Date was set in stone.

96. The NCLAT also vide its impugned order held that the SRA had fulfilled all

the required Conditions Precedent. On Slot Allotment Approval, it was held

that 48 slots have been obtained by the SRA for the recommencement of

operations. The contention of the Appellants that airport charges are required

to be paid upfront for obtaining such slots was rejected since the NCLAT was

of the opinion that the payment towards airport charges, which are a part of

CIRP costs, must be made as per the terms of the Resolution Plan when its

implementation had begun. Therefore, it was declared that the Condition

Precedent on Slot Allotment Approval was fulfilled despite the non-payment

of Airport Dues by the SRA. On International Traffic Rights Clearance, the

NCLAT echoed the opinion of the NCLT that it could not have obtained this

clearance without commencing and amplifying the operations of the

Corporate Debtor. It was observed that this Condition Precedent should not

Civil Appeal Nos. 5023-5024 of 2024 Page 91 of 168

come in the way of the implementation of the Resolution Plan. As regards the

AOC, it was contended by the Appellants that the same had lapsed after

03.09.2023 and no extension was granted by the DGCA thereafter. However,

the NCLAT was of the view that the AOC was valid on the date when the

SRA had approached the NCLT for a declaration that the Conditions

Precedent were fulfilled and also when the order dated 13.01.2023 of the

NCLT was passed. The expiry of the validity period of the AOC during the

pendency of the Company Appeal was not considered sufficient grounds to

hold that the Condition Precedent was not fulfilled. The NCLAT while

reaffirming that all the Conditions Precedent were satisfactorily fulfilled

observed that there was no infirmity in the order of the NCLT dated

13.01.2023. The NCLAT further directed the SRA to make an application for

the re-issuance of the AOC within 90 days from the date of its order i.e., by

12.06.2024.

97. The nature of the Conditions Precedent laid out under the Resolution Plan

were such that several of them could not be fulfilled before the

operationalization of the Corporate Debtor. The assertion that the Effective

Date would kick in only upon fulfilment of all the Conditions Precedent and

since the Appellants had challenged the fulfilment of the Conditions

Precedent, such a date could not be said to have yet arrived, cannot be

accepted. The order of the NCLT dated 22.06.2021 approving the Resolution

Civil Appeal Nos. 5023-5024 of 2024 Page 92 of 168

Plan had fixed the Effective Date as the 90

th

day from the Approval date,

which was subject to a maximum extension of another 180 days. It

consciously removed the ambiguity that plagued Clauses 7.6.2 and 7.6.4

respectively for the precise reason & with the idea that the Effective Date

should not be endlessly postponed. Agreeing to such an erroneous proposition

would mean that the Effective Date would never be achieved as long as the

parties are litigating before the Courts and the SRA would be absolved of

taking the implementation under the Resolution Plan further. The NCLAT

had declined to stay the order of the NCLT dated 13.01.2023 which held that

all the Conditions Precedent were fulfilled. Further, on a perusal of the

impugned order, it is evident that the NCLT and NCLAT rendered concurrent

findings of fact that the SRA had fulfilled all the Conditions Precedent. In

other words, it was repeatedly declared by different fora that the Effective

Date was frozen on 20.05.2022 and the obligation of the SRA to implement

the Resolution Plan was absolute. All steps necessary should have been

undertaken by the SRA, at least post the impugned order of the NCLAT dated

12.03.2024. To contend that its hands were tied since the Conditions Precedent

were still being challenged before this Court is nothing but a reflection of the

mala fide intention on the part of the SRA to not fulfil its obligations in

accordance with the Resolution Plan under the garb of pendency of litigation.

Such an undue delay cannot be permitted, especially in light of the intention

Civil Appeal Nos. 5023-5024 of 2024 Page 93 of 168

of the IBC, 2016 to ensure a successful and time-bound revival of the

Corporate Debtor. This places a higher obligation on the SRA to act in an

expeditious manner.

b. Whether the NCLAT could have directed the Performance Bank

Guarantee (PBG) to be adjusted against the first tranche payment

which was to be made within 180 days of the Effective Date?

98. There is no dispute to the fact that the Effective Date was frozen on

20.05.2022. Therefore, as per Clause 6.3.1(g) on the “Infusion of Funds and

Timelines”, and Serial No.11 under Clause 7.7, the first tranche payment of

Rs. 350 Crore had to be made by the SRA, upfront, within a period of 180

days from the Effective Date i.e., 20.05.2022. As per the Resolution Plan, this

180-day timeline otherwise would have expired on 16.11.2022. Several

extensions were granted to the SRA to infuse this amount, at different stages

of this litigation, by the NCLT, the NCLAT and this Court as well - First, by

the NCLT vide order dated 13.01.2023, by which the timeline for infusion of

first tranche payment was extended till 15.05.2023; Secondly, by the NCLAT

vide order dated 26.05.2023, where the timeline of 180 days was further

extended up to 31.08.2023; Thirdly, again by the NCLAT vide order dated

28.08.2023, where the timeline of 180 days was extended up to 30.09.2023;

Civil Appeal Nos. 5023-5024 of 2024 Page 94 of 168

and Fourthly, by this Court vide order dated 18.01.2024, whereby the time of

180 days for infusion was extended up to 31.01.2024.

I. The adjustment of the PBG was impermissible under the terms of the

Resolution Plan read with Regulation 36B(4A) of the 2016

Regulations.

99. It is the case of the SRA that as per Clause 6.4.4 on the “Treatment of

Financial Creditors” and the table adduced under the heading “Summary of

payment and security package”, the PBG of Rs. 150 Crore could have been

adjusted against the payment of the first tranche. It was submitted that in the

last column of the table, the “Date of Release of Security” is provided. In the

very first head in the column on date of release of security, the expression

“PBG adjusted” has been mentioned against the first tranche of cash payment

to be made to the Financial Creditors. Further, in the explanation given to the

said table under Clause 6.4.4(a)(i), against the heading “Date of Release of

Security”, there is no mention of the PBG while the other two types of security

find a mention. It was submitted that the only good reason for this exclusion

was the understanding that the PBG was adjustable against the obligation of

the SRA towards payment of the first tranche. Further, it is the case of the

SRA that since a revolving security package was agreed to under Clause 6.4.4,

other types of security were envisioned for the subsequent tranches of

Civil Appeal Nos. 5023-5024 of 2024 Page 95 of 168

payment and therefore, no issue could have been raised in adjusting the PBG

towards the first tranche. However, we find it extremely difficult to agree with

the stance of the SRA for multiple reasons which are detailed below.

100. The RFRP under Clause 3.13 deals with the Performance Security to be

given by the SRA. Clause 3.13.1 provides that the SRA shall furnish or cause

to be furnished, an unconditional and irrevocable PBG, of an amount of Rs.

150 Crore in favor of the SBI within 7 days of being declared as the SRA.

Clause 3.13.2 provides that the PBG shall be valid, till the later of (a) a period

of 180 days from the date of the PBG; and (b) the date of completion of the

implementation of the Resolution Plan, as determined by the RP and the CoC.

Clause 3.13.7 provides that the PBG can be invoked or appropriated at any

time by the SBI, without any reference to the SRA, upon the occurrence of

any of the following conditions;

i. If any of the conditions under the Letter of Intent or the Resolution Plan

are breached;

ii. If the SRA fails to re-issue or extend the PBG in accordance with the terms

of the RFRP; or

iii. Failure of the SRA to implement the Resolution Plan to the satisfaction of

the CoC, and in accordance with the terms of the Resolution Plan.

Civil Appeal Nos. 5023-5024 of 2024 Page 96 of 168

Clause 3.13.8 provides that the PBG shall be returned to the SRA within a

period of 7 days, upon 100% completion of the implementation of the

Resolution Plan by the SRA. Finally, Clause 3.13.9 states in categorical terms

that, the PBG shall not be set-off against or used as part of the consideration

that the SRA proposes to offer in relation to the Corporate Debtor, even if

expressly indicated as such by the SRA in the Resolution Plan.

101. It is of vital importance that the aforementioned clauses of the RFRP are

read conjointly with Clauses 7.3 and 9.4 of the Resolution Plan. Clause 7.3 of

the Resolution Plan deals with the “Compliance with respect to Regulation

36B(4A)” and states that the SRA undertakes to provide the PBG as per the

terms of the RFRP in favor of the SBI within 7 days of it being declared as the

SRA. Clause 9.4 of the Resolution Plan is titled “Implementation” and states

that “the performance guarantee provided by the Resolution Applicant can be

invoked in accordance with the terms of the RFRP”. Therefore, it is as clear

as a noonday that the terms of the RFRP, particularly in relation to the

performance security i.e., PBG, stood incorporated in the Resolution Plan by

way of Clauses 7.3 and 9.4 respectively of the Resolution Plan.

102. Furthermore, in the Covering Letter adduced with the Resolution Plan, the

SRA stated as thus:

Civil Appeal Nos. 5023-5024 of 2024 Page 97 of 168

“4. We hereby undertake that we, and our Representatives,

shall at all times, be in compliance with the provisions of the

RFRP, the Non-Disclosure Agreement, the IB Code and the

CIRP Regulations.

xxx xxx xxx

c. Acceptance

We hereby unconditionally and irrevocably agree and accept

the terms of the RFRP and that the decision made by the

Resolution Professional, CoC and/or the Adjudicating

Authority in respect of any matter with respect to, or arising

out of, the RFRP and the Resolution Plan Submission

Process shall be binding on us…

xxx xxx xxx

10. We confirm that we have not taken any deviations so as

to be deemed non-responsive with respect to the provisions

of the RFRP, the IB Code and the CIRP Regulations.”

(emphasis supplied)

A bare reading of the above also strengthens the conclusion that the SRA has

to remain compliant with the terms of the RFRP, at all times, in addition to

being obedient to the terms of the Resolution Plan. Therefore, to say that the

RFRP was merely a wish list of the CoC which was informed to the applicants

at the time of inviting plans is incorrect, to say the least. The provisions of the

RFRP, especially those provisions related to the Performance Security or

PBG, were binding on the SRA.

103. The learned counsel for the SRA tried to place reliance on one another

Clause of the Resolution Plan i.e., Clause 6.4.12 which stated that the PBG

Civil Appeal Nos. 5023-5024 of 2024 Page 98 of 168

would bring financial flexibility and help the SRA to advance certain committed

payments. This according to the SRA is an affirmation of the fact that the PBG

could have been adjusted against the first tranche payment. However, it must be

pointed out that Clause 6.4.12 was amended vide an Addendum to the

Resolution Plan dated 02.10.2020. The erstwhile Clause 6.4.12 of the

Resolution Plan reads thus:

“6.4.12. Request for the consideration of the CoC - The

Resolution Applicant shall provide a performance security

bank guarantee for a total sum of Rs. 47.5 Crores, which will

bring financial flexibility for the Resolution Applicant and

help the Resolution Applicant advance the committed

payments and achieve its goal of re-commencing the

operations of Jet Airways at the earliest.”

However, the aforesaid Clause 6.4.12 of the Resolution Plan was deleted in its

entirety and replaced with the following:

“6.4.12. Request for the consideration of the CoC - As

required under the RFRP, the Resolution Applicant shall

provide the performance security bank guarantee (“PBG”)

for a total sum of Rs. 150 Crores. The PBG will be provided

in two parts, with the first PBG of Rs. 47.5 Crores provided

within 7 (seven) days from the date of receipt of LOI; and

PBG for the remaining sum of Rs. 102.5 Crores provided on

the Effective Date.”

A reading of the amended Clause 6.4.12 of the Resolution Plan indicates that

the parties had mutually agreed to do away with the phrase “which will bring

financial flexibility for the Resolution Applicant and help the Resolution

Civil Appeal Nos. 5023-5024 of 2024 Page 99 of 168

Applicant advance the committed payments and achieve its goal of re-

commencing the operations of Jet Airways at the earliest”. What can be

plainly deduced from such a deletion is that the PBG cannot be used by the

SRA to advance any payments that are required to be paid under the scheme

of the Resolution Plan. This, additionally, cements the idea that the PBG could

not be adjusted towards any consideration or payment which had to be made

by the SRA. Such an amendment in Clause 6.4.12 only brought the Resolution

Plan further in line with the terms of the RFRP.

104. An adjustment of the PBG against the first tranche payment would also be

in violation of Regulation 36B(4A) of the 2016 Regulations which was

inserted by Notification No. IBBI/2019-20/GN/REG040 dated 24.01.2019.

The same is reproduced hereinbelow:

“(4A) The request for resolution plans shall require the

resolution applicant, in case its resolution plan is approved

under sub-section (4) of section 30, to provide a performance

security within the time specified therein and such

performance security shall stand forfeited if the resolution

applicant of such plan, after its approval by the Adjudicating

Authority, fails to implement or contributes to the failure of

implementation of that plan in accordance with the terms of

the plan and its implementation schedule.

Explanation I. – For the purposes of this sub-regulation,

“performance security” shall mean security of such nature,

value, duration and source, as may be specified in the

request for resolution plans with the approval of the

committee, having regard to the nature of resolution plan

and business of the corporate debtor.

Civil Appeal Nos. 5023-5024 of 2024 Page 100 of 168

Explanation II. – A performance security may be specified in

absolute terms such as guarantee from a bank for Rs. X for

Y years or in relation to one or more variables such as the

term of the resolution plan, amount payable to creditors

under the resolution plan, etc.”

(emphasis supplied)

105. Regulation 36B(4A) states that the performance security shall stand

forfeited if the resolution applicant fails to implement or contributes to the

failure of implementation of the plan, in accordance with the terms of the

Resolution Plan and its implementation Schedule. Therefore, the PBG had to

be kept alive until the complete implementation of the Resolution Plan as per

Regulation 36B(4A) as well. This is also what is provided under Clauses

3.13.2 and 3.13.8 of the RFRP respectively wherein the PBG was required to

be kept alive and was to be returned to the SRA only upon 100% completion

of the implementation of the Resolution Plan. This binding nature of the RFRP

was transferred onto the Resolution Plan through Clauses 7.3 and 9.4

respectively of the Resolution Plan.

106. The NCLAT in one of its orders i.e., the order dated 26.05.2023, had

restrained the Appellants from invoking the PBG without the leave of the

NCLT. While saying so, the following observations were made;

“19. When the Resolution Plan of the Corporate Debtor has

received approval up to Hon’ble Supreme Court and the

Monitoring Committee is constituted under the Plan to

oversee implementation, the Monitoring Committee has to

Civil Appeal Nos. 5023-5024 of 2024 Page 101 of 168

act as a facilitator for implementation of the Resolution Plan

instead of finding fault and taking steps, which does not

facilitate the implementation, rather delay the

implementation. There is no doubt that Performance Bank

Guarantee can be invoked by the MC Lenders, but the said

invocation can only take place when SRA has failed to

implement the Plan. Present is a case where directions have

been issued to both MC Lenders and SRA to implement the

Plan and the event of failure of the Plan has not yet arrived.

When the Adjudicating Authority has directed on 13.01.2023

to take steps towards the implementation of the Plan and

which order was not been stayed by this Tribunal on

03.03.2023, the steps ought to have been taken by the MC

Lenders in furtherance of the implementation. The time has

not arrived for invoking the Performance Bank Guarantee.

When the SRA is ready to undertake to perform its

obligations under the Plan, we are of the view that

Performance Bank Guarantee given by the SRA cannot be

permitted to the invoked by the MC Lenders. MC Lenders

instead of threatening to invoke Performance Bank

Guarantee, should take steps, which may help

implementation of the Plan and to achieve the objective of

Resolution Plan. The Resolution Plan has been approved

with the intent and purpose to revive the Corporate Debtor,

which revival is in accordance with objective and purpose of

the IBC. We again reiterate that efforts by MC Lenders and

SRA should be coordinated for revival of the Corporate

Debtor, so as to start its operations at an early date, which

is in the interest of all stake holders as well as in the interest

of Corporate Debtor.

20. In view of the aforesaid, we direct that MC Lenders shall

not invoke the Performance Bank Guarantee in the facts of

the present case as on date, and for invocation, if any, MC

Lenders may take leave of the Adjudicating Authority. The

IA Nos.2159-2160 is disposed of accordingly.”

(emphasis supplied)

107. A careful reading of the aforesaid order of the NCLAT reflects that the

NCLAT had itself conceded to the position that the Appellants have a right to

Civil Appeal Nos. 5023-5024 of 2024 Page 102 of 168

invoke the PBG in a situation where the SRA had failed to implement the

Resolution Plan. This is again in line with the intention under Regulation

36B(4A). Therefore, even in light of the NCLAT’s own order dated

26.05.2023, it does not follow that the PBG could have been adjusted by the

SRA, mid-implementation, against its payment obligation.

108. The NCLAT in its order dated 28.08.2023 dealt with the issue of

adjustment of PBG against the first tranche payment in light of the offer made

in the Lender’s Affidavit dated 16.08.2023 and made certain observations

regarding Regulation 36B(4A) of the 2016 Regulations. The same are as

follows:

“26. When we look to the Regulation 36B (4A) it is clear that

the provision provides that RFRP shall require Resolution

Applicant to provide Performance Bank Guarantee within

the time specified. Sub-Section 4A provides that if Resolution

Applicant after approval fails to implement Performance

Security it shall stand forfeited. Present is a case, where

Performance Security has already been provided in

compliance of sub- Regulation 4A and present is not a case

that any power to forfeit the Performance Bank Guarantee

to be exercised under sub-Regulation (4A). On Explanation

I, attention of the Court was drawn by Learned Counsel for

SRA, which indicates that the performance security which is

contemplated, can be of such nature, value, duration and

source as may be specified. Thus, Performance Security can

be of a particular duration and when the Resolution Plan

provides release of security at the time of first tranche of

payment of Rs. 350 Crores, no exception can be taken to

adjustment of the Performance Bank Guarantee. The request

of SRA to adjust Performance Bank Guarantee of Rs. 150

Civil Appeal Nos. 5023-5024 of 2024 Page 103 of 168

Crores is thus according to Clause 6.4.4 of the Resolution

Plan on which no exception can be taken.

27. Submission was made by Learned Sr. Counsel for the

Appellant that performance Bank Guarantee has to be

maintained till the completion of the plan. The summary of

payment and security package as contained in the table

indicate that there are large numbers of other securities

which are to be continued. The securities in the last column

which are mortgaged over three Dubai Properties are to be

released on year 5 or on complete payment whichever is

earlier. The plan thus provides for adequate securities to

ensure the payment hence the adjustment of Performance

Bank Guarantee in the first tranche of payment cannot be

said to be against the Resolution Plan. We thus are of the

view that prayer made by the Applicant in the Application in

Prayer (a) is to be allowed.”

(emphasis supplied)

109. A bare perusal of the above observations would indicate that the NCLAT

proceeded on an incorrect understanding of Regulation 36B(4A) and its First

Explanation. Regulation 36B(4A) does not state that if the Resolution

Applicant, after approval, fails to implement the PBG, then it shall stand

forfeited. Instead, what the Regulation actually states is that the performance

security shall stand forfeited, if the resolution applicant of such a plan, after

its approval by the Adjudicating Authority, “fails to implement or contributes

to the failure of implementation of that plan in accordance with the terms of

the plan and its implementation schedule”. It is not the failure to implement

the performance security i.e., the PBG, that is dealt with in this Regulation but

the consequence of the failure to implement “the Plan” by the SRA.

Civil Appeal Nos. 5023-5024 of 2024 Page 104 of 168

110. Further the order dated 28.08.2023 proceeds to interpret Explanation I to

Regulation 36B(4A) and states that since according to Explanation I, the

performance security can be of a particular duration, the Resolution Plan can

provide for the release of security at the time of the first tranche payment of

Rs. 350 Crore and no exception can be taken to the adjustment of the PBG.

However, what the NCLAT failed to take notice of is that under Explanation

I to Regulation 36B(4A), the performance security shall mean security of such

nature, value, duration and source, as may be specified “in the request for

resolution plans”. The duration of the performance security that has been

specified in the RFRP is given under Clauses 3.13.2 and 3.13.8 of the RFRP

which categorically states that the PBG shall be kept alive until the Resolution

Plan has been completely implemented. This is the duration which is referred

to in Explanation I to Regulation 36B(4A).

111. Now, if the intention under the RFRP, the Resolution Plan (under Clauses

7.3 and 9.4) and Regulation 36B(4A) was that the PBG had to be kept alive

till the completion of implementation of the Resolution Plan by the SRA and

that it cannot be set-off against any payment obligation, then how do we

reconcile such an intention with the expression “PBG adjusted” mentioned

under Clause 6.4.4 of the Resolution Plan? As mentioned above, Clauses 7.3

and 9.4 respectively of the Resolution Plan incorporated the terms of the

Civil Appeal Nos. 5023-5024 of 2024 Page 105 of 168

RFRP into the Resolution Plan. Clause 3.13.9 of the RFRP states that the PBG

shall not be set off against any payment or consideration which is to be made

by the SRA, even if expressly provided so under the Resolution Plan. Clause

6.4.4 is quite ambiguous in its construction regarding the question whether the

PBG can be specifically adjusted against the first tranche payment. Although

in the Summary of Payments and Security Package, under the column titled

“Date of release of security”, the expression “PBG adjusted” exists, yet Clause

6.4.4(a)(i) which furnishes some additional clarity on the Summary of

Payments and Security Package provides no mention of the PBG under the

heading “Date of release of Security”, while the other two forms of security

i.e., the BKC property and Dubai property No.1 are mentioned. The argument

of the counsel for the Respondent is that this omission indicates that the PBG

would be adjusted under the first tranche payment. However, in our

considered opinion irrespective of whether Clause 6.4.4 expressly or

impliedly provided for the PBG to be adjusted, such a provision would create

a dissonance with Clause 3.13.9 of the RFRP which has also been made

binding on the SRA through Clauses 7.3 and 9.4 respectively of the Resolution

Plan. Therefore, such an adjustment should not be allowed in the facts of the

present case.

Civil Appeal Nos. 5023-5024 of 2024 Page 106 of 168

II. The Lender’s Affidavit dated 16.08.2023 did not impose conditions

which were different from the terms of the Resolution Plan.

112. It is the case of the Appellants that Serial No.11 under Clause 7.7.1 read

with Clause 6.1.3(g) evidences that the SRA had to infuse Rs. 350 Crore “in

cash” and it was for this reason alone that Para 8(a) of the Lender’s Affidavit

required the infusion of Rs. 350 Crore to be done in cash by 31.08.2023. It

was submitted that such a requirement for cash payment flowed directly from

the Resolution Plan under which an adjustment of the PBG was impermissible

and not just out of the Lender’s Affidavit dated 16.08.2023. This is because

the Lender’s Affidavit has not and cannot impose any condition over and

above the one laid under the Resolution Plan.

113. On the other hand, the Respondents vehemently submitted that it was only

the Lender’s Affidavit dated 16.08.2023 which stipulated the condition that

Rs. 350 Crore had to be infused in cash by 31.08.2023, while the Resolution

Plan, under Clause 6.4.4 allowed for the payment of Rs. 200 Crore in cash and

Rs. 150 Crore through adjusting the PBG. In other words, they argued that the

conditions envisaged in the Lender’s Affidavit were different from those

stipulated in the Resolution Plan.

Civil Appeal Nos. 5023-5024 of 2024 Page 107 of 168

114. However, the intent of the legislature is very clear on the aspect that once

a Resolution Plan is approved by the Adjudicating Authority i.e., the NCLT,

it becomes binding on all the stakeholders involved in the Resolution Plan.

Section 31(1) of the IBC, 2016 reads as thus:

“31. (1) If the Adjudicating Authority is satisfied that the

resolution plan as approved by the committee of creditors

under sub-section (4) of section 30 meets the requirements

as referred to in sub-section (2) of section 30, it shall by

order approve the resolution plan which shall be binding on

the corporate debtor and its employees, members,

creditors,[including the Central Government, any State

Government or any local authority to whom a debt in respect

of the payment of dues arising under any law for the time

being in force, such as authorities to whom statutory dues

are owed,] guarantors and other stakeholders involved in

the resolution plan.”

(emphasis supplied)

115. This Court in Ebix Singapore Private Limited v. Committee Of Creditors

of Educomp Solutions Limited and Another reported in (2022) 2 SCC 401

was faced with the issue whether withdrawals or modifications by successful

resolution applicants were permissible under the IBC, 2016 i.e., whether a

resolution applicant is entitled to withdraw or modify its Resolution Plan, once

it has been submitted by the Resolution Professional to the Adjudicating

Authority and before it is approved by such authority under Section 31(1) of

the IBC, 2016. It was unequivocally held that, based on the plain terms of the

IBC, 2016, the Adjudicating Authority lacks the power to allow the

Civil Appeal Nos. 5023-5024 of 2024 Page 108 of 168

withdrawal or modification of the Resolution Plan by a successful resolution

applicant or to give effect to any such clauses in the Resolution Plan. The

relevant observations made are reproduced hereinbelow:

“164. The approval of the adjudicating authority under

Section 31(1) IBC has the effect of making the resolution

plan binding on all stakeholders. These stakeholders include

the employees of the corporate debtor whose terms of

employment would be governed by the resolution plan, the

Central and State Governments who would receive their tax

dues on the basis of the terms of the resolution plan and local

authorities to whom dues are owed. These stakeholders are

not direct participants in the CIRP but are bound by its

consequence by virtue of the approval of the resolution plan,

under Section 31(1) IBC. Section 31(1) ensures that the

resolution plan becomes binding on all stakeholders after it

is approved by the adjudicating authority. The language of

Section 31(1) cannot be construed to mean that a resolution

plan is indeterminate or open to withdrawal or modification

until it is approved by the adjudicating authority or that it is

not binding between the CoC and the successful resolution

applicant. Regulation 39(4) of the CIRP Regulations

mandates that the RP should endeavor to submit the plan at

least fifteen days before the statutory period of the CIRP

under Section 12 is due to expire along with a receipt of a

PBG and a compliance certificate as Form H. It is pertinent

to note that sub-section (3) to Section 12 mandates that the

CIRP process, including legal proceedings, must be

concluded within 330 days. This three-hundred-and-thirty-

day period can be extended only in exceptional

circumstances, if the process is at near conclusion and serves

the object of IBC, as held by a three-Judge Bench of this

Court in Essar Steel [Essar Steel (India) Ltd. (CoC) v. Satish

Kumar Gupta, (2020) 8 SCC 531 : (2021) 2 SCC (Civ) 443].

Therefore, after accounting for all statutorily envisaged

delays which the RP has to explain in its Form H and

otherwise through Regulation 40-B, the procedure envisages

a fifteen-day window between submission of resolution plan

and its approval or rejection by the adjudicating authority.

Civil Appeal Nos. 5023-5024 of 2024 Page 109 of 168

This clearly indicates that the statute envisages a certain

level of finality before the resolution plan is submitted for

approval to the adjudicating authority. Even the CoC is not

permitted to approve multiple resolution plans or solicit EoIs

after submission of a resolution plan to the adjudicating

authority, which would possibly be in contemplation if the

resolution applicant was permitted to withdraw from, or

modify, the plan after acceptance by the CoC. Regulation 36-

B(4-A) requires the furnishing of a performance security

which will be forfeited if a resolution applicant fails to

implement the plan. This is collected before the adjudicating

authority approves the plan. Notably, the Regulations also

direct forfeiture of the performance security in case the

resolution applicant “contributes to the failure of

implementation”, which could potentially include any

attempts at withdrawal of the plan.

xxx xxx xxx

172. Based on the plain terms of the statute, the adjudicating

authority lacks the authority to allow the withdrawal or

modification of the resolution plan by a successful resolution

applicant or to give effect to any such clauses in the

resolution plan. Unlike Section 18(3)(b) of the erstwhile

SICA which vested the Board for Industrial and Financial

Reconstruction with the power to make modifications to a

draft scheme for sick industrial companies, the adjudicating

authority under Section 31(2) IBC can only examine the

validity of the plan on the anvil of the grounds stipulated in

Section 30(2) and either approve or reject the plan. The

adjudicating authority cannot compel a CoC to negotiate

further with a successful resolution applicant. A rejection by

the adjudicating authority is followed by a direction of

mandatory liquidation under Section 33. Section 30(2) does

not envisage setting aside of the resolution plan because the

resolution applicant is unwilling to execute it, based on terms

of its own resolution plan.

xxx xxx xxx

222. If the legislature in its wisdom, were to recognise the

concept of withdrawals or modifications to a resolution plan

Civil Appeal Nos. 5023-5024 of 2024 Page 110 of 168

after it has been submitted to the adjudicating authority, it

must specifically provide for a tether under IBC and/or the

Regulations. This tether must be coupled with directions on

narrowly defined grounds on which such actions are

permissible and procedural directions, which may include

the timelines in which they can be proposed, voting

requirements and threshold for approval by the CoC (as the

case may be). They must also contemplate at which stage the

corporate debtor may be sent into liquidation by the

adjudicating authority or otherwise, in the event of a failed

negotiation for modification and/or withdrawal. These are

matters for legislative policy.

223. In the present framework, even if an impermissible

understanding of equity is imported through the route of

residual powers or the terms of the resolution plan are

interpreted in a manner that enables the appellants' desired

course of action, it is wholly unclear on whether a

withdrawal of a CoC-approved resolution plan at a later

stage of the process would result in the adjudicating

authority directing mandatory liquidation of the corporate

debtor. Pertinently, this direction has been otherwise

provided in Section 33(1)(b) IBC when an adjudicating

authority rejects a resolution plan under Section 31. In this

context, we hold that the existing insolvency framework in

India provides no scope for effecting further modifications

or withdrawals of CoC-approved resolution plans, at the

behest of the successful resolution applicant, once the plan

has been submitted to the adjudicating authority. A

resolution applicant, after obtaining the financial

information of the corporate debtor through the

informational utilities and perusing the IM, is assumed to

have analysed the risks in the business of the corporate

debtor and submitted a considered proposal. A submitted

resolution plan is binding and irrevocable as between the

CoC and the successful resolution applicant in terms of the

provisions of IBC and the CIRP Regulations. In the case of

Kundan Care, since both, the resolution applicant and the

CoC, have requested for modification of the resolution plan

because of the uncertainty over the PPA, cleared by the

ruling of this Court in Gujarat Urja [Gujarat Urja Vikas

Nigam Ltd. v. Amit Gupta, (2021) 7 SCC 209 : (2021) 4 SCC

Civil Appeal Nos. 5023-5024 of 2024 Page 111 of 168

(Civ) 1] , a one-time relief under Article 142 of the

Constitution is provided with the conditions prescribed in

Section K.2.”

(emphasis supplied)

116. In light of the aforesaid, it is clear that the existing insolvency framework

does not provide any scope for effecting further modifications or withdrawals

of the Resolution Plan approved by the CoC, at the behest of the successful

resolution applicant, once the plan has been submitted to the adjudicating

authority. The submitted Resolution Plan is binding and irrevocable as

between the CoC and the successful resolution applicant in terms of the

provisions of the IBC, 2016 and the 2016 Regulations as well. In other words,

once a CoC-approved resolution plan is submitted to the Adjudicating

Authority i.e., NCLT, it immediately becomes binding on the CoC and the

SRA, even if the Adjudicating Authority has not yet given its stamp of

approval on the same. While deciding so, this Court re-emphasized the object

under Section 31(1) of the IBC, 2016 and observed that once the Adjudicating

Authority has approved the plan under Section 31(1) of the IBC, 2016, the

Resolution Plan is binding on all the stakeholders including those stakeholders

who are not direct participants of the CIRP. Therefore, there is absolutely no

scope for modification of the terms of a Resolution Plan which has received

the imprimatur of the Adjudicating Authority, be it by the Adjudicating

Authority itself, the CoC or the SRA.

Civil Appeal Nos. 5023-5024 of 2024 Page 112 of 168

117. When the aforesaid is the position of law, and the NCLT had approved the

present Resolution Plan vide order dated 22.06.2021, the Resolution Plan was

immune to any modification or alteration whatsoever. Therefore, the

Appellants could have only proposed an offer under the Lender’s Affidavit

dated 16.08.2023 which stood true to the terms of the Resolution Plan

approved by the NCLT. They could not have created any deviations,

alterations or modifications of the terms of the Resolution Plan. It is in this

context that the submission of the SRA that, the Lender’s Affidavit required

an infusion of Rs. 350 Crore in cash, while the Resolution Plan allowed for

the payment of Rs. 200 Crore in cash and Rs. 150 Crore through adjustment

of the PBG, must be rejected. Both the Resolution Plan and the Lender’s

Affidavit dated 16.08.2023 reflected the same terms i.e., infusion “in cash” of

the first tranche payment of Rs. 350 Crore. In fact, even the date within which

the Lender’s Affidavit required Rs. 350 Crore to be infused in cash i.e.,

31.08.2023 was in compliance with the order dated 26.05.2023 passed by the

NCLAT granting the 2

nd

Implementation Extension. Therefore, no new terms

were cast on the SRA.

118. The fact that the Lender’s Affidavit did not impose any condition which

was different from that contemplated under the Resolution Plan, was also

understood by all the parties involved, including the SRA. This is evident from

Civil Appeal Nos. 5023-5024 of 2024 Page 113 of 168

the arguments put forth by the SRA, before the NCLAT and before this Court

respectively, which dealt with the issue of whether the adjustment of the PBG

was possible under the terms of the Lender’s Affidavit. The following were

the submissions made by the SRA in the order dated 28.08.2023 as recorded

by the NCLAT:

“20. Learned Sr. Counsel for the SRA has submitted that

approved Resolution Plan provides adjustment of

Performance Bank Guarantee towards first tranche of

payment whereas Learned Counsel for the Appellants has

referred to certain clauses of RFRP and also provisions of

Regulation 36B (4A) to support his submission that

performance bank guarantee cannot be permitted to be

invoked towards payment of first tranche.”

(emphasis supplied)

119. The submissions made by the SRA as recorded in the order of this Court

dated 18.01.2024 are as follows:

“18. The submission which has been urged on behalf of the

lenders has been opposed on behalf of the SRA by Mr.

Krishnendu Datta, senior counsel, on behalf of the SRA, it

has been submitted that:

(i) The Resolution Plan specifically contemplates the

adjustment of the PBG (originally of Rs. 47.5 crores,

subsequently enhanced to Rs. 150 crores). In support

of this submission, reliance has been placed on the

summary of payments and security package forming a

part of clause 6.4.4 of the Resolution Plan;

(ii) The SRA was in the first tranche required to pay an

amount of up to Rs. 185 crores against the creation of

securities, namely, (i) PBG of Rs. 47.5 crores; (ii)

BKC Property (if given); and (iii) Mortgage over

Dubai Property No 1 valued at over Rs. 100 crores. In

Civil Appeal Nos. 5023-5024 of 2024 Page 114 of 168

the last column of the table, it has been stipulated that

the securities would be released, as indicated;

(iii) The PBG was liable to be adjusted against the cash

payment of the first tranche of Rs. 185 crores;

(iv) No specific date for the release of the security in

relation to the PBG has been mentioned;

(v) Moreover, in respect of the second tranche comprising

of Rs. 195 crores, there was no requirement to furnish

any security in the form of a PBG;

(vi) The securities, in other words, were of a revolving

nature, but significantly on the release of the PBG

against a cash payment of Rs. 185 crores, the PBG is

not required to be renewed as a fresh security for the

following tranches; and …”

(emphasis supplied)

120. A perusal of the abovementioned would indicate that both the parties as

well as the NCLAT were ad idem on the fact that the terms imposed by the

Lender’s Affidavit dated 16.08.2023 were in pursuance of and similar to the

terms of the Resolution Plan. This is because, in order to take benefit of the

offer made in the Lender’s Affidavit, the SRA had repeatedly asserted that the

PBG should be allowed to be adjusted under the terms of the Resolution Plan

and as a consequence, such an adjustment must be allowed under the Lender’s

Affidavit as well. Even the NCLAT in its order dated 28.08.2023 had held that

the SRA could adjust the PBG of Rs. 150 Crore to take benefit of the offer of

the Lender’s Affidavit by relying on Clause 6.4.4 of the Resolution Plan which

provided for the summary of payments and security package.

Civil Appeal Nos. 5023-5024 of 2024 Page 115 of 168

121. Therefore, in our view the conditions imposed on the SRA under the

Lender’s Affidavit and the Resolution Plan were one and the same, the only

difference being that the Appellants had offered not to press issues relating to

the compliance of the Conditions Precedent and grant of

extensions/exclusions along with offering to withdraw the Company Appeal

and the Appeals pending before this Court.

122. The order of this Court dated 18.01.2024 must be seen & understood in the

aforesaid background. While the appeal before us had resulted from several

interim orders of the NCLAT, the question before us was whether the

adjustment of the PBG of Rs. 150 Crore was permissible under the Lender’s

Affidavit as well as the terms of the Resolution Plan, being one and the same.

We interpreted the term “infuse” as mentioned in the affidavit and under the

Resolution Plan, and arrived at the conclusion that it demonstrably meant

“payment in cash”. Therefore, the directions that were issued by this Court,

especially the direction that - “the SRA shall peremptorily on or before 31

January 2024, deposit an amount of Rs. 150 crores into the designated

account of SBI, failing which the consequences under the Resolution Plan

shall follow”, must have been necessarily seen in the context of the Resolution

Plan as well. The phrase “failing which the consequences under the Resolution

Plan shall follow” was a mandatory direction that should have been taken into

Civil Appeal Nos. 5023-5024 of 2024 Page 116 of 168

account by the NCLAT in its impugned order dated 12.03.2024. There was no

escape for the NCLAT in this regard. There was no option which was given

to the SRA to deviate from this direction which purely stemmed from the

Resolution Plan. The fact that this direction was binding was clearly

understood by the SRA since it attempted to file another Miscellaneous

Application before this Court requesting for an extension to comply with our

order dated 18.01.2024 which was dismissed as misconceived.

123. There were two other directions which were issued by us in our order dated

18.01.2024 i.e., (ii) that the PBG of Rs. 150 Crore shall continue to remain in

operation and effect pending the final disposal of the appeal before the

NCLAT, and shall abide by the final outcome of the appeal and the directions

that may be issued by the NCLAT; and (iii) whether or not the SRA has been

compliant with all the conditions of the Resolution Plan as well as of the

conditions set out in paragraph 8 of the affidavit dated 16 August 2023 shall

be decided by the NCLAT in the pending appeal. These two directions must

not be seen as giving any leeway to the NCLAT to act in complete ignorance

or defiance of the first direction that was issued by us. Such a selective

compliance with our order dated 18.01.2024 deserves to be nipped in the bud

more particularly when it was mandated that our directions be considered and

complied with in its entirety. Therefore, the NCLAT, while finally deciding

Civil Appeal Nos. 5023-5024 of 2024 Page 117 of 168

the pending Company Appeal on merits which led to the impugned order dated

12.03.2024 has, either by design or unknowingly, ignored the directions issued

by this Court vide order dated 18.01.2024 that the remaining amount of Rs.

150 Crore had to be necessarily deposited in cash only. This has resulted in a

perverse decision which stands contrary to law and to the terms of the

Resolution Plan itself.

124. In view of our crystal clear order dated 18.01.2024, we are of the opinion

that the PBG of Rs. 150 Crore could not have been allowed to be adjusted with

the first tranche payment of Rs. 350 Crore. Non-compliance of the SRA with

the order of this Court has led to a dereliction of its obligations to implement

the Resolution Plan.

ii. Whether the non-implementation of the Resolution Plan by the SRA

necessarily leads to the consequence of liquidation as under Section

33(3) of the IBC, 2016?

125. In the foregoing paragraphs, we have reached the conclusion that the SRA

failed to implement the Resolution Plan by not infusing the first tranche

payment of Rs. 350 Crore in cash, as required by Clause 6.3.1(g) and the

Implementation Schedule under Clause 7.7 of the Resolution Plan. It is now

Civil Appeal Nos. 5023-5024 of 2024 Page 118 of 168

to be seen if this has resulted in the contravention of other terms of the

Resolution Plan as well.

a. Whether Respondent No.1/SRA had failed to implement the Resolution

Plan on non-payment of the Airport Dues as per the terms of the

Resolution Plan?

126. With respect to the Airport dues, the impugned order of the NCLAT had

taken into consideration Clauses 6.4.1(e), 6.4.1(h) and 6.4.1(m) respectively.

Specifically dealing with Clause 6.4.1(h), it said that this provision dealt with

the treatment of outstanding CIRP costs which included parking charge i.e.,

Airport Charges. While considering so, the following observations were

made:

“54. The provisions of Resolution Plan as noted above

clearly indicates that CIRP costs includes Airport Charges.

SRA is also entitled to use funds available with the Corporate

Debtor as on effective date to meet any portion of CIRP

costs. The submission of the Appellants that the entire

Airport Charges have to be borne by the SRA upfront cannot

be accepted nor non-payment of Airport Charges by SRA as

on date makes the allotment of slot unavailable to the SRA.

Allotment of slot having been achieved by the SRA as noted

above, non-payment of airport charges upfront by SRA

cannot be said to be a reason to not accept the fulfillment of

condition of slot allotment. The payment of Airport Charges

has to be made as per the Resolution Plan when the

implementation of the plans commences as per the

Resolution Plan. We thus do not find any substance in the

submission of Learned Counsel for the Appellant that

Civil Appeal Nos. 5023-5024 of 2024 Page 119 of 168

allotment of slot is not completed since airport charges have

not been paid by the SRA.

55. With regard to submission of the Appellant that old dues

of Airport Charges having not been settled, the Adjudicating

Authority has rightly observed that settling old dues cannot

be conceded as non-allotment of slots. We thus fully concur

with the finding of the Adjudicating Authority that conditions

precedent under Clause 7.6.1(c) were fulfilled.”

(emphasis supplied).

127. The case of the Appellants is that upon consideration of Clause 6.4.1(h),

the NCLAT erroneously concluded that the Airport Charges would be a part

of the CIRP costs. Clause 6.4.1(h) of the Resolution Plan is reproduced

hereinbelow:

“(h) Based on the information provided, the Resolution

Applicant have assumed that the amounts standing to the

credit of the bank account of the Corporate Debtor

(including amounts estimated to be received subsequently)

are sufficient to cover for the CIRP Costs of the Corporate

Debtor (excluding parking charges, rental charges,

employee dues, taxes etc). Accordingly, the Resolution

Applicant has set aside a sum of Rs. 25 Crores as CIRP Costs

towards payment of any such costs until the Approval Date.

Any expenses incurred by the Corporate Debtor from the

Approval Date until the Effective Date will be incurred out

of the positive bank balance of the Corporate Debtor.”

(emphasis supplied)

128. A plain reading of Clause 6.4.1(h) reveals that the amount standing to the

credit of the bank account of the Corporate Debtor would be sufficient to cover

the CIRP costs of the Corporate Debtor but that this would exclude the parking

Civil Appeal Nos. 5023-5024 of 2024 Page 120 of 168

charges, rental charges, employee dues, taxes etc. Therefore, the clause does

not expressly exclude Airport Charges from the ambit of CIRP costs entirely

but only states that the amount available in the bank account of the Corporate

Debtor would be insufficient to cover the parking charges, rental charges etc

which also form a part of the CIRP costs. Since such a bank balance would

not cover the parking charge, rental charges, employee dues, taxes etc, the

Resolution Plan had set apart a separate sum of Rs. 25 Crore for the payment

of any such CIRP costs which might have accrued till the Approval Date.

Further, the other expenses including parking charges, rental charges etc.

which have been incurred post the Approval Date but within the Effective

Date i.e., the period during which the Conditions Precedent would be fulfilled,

would also be incurred out of the positive bank balance of the Corporate

Debtor. This is what Clause 6.4.1(h) provides for. To hold that Clause 6.4.1(h)

excludes airport dues from the scope of CIRP costs altogether would also

question the placement of clauses such as Clauses 6.4.1(f) (which provides for

an estimate of Rs. 240 Crore towards parking charges) under the larger

umbrella of Clause 6.4.1 which deals with the “Treatment of Outstanding

CIRP Costs” in totality.

129. Therefore, what the Resolution Plan contemplates is that the Airport

Charges be subsumed within the CIRP Dues and since all of the different

CIRP dues cannot be satisfied through the bank balance which stands to the

Civil Appeal Nos. 5023-5024 of 2024 Page 121 of 168

credit of the Corporate Debtor, a separate sum of Rs. 25 Crore was demarcated

towards the remaining CIRP payments. Hence, the NCLAT was right in

arriving at the conclusion that Airport Dues were indeed a part of the CIRP

costs.

130. It must further be noted that, the impugned order of the NCLAT nowhere

caps the Airport Dues to a maximum of Rs. 25 Crore. Moreover, such a

mention of Rs. 25 Crore is plainly absent in its observations regarding Airport

Dues. All that is mentioned is that “The payment of Airport Charges has to be

made as per the Resolution Plan when the implementation of the plan

commences as per the Resolution Plan”. It is in this regard that Clause 6.4.1(j)

provides that if the CIRP costs exceed the current estimates, then they will be

paid as per “actuals” in compliance with the provisions of the IBC and as a

consequence, the pay-outs towards the other creditors would be reduced

proportionately to account for such additional CIRP costs. This would be

subject to a minimum payment of liquidation value to the Operational

Creditors and Dissenting Financial Creditors of the Corporate Debtor and

subject to a maximum of Rs. 475 Crore. Therefore, the Resolution Plan, too,

does not contemplate the CIRP costs to be strictly subject to a maximum of

Rs. 25 Crore. To accept such a contention of the Appellants would be to

misinterpret the observations made in the impugned order.

Civil Appeal Nos. 5023-5024 of 2024 Page 122 of 168

131. The Appellants rely on Clause 6.3.1(d), specifically under the heading

“BKC Property not part of Resolution” to assert that the Airport Dues have to

be settled upfront and in full in the first 180 days from the Effective Date and

that it cannot be in staggered payments spread across a period of time.

However, Clause 6.3.1(d) which is titled “Proposal for Resolution of

Outstanding Airport and Parking Dues (Rs. 240 Crores as of August 31, 2020”

is attached with the following qualification:

“The Resolution Applicant states and confirms that this

“Proposal for Resolution of outstanding airport and parking

dues (approx. Rs. 240 Crores as of August 31,2020)” which

deals with the appropriation of the BKC Property is merely

a proposal and not a condition to the implementation of this

Resolution Plan and the CoC has the discretion to

accept/reject such a proposal. If the above-mentioned

proposal is acceptable to the CoC, then it is acceptable to

the Resolution Applicant in the manner stated hereinabove”.

(emphasis supplied)

The contention of the SRA is that the aforesaid qualification applies equally

to the part of Clause 6.3.1(d) under the heading “BKC Property not part of

resolution” and that the entire Clause 6.3.1(d) would remain a proposal and

not a binding condition on the SRA. Irrespective of a determination on the

same, even as per Clause 6.4.1, the payment towards CIRP costs including

Airport Charges had to be made in full, in priority, within 180 days from the

Effective Date. This is evident from – (a) Clause 6.4.1(a) which states that the

CIRP Costs are to be paid in priority to any other creditor of the Corporate

Civil Appeal Nos. 5023-5024 of 2024 Page 123 of 168

Debtor in terms of Section 30(2)(a) of the IBC, 2016; (b) Clause 6.4.1(k)

which states that the outstanding CIRP costs shall be paid by the Resolution

Applicant out of the funds infused by the Resolution Applicant in the

Corporate Debtor and as per the Implementation Schedule set out in Clause

7.7 below; (c) Clause 6.4.1(m) which states that the CIRP cost shall be “fully

paid and discharged after the Effective Date” before payment is made to any

of the creditors as per the Resolution Plan; (d) Clause 6.4.1(n) which states

that the Resolution Applicant has sufficient funds and that the CIRP costs shall

be met out of funds infused by the Resolution Applicant; and (e) S.No. 16 of

the Implementation Schedule under Clause 7.7 which states that the CIRP

costs must be paid as per Clause 6.4.1 within Z+170 days.

132. Therefore, the SRA not having infused the first tranche payment of Rs. 350

Crore as per Clause 6.3.1(g) and S. No. 11 of the Implementation Schedule

under Clause 7.7 within a period of 180 days from the Effective Date and

within the multiple extensions granted therefrom, has defaulted on its

obligation towards the payment of CIRP costs (which include airport dues)

under Clause 6.4.1 as well.

Civil Appeal Nos. 5023-5024 of 2024 Page 124 of 168

b. Whether Respondent No.1/SRA could be said to have failed to implement

the Resolution Plan on account of the non-payment of workmen and

employees’ dues as per the terms of the Resolution Plan and the order of

the NCLT dated 21.10.2022 which was confirmed by the order dated

31.01.2023 of this Court?

133. The Resolution Plan, under Clause 6.4.2 deals with the “Treatment of

Employees/Workmen dues, including dues of the Authorized Representatives

of Employees/Workmen”. Clause 6.4.2(a) provides for a fixed sum of Rs. 52

Crore to be paid to the workmen and employees towards settlement of all their

claims. Clause 6.4.2(b) states that this payment shall be made out of the funds

infused by the SRA in the Corporate Debtor, in priority to the payment to the

financial creditors and as per the Implementation Schedule set out in Clause

7.7 i.e., within 175 days from the Effective Date. Clause 6.4.2(c) provides that

if the Liquidation Value due to the workmen and employees is not “nil”, then

the SRA would pay such a Liquidation Value. If this Liquidation Value is over

and above the amount proposed to be paid under the Resolution Plan, then

such additional amounts shall be first paid out of the positive bank balance of

the Corporate Debtor as on the Effective Date and the remaining amounts shall

be paid out of the amounts reserved for other creditors on a pro rata basis,

subject to a maximum of Rs. 475 Crore.

Civil Appeal Nos. 5023-5024 of 2024 Page 125 of 168

134. The order dated 21.10.2022 of the NCLAT dealt with the entitlements of

the workmen and employees to several payments and made the following

observations:

“71. In view of the aforesaid discussion, we arrive at

following conclusions:

(i) The workmen and employees are entitled for payment of

full amount of provident fund and gratuity till the date of

commencement of the insolvency which amount is to be paid

by the Successful Resolution Applicant consequent to

approval of the Resolution Plan in addition to the 24 months

workmen dues as the workmen is entitled to under Section

53(1)(b) of the Code. It is made clear that in addition to part

amount of provident fund and gratuity as proposed in

Resolution Plan to workmen, Successful Resolution

Applicant is obliged to make payment of balance unpaid

amount of provident fund and gratuity to workmen and

employees.

72. Our answer to Question II and III is as follows:

(i) The workmen and employees are entitled to receive the

amount of provident fund and gratuity in full since they

are not part of the liquidation estate under Section

36(4)(b)(iii).

(ii) The workmen are entitled to receive their dues from

the Corporate Debtor for period of 24 months as per

provision of Section 53(1)(b) at least to minimum

liquidation value envisaged under Section 32(2)(b) read

with Section 53(1).

xxx xxx xxx

80. As observed above, in admitted claim of workmen

provident fund, gratuity and leave encashment was included,

and payment proposed in plan partly satisfy above dues also.

The workmen are entitled to full payment of provident fund

and gratuity, hence, the balance of above dues are to be paid

by the Successful Resolution Applicant, to satisfy statutory

obligations. Non-payment of full provident fund and gratuity

Civil Appeal Nos. 5023-5024 of 2024 Page 126 of 168

shall lead to violation of Section 30(2)(e), hence, to save the

plan the above payments have to be made.

xxx xxx xxx

128. In the forgoing discussions, we have noted that the

liquidation value of the workmen as has been referred to in

Form-H preferred by the Resolution Professional is Rs.113

crores and workmen were entitled to receive at least Rs.113

crores as per Section 30(2)(b) read with Section 53(1)(b) of

the Code. Shri Krishnendu Datta, learned Counsel for

Successful Resolution Applicant during his submission,

submitted that Successful Resolution Applicant shall be

paying an amount of Rs.113 crores to the workmen as per

the Resolution Plan, since it was contemplated that, if

liquidation value is more than Rs.52 crores, the liquidation

value shall be payable to the workmen. To clear any doubt,

we deem it fit and proper to issue direction to Successful

Resolution Applicant to make payment to the workmen of

Rs.113 crores as per the Resolution Plan.

xxx xxx xxx

134. In result, the Appeal(s) are decided in following

manner:

(I) The Appeal(s) of workmen and employees being Company

Appeal (AT) (Insolvency) Nos. 643 of 2021, 752 of 2021, 801

of 2021, 915 of 2021, 771 of 2022 are partly allowed with

following directions:

(a) Successful Resolution Applicant is directed to make

payment of unpaid provident fund to the workmen till date of

insolvency commencement, after deducting the amount

already paid towards provident fund in the Resolution Plan

to the workmen.

(b) The workmen are also entitled for payment of their

gratuity dues as on insolvency commencement date, after

adjusting any amount towards gratuity paid under the

Resolution Plan.

It is made clear that entitlement of those employees and

workmen, who were demerged into AGSL shall not be there,

Civil Appeal Nos. 5023-5024 of 2024 Page 127 of 168

since demerger has not been treated as termination of their

services.

(c) The employees are also entitled for the payment of their

full provident fund, unpaid up to the date of insolvency

commencement date. It is made clear that full payment of

provident fund would be of that unpaid part of provident

fund, which has not been deposited by the Corporate Debtor

in the EPFO.

(d) Employees shall also be entitled for the gratuity, which

fell due up to insolvency commencement date.

(e) The rest of the prayers of the workmen and employees are

denied.

(f) The Chairman of the Monitoring Committee, erstwhile

Resolution Professional is directed to compute the payments

to be made to workmen and employees within one month

from today and communicate the same to the Successful

Resolution Applicant to take steps for payment.”

(emphasis supplied)

135. Thus, it was held in clear terms that the workmen and employees are

entitled to full payment of Provident Fund and Gratuity. The non-payment of

these amounts shall lead to a violation of Section 30(2)(e) of the IBC, 2016

which requires that the Resolution Plan must not contravene any of the

provisions of the law for the time being in force. Further, it was held that the

workmen and employees are entitled to a liquidation value of Rs. 113 Crore

instead of Rs. 52 Crore as contemplated in the Resolution Plan. The NCLAT

directed the Chairman of the Monitoring Committee (the erstwhile Resolution

Professional) to compute the payments to be made to the workmen and

employees within one month and to communicate the same to the SRA. The

Civil Appeal Nos. 5023-5024 of 2024 Page 128 of 168

RP had arrived at a figure of Rs. 226.6 Crore which comprised of Rs. 14 Crore

towards Provident Fund dues, Rs. 188.2 Crore towards Gratuity dues and Rs.

24.4 Crore towards damages for non-payment of Provident Fund.

136. The SRA sought a clarification of the aforesaid order before the NCLAT

and vide order dated 02.12.2022, it was made clear that the cost of paying the

unpaid amount towards the Provident Fund and Gratuity to the workmen and

employees has to be borne by the SRA. The same cannot be paid out of the

amounts reserved for the other creditors of the Corporate Debtor on a pro-rata

basis subject to a maximum of Rs. 475 Crore as stated in Clause 6.4.2(e) of

the Resolution Plan since that was a contemplation pertaining to the

liquidation value only and not for the dues relating to Provident Fund and

Gratuity. An appeal against the order dated 21.10.2022 was dismissed by this

Court vide order dated 30.01.2023. Therefore, there was no scope left for the

SRA to avoid payment of the Provident Fund and Gratuity dues to the

workmen and employees. Such an obligation was in addition to the payment

of minimum liquidation value that the workmen/employees were entitled to

under the terms of the Resolution Plan.

137. The SRA had filed IA Nos. 3789-3790 of 2023 in the Company Appeal on

16.06.2023 praying that the Gratuity Claims be allowed to be paid in three

tranches i.e., within 3, 4 and 5 years from the Closing Date. The SRA also

Civil Appeal Nos. 5023-5024 of 2024 Page 129 of 168

sought leave from the NCLAT to approach the EPFO Authorities under

Section 14B to seek a reduction or waiver of the damages of Rs. 24.4 crore

imposed on the Corporate Debtor and to also pursue an appeal against the

order of the EPFO Authorities directing the SRA to pay the damages.

Subsequently, on 18.08.2023, the SRA filed two other IAs 3801-3802 of 2023

in the Company Appeal, praying that, in case the previous IA relating to the

Gratuity and Provident Fund Claims is not allowed, then the Resolution Plan

cannot be implemented under Section 30(2)(e) and as a consequence, the

Lenders be directed to refund all amounts invested or infused into the

Corporate Debtor by the SRA.

138. The NCLAT in its impugned order has taken note of its own order dated

21.10.2022 but has, however, only allowed the upfront payment of the

Provident Fund dues of Rs. 12 Crore to the workmen and employees along

with the payments that they are entitled to under the Resolution Plan. There is

no specific direction as regard the payment obligations related to Gratuity nor

any decision rendered on the two aforesaid IAs filed by the SRA in the

Company Appeal. The NCLAT committed a serious error in failing to

consider these IAs filed by the SRA and has given the impression that the SRA

is liable to pay only the Provident Fund dues upfront.

139. According to the SRA, the dues relating to the Provident Fund would be

paid upfront in compliance with Section 11 of the Employees’ Provident Fund

Civil Appeal Nos. 5023-5024 of 2024 Page 130 of 168

and Miscellaneous Provisions Act, 1952. However, the Gratuity Dues could

be paid in tranches since neither the order dated 21.10.2022 of the NCLAT

nor the order dated 30.01.2023 of this Court had imposed any timelines for

the payment of the Gratuity Dues. Furthermore, it was submitted that the

provisions of the Payment of Gratuity Act, 1972 were not so stringent.

However, such a proposal cannot be allowed especially in light of the fact that

the order dated 21.10.2022 of the NCLAT is unambiguous in its declaration

that both Provident Fund and Gratuity dues have to be paid by the SRA in

order to save the Resolution Plan from being hit by Section 30(2)(e) of the

IBC, 2016.

140. Therefore, by not infusing the first tranche payment of Rs. 350 Crore as

per the Implementation Schedule of the Resolution Plan, the SRA has

breached the terms of the Resolution Plan which required a minimum

liquidation value of Rs. 113 Crore to be paid towards the Workmen and

Employees’ Dues as well. Moreover, both the Provident Fund and Gratuity

Dues amounting to Rs. 226 Crore should also have been paid by the SRA as

per the order dated 21.10.2022 of the NCLAT in fulfillment of its obligations,

which it failed to do.

Civil Appeal Nos. 5023-5024 of 2024 Page 131 of 168

c. Whether there were sufficient grounds before the NCLAT to hold that

Respondent No.1/SRA had contravened the terms of the approved

Resolution Plan and that the Corporate Debtor must be directed to be

liquidated under Section 33(3) of the IBC, 2016?

141. The NCLAT in its impugned order held that the non-deposit of Rs. 150

Crore in cash towards the first tranche payment of Rs. 350 Crore cannot lead

to the conclusion that the Resolution Plan had failed. The relevant

observations are reproduced hereinbelow:

“79. The submission of the Appellant that on account of non-

deposit INR 150 crores as directed by the Hon’ble Supreme

Court, should lead to liquidation of the Corporate Debtor,

cannot be accepted. The Hon’ble Supreme Court in its

judgment dated 18.01.2024 has clearly held that its order

modifying the direction of the Tribunal is confined only to

the permission granted to the SRA to adjust INR 150 crores

PBG. Thus, modification of the order by the Hon’ble

Supreme Court also has to confine to the adjustment of the

PBG. It was held by the Hon’ble Supreme Court that

Appellant have asked for infusion of INR 350 crores and

infusion does not include adjustment of PBG. The Hon’ble

Supreme Court neither considered nor expressed any

opinion on the question of liquidation of the Corporate

Debtor, nor the order dated 18.01.2024 can be read to mean

that non-compliance of the direction to deposit INR 150

crores by the SRA by 31.01.2024 should lead to liquidation

of the Corporate Debtor. The submission of the Appellant

that non-deposit of INR 150 crores leads to failure of

Resolution Plan, cannot be accepted. As observed above,

consequence of non-deposit of INR 150 crores is that these

Appeals have to be heard on merits and the question, which

has arisen in the Appeal has to be decided regarding

Civil Appeal Nos. 5023-5024 of 2024 Page 132 of 168

compliance of conditions precedent by the SRA by

20.05.2022.

Further submission of the Appellant that this Tribunal may

exercise jurisdiction under Section 33, sub-section (3) in

directing liquidation of the Corporate Debtor due to non-

compliance of deposit on INR 150 crores also cannot be

accepted. For passing an order under Section 33, sub-

section (3), there has to be adjudication that Resolution Plan

approved by the Adjudicating Authority has been

contravened by the Successful Resolution Applicant. We do

not accept the submission of the Appellant that by non-

deposit of INR 150 crores by 31.01.2024, the SRA has

contravened the Resolution Plan and order be passed under

Section 33, sub-section (3).

In view of our above observations and conclusions, we

answer Question Nos. v, vi, and vii in following manner:

Question No. v: Direction of Hon’ble Supreme Court

permitting the Successful Resolution

Applicant to infuse INR 150 crores by

31.01.2024 was in reference to offer

made by Appellant in affidavit dated

16.08.2023

Question No. iv: The Successful Resolution Applicant

having not been able to infuse funds by

31.01.2024 as directed by Hon’ble

Supreme Court vide its judgment dated

18.01.2024, it cannot be held that

Resolution Plan has failed and cannot

be implemented by the SRA.

Question No. vii: No grounds have been made out to

direct the liquidation of the Corporate

Debtor under Section 33, sub-section

(3) in these Appeals.”

(emphasis supplied)

Civil Appeal Nos. 5023-5024 of 2024 Page 133 of 168

142. The NCLAT declined to accept the submission of the Appellant that on

account of non-deposit of Rs. 150 Crore as directed by this Court, the

Corporate Debtor should be liquidated. However, this was based on the

incorrect assumption that the direction of this Court to infuse to Rs. 150 Crore

in cash was only confined to the terms of the Lenders Affidavit dated

16.08.2023. Previous segments of the judgment have elaborated in sufficient

detail that the Lender’s Affidavit could not have provided for conditions

which were incompatible with the terms of the Resolution Plan. Such an

affidavit would have been in direct contravention with Section 31(1) of the

IBC, 2016 which does not permit any modifications to be made in the

Resolution Plan duly approved by the Adjudicating Authority. Therefore, the

direction of this Court in its order dated 18.01.2024 was with respect to both

the Lenders Affidavit and the underlying terms of the Resolution Plan. The

same was so understood by all the parties involved.

143. The Lender’s Affidavit in precise terms stated that “Failing to comply with

the conditions mentioned in Para 8(a) to (c) above, the Corporate Debtor

should be directed to go into liquidation”. It was in this context that this Court

stated that, “the SRA shall peremptorily on or before 31 January 2024, deposit

an amount of Rs. 150 crores into the designated account of SBI, failing which

the consequences under the Resolution Plan will follow”. Therefore, it is

Civil Appeal Nos. 5023-5024 of 2024 Page 134 of 168

incorrect to contend that this Court neither considered nor expressed any

opinion on the question of liquidation of the Corporate Debtor. The

consequence of non-implementation of the Resolution Plan by the SRA must

necessarily be liquidation of the Corporate Debtor in accordance with Section

33(3) of the IBC, 2016. Section 33(3) of the IBC, 2016 reads as thus:

“(3) Where the resolution plan approved by the Adjudicating

Authority is contravened by the concerned corporate debtor,

any person other than the corporate debtor, whose interests

are prejudicially affected by such contravention, may make

an application to the Adjudicating Authority for a liquidation

order as referred to in sub-clauses (i), (ii) and (iii) of clause

(b) of sub-section (1).”

(emphasis supplied)

144. The non-deposit of Rs. 150 Crore had in fact lead to a failure of the

Resolution Plan on several counts as elaborated herein. In addition to the

breach of Clauses 6.3.1(g), 6.4.4 and S. No. 11 of the Implementation

Schedule under Clause 7.7, the non-infusion of the first tranche payment in

accordance with the terms of the Resolution Plan has also led to an infraction

as regards Clause 6.4.1 on the payment of CIRP costs and Clause 6.4.2 on the

payment of workmen/employees’ dues. Further, the payment of the Provident

Fund and Gratuity dues of the workmen/Employees as mandated by the order

dated 21.10.2022 of the NCLAT which was confirmed by this Court on

31.01.2023, has also not been made by the SRA.

Civil Appeal Nos. 5023-5024 of 2024 Page 135 of 168

145. The SRA was given multiple extensions, post the Effective Date i.e.,

20.05.2022 in order to implement the Resolution Plan and infuse the first

tranche payment of Rs. 350 Crore into the Corporate Debtor. This includes the

extensions granted by (a) the NCLT vide order dated 13.01.2023, by which

the timeline for infusion of the first tranche payment was extended till

15.05.2023; (b) the NCLAT vide order dated 26.05.2023, where the timeline

of 180 days was further extended up to 31.08.2023; (c) the NCLAT vide order

dated 28.08.2023, where the timeline of 180 days was extended up to

30.09.2023; and (d) this Court vide order dated 18.01.2024, whereby the time

of 180 days for infusion was extended up to 31.01.2024. However,

indisputably, there has been a failure on the part of the SRA to abide by all

these extended timelines as well. No further extensions or accommodations

can be given to the SRA in light of the multiple opportunities already granted

as aforesaid. Further, if such a request for further extension is entertained, it

would only serve to bring us to the position that the parties were at when the

order of this Court dated 18.01.2024 was passed.

146. In Kridhan Infrastructure Private Limited v. Venkatesan

Sankaranarayan and Others reported in (2021) 6 SCC 94 the appellant had

failed to fulfil its obligations under the Resolution Plan, including that of

Civil Appeal Nos. 5023-5024 of 2024 Page 136 of 168

equity infusion, despite numerous opportunities granted over a period of 6

months. Therefore, the CoC voted by a majority to liquidate the corporate

debtor as a result of failure to implement the resolution plan. The NCLT had

allowed the liquidation to proceed and the NCLAT had upheld the same. On

an appeal before this Court, a statement was made by the successful resolution

applicant therein that an amount of Rs. 50 Crore would be deposited on or

before 10.01.2021. Bearing in mind that liquidation under the IBC is a matter

of last resort, such an opportunity was granted. The time for making the said

deposit was further extended until 25.02.2021. However, no payment was

made. By underscoring that time is a crucial facet of the scheme under the

IBC, this Court held that there was a failure on part of the resolution applicant

to implement the resolution plan and it was ordered that the liquidation

proceedings against the corporate debtor be revived. The relevant observations

are reproduced hereinbelow:

“11. The appellant has been unable to raise the funds. The

fact of the matter, as it emerges from Mr Viswanathan's

submissions, is that the appellant will be unable to raise

funds from the term lenders who are insisting that the status

of the Company should change from a company under

liquidation to an active status. The order of liquidation has

not been set aside. Ultimately, what the request of the

appellant reduces itself to, is that it would raise funds on a

mortgage of the assets of the Company and unless the

Company is brought out of liquidation, it would not be in a

position to raise the funds. This is unacceptable. At this

stage, the order of liquidation has only been stayed, but a

final view was, thus, to be taken by this Court. Sufficient

Civil Appeal Nos. 5023-5024 of 2024 Page 137 of 168

opportunities were granted to the appellant earlier during

the pendency of the proceedings both before the NCLT

and NCLAT. The orders of the NCLT and Nclat make it

abundantly clear that despite the grant of sufficient time, the

appellant has not been able to comply with the terms of the

resolution plan. Since 9-10-2020, despite the passage of

almost five months, the appellant has not been able to deposit

an amount of Rs 50 crores. Time is a crucial facet of the

scheme under IBC [Innoventive Industries

Ltd. v. ICICI Bank, (2018) 1 SCC 407, paras 12-16 : (2018)

1 SCC (Civ) 356] . To allow such proceedings to lapse into

an indefinite delay will plainly defeat the object of the

statute. A good faith effort to resolve a corporate insolvency

is a preferred course. However, a resolution applicant must

be fair in its dealings as well. The appellant has failed to

abide by its obligations. In that view of the matter, we see no

reason or justification to entertain the civil appeal any

further. The consequence envisaged under the order of this

Court shall accordingly ensue in terms of the forfeiture of the

amount of Rs 20 crores. As a consequence of this order, the

management shall revert to the liquidator for taking steps in

accordance with law. The civil appeal is accordingly

dismissed.”

(emphasis supplied).

147. The SRA herein has failed to infuse the first tranche payment of Rs. 350

Crore as envisaged in the Resolution Plan despite the Effective Date being

fixed on 20.05.2022. As a consequence, the payment of CIRP costs, workmen

and employees’ dues etc. which must be made in priority over the dues of the

other creditors have also not been made. More than 5 years have passed and

the implementation of the Resolution Plan still seems to be a dim light at the

far end of a long tunnel. Over this period of 5 years, several dues such as the

Airport dues to be paid by the Corporate Debtor have increased multi-fold due

Civil Appeal Nos. 5023-5024 of 2024 Page 138 of 168

to the fault of the SRA and this Court must ensure that such debts stop running

at some point in time.

148. Although one of the key objectives of the IBC, 2016 is to ensure the

survival of the corporate debtor as a going concern, yet the same must not

come at the cost of efficiency. In scenarios such as the present, “timely

liquidation” is indeed preferred over an “endless resolution process”. Such a

view will prevent the likelihood of adversely affecting the interests of all the

creditors who have been suffering due to no fault of their own and also

securing the maximization of value of the remaining assets.

149. At this stage of the implementation of the Resolution Plan, it is no longer

viable for the SRA to submit that the Resolution Plan shall automatically stand

withdrawn according to Clause 7.6.4 of the Resolution Plan and upon, such

withdrawal, the members of the SRA in the MC shall resign, the remaining

members of the MC shall assume absolute control of the Corporate Debtor

and all the amounts infused by the SRA would be refunded. This is especially

so, since the Conditions Precedent were declared to be fulfilled and the

Effective Date was achieved on 20.05.2022. The consequence of the failure to

implement the Resolution Plan in terms of Clause 9.4 of the Resolution Plan

and Clause 3.13.7(iii) of the RFRP is that the Appellants are entitled to invoke

the PBG automatically without any reference to the SRA. Therefore, it is

Civil Appeal Nos. 5023-5024 of 2024 Page 139 of 168

directed that the PBG may be invoked by the Appellants in accordance with

the terms of the Resolution Plan.

iii. Whether the timely implementation of the Resolution Plan is also one

of the objectives of the IBC, 2016?

150. The Preamble to the Insolvency and Bankruptcy Code, 2016 reads as thus:

“An Act to consolidate and amend the laws relating to

reorganisation and insolvency resolution of corporate

persons, partnership firms and individuals in a time bound

manner for maximisation of value of assets of such persons,

to promote entrepreneurship, availability of credit and

balance the interests of all the stakeholders including

alteration in the order of priority of payment of Government

dues and to establish an Insolvency and Bankruptcy Board

of India, and for matters connected therewith or incidental

thereto.”

(emphasis supplied)

151. The Report of the Bankruptcy Law Reforms Committee, 2015 (hereinafter,

the “2015 Report”) also serves to provide valuable insight into the several

purposes for which the Code was enacted. Upon highlighting the various

benefits of a consolidated insolvency regime, the Report also emphasizes on

the time-bound working of the Code. The relevant observations are

reproduced hereinbelow:

“Speed is of essence

Civil Appeal Nos. 5023-5024 of 2024 Page 140 of 168

Speed is of essence for the working of the bankruptcy code,

for two reasons. First, while the “calm period” can help keep

an organisation afloat, without the full clarity of ownership

and control, significant decisions cannot be made. Without

effective leadership, the firm will tend to atrophy and fail.

The longer the delay, the more likely it is that liquidation will

be the only answer. Second, the liquidation value tends to go

down with time as many assets suffer from a high economic

rate of depreciation.

From the viewpoint of creditors, a good realisation can

generally be obtained if the firm is sold as a going concern.

Hence, when delays induce liquidation, there is value

destruction. Further, even in liquidation, the realisation is

lower when there are delays. Hence, delays cause value

destruction. Thus, achieving a high recovery rate is

primarily about identifying and combating the sources of

delay.”

(emphasis supplied)

The Report acknowledged that time and speed are of the essence for the

working of the Code. It conceded that significant decisions cannot be made

for the company without full clarity as to ownership and control. Therefore,

the longer it takes for installing effective leadership, the quicker will be the

rate of atrophy of the company. Over a period of time, this delay in taking

control of the company will lead to liquidation being the only viable answer.

In this context, if there is additional delay during the process of liquidation,

the liquidation value might also reduce significantly since the company’s

assets might suffer a high economic rate of depreciation.

Civil Appeal Nos. 5023-5024 of 2024 Page 141 of 168

152. We hasten to add that any delay in arriving at the conclusion that the

company is to be liquidated is also detrimental to a Company, especially when

the Company has long awaited timely and positive action from the successful

resolution applicant as regards the implementation of the approved resolution

plan. Therefore, although liquidation should be the last resort, yet one should

also ensure that further delay in arriving at this decision does not have the

effect of hampering the realizations that can be made through liquidation.

153. The decision in Innoventive Industries Limited v. ICICI Bank and

Another reported in (2018) 1 SCC 407 held that the Maharashtra Relief

Undertakings (Special Provisions) Act, 1959 was repugnant to the IBC, 2016

and elaborated on the scheme of the IBC, 2016 by placing reliance on the 2015

Report as aforementioned. The relevant observations are reproduced

hereinbelow:

“13. One of the important objectives of the Code is to bring

the insolvency law in India under a single unified umbrella

with the object of speeding up of the insolvency process. As

per the data available with the World Bank in 2016,

insolvency resolution in India took 4.3 years on an average,

which was much higher when compared with the United

Kingdom (1 year), USA (1.5 years) and South Africa (2

years). The World Bank's Ease of Doing Business Index,

2015, ranked India as country number 135 out of 190

countries on the ease of resolving insolvency based on

various indicia.

xxx xxx xxx

Civil Appeal Nos. 5023-5024 of 2024 Page 142 of 168

16. At this stage, it is important to set out the important

paragraphs contained in the Report of the Bankruptcy Law

Reforms Committee of November 2015, as these excerpts

give us a good insight into why the Code was enacted and

the purpose for which it was enacted:

xxx xxx xxx

Speed is of essence

Speed is of essence for the working of the bankruptcy code,

for two reasons. First, while the “calm period” can help keep

an organisation afloat, without the full clarity of ownership

and control, significant decisions cannot be made. Without

effective leadership, the firm will tend to atrophy and fail.

The longer the delay, the more likely it is that liquidation will

be the only answer. Second, the liquidation value tends to go

down with time as many assets suffer from a high economic

rate of depreciation.

From the viewpoint of creditors, a good realisation can

generally be obtained if the firm is sold as a going concern.

Hence, when delays induce liquidation, there is value

destruction. Further, even in liquidation, the realisation is

lower when there are delays. Hence, delays cause value

destruction. Thus, achieving a high recovery rate is

primarily about identifying and combating the sources of

delay.

xxx xxx xxx

Objectives

The Committee set the following as objectives desired from

implementing a new Code to resolve insolvency and

bankruptcy:

(1) Low time to resolution.

(2) Low loss in recovery.

(3) Higher levels of debt financing across a wide variety of

debt instruments.”

(emphasis supplied)

Civil Appeal Nos. 5023-5024 of 2024 Page 143 of 168

154. Several decisions of this Court have highlighted the importance of a speedy

resolution process under the IBC, 2016 in the context of either completing the

CIRP process in a time-bound manner as per Section 12 of the IBC, 2016 or

ensuring that the Liquidator does not cause unnecessary delay or inefficiency

in the Liquidation process. A primary and predominant consideration behind

minimizing delay is to ensure that the assets of the Corporate Debtor do not

get frittered away or depreciated due to the time lag caused either during the

CIRP or during the liquidation process overseen by the Liquidator. Such a

time bound action is also equally important and imperative while the

Resolution Plan is being implemented by the successful resolution applicant.

Unnecessary delay caused in implementation of the Resolution Plan would

also lead to similar consequences of the assets of the corporate debtor

diminishing in value. Therefore, there is no doubt that the timely

implementation of the Resolution Plan is also one of the underlying objectives

of the IBC, 2016.

155. It is in the above context that the Rules regarding the power of the NCLT

and NCLAT to extend time, have to be discussed. Rule 15 of the NCLT Rules,

2016 reads as thus:

“15. Power to extend time.- The Tribunal may extend the

time appointed by these rules or fixed by any order, for doing

any act or taking any proceeding, upon such terms, if any, as

the justice of the case may require, and any enlargement may

Civil Appeal Nos. 5023-5024 of 2024 Page 144 of 168

be ordered, although the application therefore is not made

until after the expiration of the time appointed or allowed.”

156. Rule 15 of the NCLAT Rules, 2016 reads as thus:

“15. Power to extend time.- The Appellate Tribunal may

extend the time appointed by these rules or fixed by any

order, for doing any act or taking any proceeding, upon such

terms, if any, as the justice of the case may require, and any

enlargement may be ordered, although the application

therefore is not made until after the expiration of the time

appointed or allowed.

157. Rule 15 of the NCLT and NCLAT Rules, 2016 grants power to the NCLT

and NCLAT respectively, to extend the time limits for doing any act which

have been fixed, either by the rules or by an order, as the justice of the case

may require. However, such power must not be exercised mechanically

without any application of mind. An extension on the strict timelines fixed

under the resolution plan must be done by adequately weighing the period of

extension sought with the consequences of such extension on the continued

implementation of the Resolution Plan. After all, such a discretion cannot be

exercised to the detriment of the resolution plan and its implementation itself.

While one of the reasons supporting the grant of extension would be to ensure

the successful revival of the corporate debtor, multiple extensions may

seriously hamper the economic feasibility of the Resolution Plan and also lead

to an increase in the debts of the corporate debtor. Not to mention, during the

Civil Appeal Nos. 5023-5024 of 2024 Page 145 of 168

extended period, there are several costs incurred towards maintaining the

corporate debtor as well. The feasibility and practicability of the resolution

plan adjudged by the “commercial wisdom” of the CoC might no longer

remain in cases where incessant extensions are granted by the NCLT and

NCLAT under their discretionary powers.

158. The discretion in extending the time limits fixed under the Resolution Plan

must be exercised in a much more circumspect manner, especially in cases

such as the present, which pertains to the aviation sector, wherein timely

resolution and revival of the Corporate Debtor is all the more crucial since the

sector operates in such a way that a continuous flow of cash is required to

maintain the company in a position of status quo.

159. We are now left to finally consider whether in view of the gross facts on

record, we should, in exercise of our plenary jurisdiction under Article 142 of

the Constitution, direct that the Corporate Debtor be taken in liquidation.

160. This Court in Ebix (supra) had opined that the exercise of powers, even

under Article 142, must be broadly compliant with the insolvency framework

and its underlying objective. It was highlighted therein that the Court must

remain cautious in granting reliefs that may run counter to the timeliness and

Civil Appeal Nos. 5023-5024 of 2024 Page 146 of 168

predictability that is central to the IBC, 2016. The relevant observations made

are reproduced hereinbelow:

“101. Any claim seeking an exercise of the adjudicating

authority's residuary powers under Section 60(5)(c) IBC,

NCLT's inherent powers under Rule 11 of the NCLT Rules,

2016 or even the powers of this Court under Article 142 of

the Constitution must be closely scrutinised for broader

compliance with the insolvency framework and its

underlying objective. The adjudicating mechanisms which

have been specifically created by the statute, have a

narrowly defined role in the process and must be

circumspect in granting reliefs that may run counter to the

timeliness and predictability that is central to IBC. Any

judicial creation of a procedural or substantive remedy that

is not envisaged by the statute would not only violate the

principle of separation of powers, but also run the risk of

altering the delicate coordination that is designed by IBC

framework and have grave implications on the outcome of

the CIRP, the economy of the country and the lives of the

workers and other allied parties who are statutorily bound

by the impact of a resolution or liquidation of a corporate

debtor.”

(emphasis supplied)

161. We are conscious of our recent decision Glas Trust Company LLC v. Byju

Raveendran and Others reported in 2024 SCC OnLine SC 3032, taking the

view that the Court must be circumspect in deviating from the prescribed

procedure, especially in the context of the IBC, 2016. However, if such a

deviation is made, then the Court must justify as to why the deviation was

necessary to prevent the abuse of the process of the Court. The relevant

observations are reproduced hereinbelow:

Civil Appeal Nos. 5023-5024 of 2024 Page 147 of 168

“70. When a procedure has been prescribed for a particular

purpose exhaustively, no power shall be exercised otherwise

than in the manner prescribed by the said provisions. In such

cases, the court must be circumspect in invoking its ‘inherent

powers’ to deviate from the prescribed procedure. If such

deviation is made, the court must justify why this was

necessary to “prevent the abuse of the process of the Court”.

71. The need to be circumspect while invoking “inherent

powers”, when there is an exhaustive legal framework is

amplified in the context of a legislation like the IBC. In Ebix

Singapore (P) Ltd. v. Educomp Solutions Ltd. (CoC), a two-

judge bench of this Court, speaking through one of us (DY

Chandrachud, J), affirmed this position and observed as

follows:

“Any claim seeking an exercise of the adjudicating

authority's residuary powers under Section 60(5)(c) IBC,

NCLT's inherent powers under Rule 11 of the NCLT Rules

or even the powers of this Court under Article 142 of

the Constitution must be closely scrutinized for broader

compliance with the insolvency framework and its

underlying objective. The adjudicating mechanisms which

have been specifically created by the statute, have a

narrowly defined role in the process and must be

circumspect in granting reliefs that may run counter to the

timeliness and predictability that is central to the

IBC. Any judicial creation of a procedural or substantive

remedy that is not envisaged by the statute would not only

violate the principle of separation of powers, but also run

the risk of altering the delicate coordination that is

designed by the IBC framework and have grave

implications on the outcome of the CIRP, the economy of

the country and the lives of the workers and other allied

parties who are statutorily bound by the impact of a

resolution or liquidation of a Corporate Debtor.”

(emphasis supplied)

162. However, the aforementioned decision should in no manner be read so as

to restrict the exercise of plenary powers under Article 142 of the Constitution

Civil Appeal Nos. 5023-5024 of 2024 Page 148 of 168

even while in deviating from the statutory procedure and framework of the

IBC, 2016 or the rules and regulations thereunder, if such deviation is very

much necessary. This Court in Glas Trust (supra) only went so far as to say

that, where there is a prescribed procedure in place for a particular purpose,

then that particular thing must be done only in the manner prescribed. It no

way lays a dictum that even where cogent reasons exist warranting such

deviation, the court would be powerless to exercise such inherent powers. In

other words, Glas Trust (supra) only went to the extent of saying that in the

absence of any exceptional circumstances or extraordinary reasons

necessitating a deviation from the procedure laid down, the court should

refrain from invoking its inherent jurisdiction to do something which

otherwise could have been validly done in accordance with the procedure.

163. We are of the considered view that where there exists extraordinary

circumstances warranting the exercise of such powers in order to ensure that

the very salutary purpose of the Code, 2016 is not frustrated, then the Court

would be well-within its prerogative to exercise them to secure the object of

the IBC, 2016. If the proposition that there ought to be no exercise of the

inherent powers where a procedure is laid down were to be blanketly accepted

then it may have a very chilling effect whereby the very purpose of vesting

Civil Appeal Nos. 5023-5024 of 2024 Page 149 of 168

this Court with inherent powers under Article 142 and Tribunals with Rule 11

of the NCLT Rules would be rendered otiose and meaningless.

164. On account of the inordinate delay in due implementation of the Resolution

Plan, several dues including the CIRP costs of the Corporate Debtor have

continuously multiplied. The Appellants are incurring huge expenditure and

costs each month towards maintenance of the Corporate Debtor. The

fundamental concern of this Court must not only be of doing substantial and

complete justice but also to ensure expeditious resolution of the issues in the

interests of the underlying objective of the IBC, 2016 and all the stakeholders

involved. We must obviate the possibility of the Corporate Debtor being stuck,

embroiled and its resolution being further delayed, especially in light of the

delay that has already ensued.

165. Having due regard to the materials on record, a determination that the terms

of the Resolution Plan have been contravened and that there has been a failure

to implement on part of the SRA, has already been made on a consideration

of the issues before us. As such, since the Resolution Plan is no longer capable

of being implemented, we must ensure that at least liquidation remains as a

“viable” last resort for the Corporate Debtor and its creditors. Being mindful

of the underlying objective that “Time and Speed are of the essence under the

Civil Appeal Nos. 5023-5024 of 2024 Page 150 of 168

Code” and to prevent the frustration of this objective, we have thought fit and

necessary to exercise our plenary powers under Article 142 and direct the

Corporate Debtor into liquidation in the manner as laid down in the IBC, 2016.

Granting this relief to the Appellants would not run counter to the timelines

and predictability that is central to IBC. On the contrary, it would be in

furtherance of it. Ensuring that liquidation commences as soon as possible

would also be in the best interests of the Corporate Debtor and the creditors

including the workmen/employees who are yet to receive their rightful dues.

To be precise, it would not be necessary for the parties to again approach the

Adjudicating Authority for a determination under Section 33(3) of the IBC,

2016 on the ground that the provisions of the approved Resolution Plan have

been contravened.

F. SHORTCOMINGS AND SUGGESTIONS TO THE IBC, 2016.

166. This litigation is an eye opener for one and all and therefore, before we

close this matter, we deem it absolutely necessary to bring to light certain

deficiencies in the IBC, 2016 which require immediate attention. We would

also like to definitely say something as regards the functioning of the NCLTs

and NCLAT.

Civil Appeal Nos. 5023-5024 of 2024 Page 151 of 168

167. Given the importance of the IBC, 2016 for the betterment of the economy

at large, it is imperative that the insolvency ecosystem be continuously

strengthened through a regular identification of its shortcomings and a quick

redressal of its practical deficiencies. This would significantly improve its

implementation and yield better results for all the stakeholders involved.

While the receptiveness of the regime to the incorporation of novel and

relevant recommendations is important, it is paramount that there also be strict

adherence to the existing provisions of the Code, both in letter and spirit.

168. Scrupulous following of the provisions of the Code along with behavioural

and ethical discipline is especially required from the key participants of the

IBC who are central to its design i.e., the Adjudicating Authorities, Corporate

Debtor, Resolution Professionals, Committee of Creditors, potential and

Successful Resolution Applicants, Approved Valuers and Liquidators.

169. A Resolution Plan evolves through these players referred to above.

However, it is the “commercial wisdom of the CoC” that assumes a position

of superiority and becomes binding on all the stakeholders. The NCLT, which

is the adjudicating authority and who has to approve the Resolution Plan under

Section 31 of the IBC, 2016 also cannot trespass into the commercial wisdom

exercised by the CoC. This decision to restrict the scope of interference on the

commercial wisdom of the CoC was conscious and possibly taken bearing in

Civil Appeal Nos. 5023-5024 of 2024 Page 152 of 168

mind the time delays that may arise out of a subsequent adjudication of the

resolution plans approved by the CoC. Therefore, the commercial wisdom of

the CoC has achieved paramount status, immune from any judicial

intervention, to ensure the completion of the respective processes under the

IBC, 2016 within the timelines prescribed therein.

170. The position that the “commercial wisdom” of the CoC is non-justiciable

and only a limited judicial review is available in this regard is well-settled

through several decisions of this Court. This Court in the case of K

Shashidhar v. Indian Overseas Bank and Ors. reported in (2019) 12 SCC

150, held that:

“52. As aforesaid, upon receipt of a “rejected”

resolution plan the adjudicating authority (NCLT) is not

expected to do anything more; but is obligated to initiate

liquidation process under Section 33(1) of the I&B

Code. The legislature has not endowed the adjudicating

authority (NCLT) with the jurisdiction or authority to

analyse or evaluate the commercial decision of CoC

much less to enquire into the justness of the rejection of

the resolution plan by the dissenting financial creditors.

From the legislative history and the background in

which the I&B Code has been enacted, it is noticed that

a completely new approach has been adopted for

speeding up the recovery of the debt due from the

defaulting companies. In the new approach, there is a

calm period followed by a swift resolution process to be

completed within 270 days (outer limit) failing which,

initiation of liquidation process has been made

inevitable and mandatory. In the earlier regime, the

corporate debtor could indefinitely continue to enjoy the

protection given under Section 22 of the Sick Industrial

Companies Act, 1985 or under other such enactments

Civil Appeal Nos. 5023-5024 of 2024 Page 153 of 168

which has now been forsaken. Besides, the commercial

wisdom of CoC has been given paramount status

without any judicial intervention, for ensuring

completion of the stated processes within the timelines

prescribed by the I&B Code. There is an intrinsic

assumption that financial creditors are fully informed

about the viability of the corporate debtor and

feasibility of the proposed resolution plan. They act on

the basis of thorough examination of the proposed

resolution plan and assessment made by their team of

experts. The opinion on the subject-matter expressed by

them after due deliberations in CoC meetings through

voting, as per voting shares, is a collective business

decision. The legislature, consciously, has not provided

any ground to challenge the “commercial wisdom” of

the individual financial creditors or their collective

decision before the adjudicating authority. That is made

non-justiciable.”

(emphasis supplied)

171. Thus, there is no doubt that the commercial wisdom of the CoC cannot be

subjected to judicial review. However, in order to foster a much more effective

and time-bound decision making by the members of the CoC, in the interests

of maximization of value of the assets of the Corporate Debtor, certain self-

regulating guidelines were issued by the IBBI on 06.08.2024 with immediate

effect. The Guidelines for Committee of Creditors are reproduced

hereinbelow:

“6. Guidelines

A member of the CoC shall: -

Objectivity and Integrity

(a) follow relevant provisions of the Code and regulations, in

letter and spirit, while performing their roles and functions.

Civil Appeal Nos. 5023-5024 of 2024 Page 154 of 168

(b) maintain integrity in discharging their roles and functions as

envisioned under the Code.

(c) maintain objectivity during the decision-making process.

(d) foster informed decision making and share with the CoC/

Insolvency Professional any relevant information relating to

transactions, guarantees, recoveries, claims, etc. relating to

the corporate debtor

Independence and Impartiality

(e) disclose to the CoC/ Insolvency Professional the details of

any existing or potential conflict of interest arising due to

pecuniary, personal or professional relationship with any

stakeholder, immediately on becoming aware of it.

Professional Competence and Participation

(f) keep themselves updated with the provisions of the Code,

rules and regulations and the role and responsibilities

assigned thereunder.

(g) nominate representative with proper authorisation and

sufficient mandate to effectively participate in meetings. The

nominated representative may endeavour to obtain approval

of the competent authority, if required, at the earliest.

(h) participate actively, constructively and effectively in

deliberations and decision making of the CoC.

Co-operation, supervision and timeliness

(i) supervise and facilitate the Insolvency Professional in

discharging his duties under the Code.

(j) facilitate expeditious appointment of various professionals

within the timelines prescribed under the Code and

regulations.

(k) endeavour to resolve any inter-se disputes between the

members, particularly in relation to claims, preferably,

through dialogue, or other non-adversarial means, with a

view to avoid litigation to the extent possible.

Confidentiality

(l) ensure at all times complete adherence to the undertaking

regarding confidentiality of information.

Civil Appeal Nos. 5023-5024 of 2024 Page 155 of 168

Costs

(m) take necessary measures to ensure that the insolvency

resolution process cost is reasonable.

(n) expeditiously decide on all the expenses to be incurred by the

Insolvency Professional including the going concern

expenses of the corporate debtor and his fee.

(o) prudently fix the fee payable to the liquidator while deciding

to liquidate the corporate debtor.

Meeting of the CoC

(p) regularly monitor the activities of the Insolvency

Professional and seek rationale of decisions/actions taken by

him.

(q) diligently recommend for the inclusion or otherwise of the

belated claims collated by the Insolvency Professional and

categorised as acceptable, in the list of creditors and its

treatment in the resolution plan, if any.

(r) actively participate in the presentation of valuation

methodologies made by the Registered Valuers.

(s) ensure the conduct of the meeting at regular intervals as

specified in the regulations.

Sharing of information

(t) proactively share the latest financial statements, relevant

extract from the audits of the corporate debtor, conducted by

the creditors such as stock audit, transaction audit, forensic

audit, etc. and other relevant information available, with the

Insolvency Professional to enable efficient conduct of the

process.

(u) seek details of all litigation filed against or by the corporate

debtor from Insolvency Professional and recommend

necessary actions to Insolvency Professional to safeguard

the interest of the corporate debtor.

Feasibility and viability of corporate debtor

(v) carefully review and assess the information memorandum

prepared by Insolvency Professional and offer additional

insights.

Civil Appeal Nos. 5023-5024 of 2024 Page 156 of 168

(w) duly contribute to the preparation of the marketing strategy

by the Insolvency Professional and may also take measures

for marketing of the assets of the corporate debtor, if

necessary.

(x) ensure that all resolution plans as received by Insolvency

Professional are placed before CoC.

(y) suitably consider the requirement of a monitoring committee

for the implementation of the resolution plan.”

172. The aforesaid guidelines may go a long way in streamlining the functions

of the CoC. Adding to the aforesaid guidelines, we suggest that the CoC

exercise their commercial wisdom and approve/reject the Resolution Plans

placed before them exhibiting fairness and with good reasons. Such a reasoned

decision making on their part will only serve to further enable the other key

players like the Adjudicating Authorities to understand the rationale behind

their decision and to uphold the correctness of the same. Furthermore, it is also

suggested that the Central Government or the IBBI explore the possibilities of

better enforcement of the standards and practices enumerated in the guidelines

through an independent mechanism under the auspices of an oversight

committee instead of making them self-regulatory. This will enable the

guidelines to achieve some level of practical and operational relevance and

also prevent any significant lapse in decision making on the part of the CoC.

173. This litigation is an eye-opener also as regards the manner in which the

implementation of plans are handled by the Successful Resolution Applicant

Civil Appeal Nos. 5023-5024 of 2024 Page 157 of 168

and the Lenders involved in the process. Once a resolution plan is approved

under the IBC, 2016 the Successful Resolution Applicant undertakes a

profound responsibility to implement the plan in both letter and spirit. This

obligation is not merely an empty formality but an enduring commitment to

restore the corporate debtor to viability and ensure a meaningful turnaround.

The role of a Successful Resolution Applicant is thus far more than a

transactional duty towards the creditors or stakeholders; it embodies a pivotal

responsibility to the distressed entity itself, which must be approached with

utmost dedication and an earnest sense of duty. Regardless of the challenges

that may arise, the Successful Resolution Applicant cannot treat its obligations

as optional or conditional, nor can it abdicate its responsibility in the face of

unforeseen obstacles. Its efforts must reflect a determination to implement the

plan fully and to rejuvenate the debtor company, as this is integral to the

success of the IBC framework and the spirit of economic revival it seeks to

foster. The approach, therefore, must not be frugal or narrowly profit-driven,

limited to viewing the transaction through a purely commercial lens. Instead,

it must recognize that rescuing a distressed company is a responsibility of

significant social and economic value, demanding a holistic and responsible

strategy. This involves a dedication to long-term outcomes, where the

Successful Resolution Applicant adopts measures that genuinely support the

debtor’s rehabilitation, rather than making minimal or half-hearted attempts at

Civil Appeal Nos. 5023-5024 of 2024 Page 158 of 168

implementation. Courts and tribunals have consistently underscored that the

Successful Resolution Applicant’s role transcends commercial interest and

embodies a commitment to the larger purpose of corporate revival.

Consequently, it must make thoughtful and sustained efforts, demonstrating

adaptability and resilience even when faced with obstacles or operational

impediments. Simply put, the Successful Resolution Applicant cannot step

back or dismiss its obligations by attributing delays or setbacks to the conduct

of other stakeholders, as this would undermine the very purpose of insolvency

resolution.

174. In this collaborative effort, the duty to implement the plan does not fall on

the Successful Resolution Applicant alone; lenders and creditors are equally

obligated to support the process by offering constructive and continuous

cooperation. They must not impede the implementation process through

unnecessary demands beyond the pale of the resolution plan or with delays in

implementation plan but rather should facilitate the Successful Resolution

Applicant’s efforts to revive the corporate debtor. Given their vested interest

in the corporate debtor’s successful revival, lenders have a fundamental duty

to act in good faith and with transparency, recognizing that their cooperative

stance is essential for overcoming the inevitable challenges of the resolution

process. The lender's role is not merely passive; it requires active support that

Civil Appeal Nos. 5023-5024 of 2024 Page 159 of 168

aligns with the ultimate goal of the IBC, 2016 — to provide a fair and

equitable resolution that maximizes asset value while enabling the debtor’s

recovery.

175. Therefore, the lenders must balance their financial interests with the

broader objective of rehabilitation. They should not take an obstructive

approach or seek to leverage the resolution process solely for individual

benefit, as such actions would risk destabilizing the corporate debtor’s

recovery trajectory. Instead, they must be prepared to collaborate fully,

sharing the responsibility to make the resolution process work in practice.

Through a spirit of cooperation and shared purpose, the Successful Resolution

Applicant and lenders together can ensure that the corporate debtor is given

the best chance for revival and sustained growth, reflecting the Code’s intent

to rescue viable companies and protect broader economic interests.

176. The IBC, 2016 is silent as regards the phase of implementation of the

Resolution Plan by the Successful Resolution Applicant. This is mostly due to

the fact that each Resolution Plan might be unique and customized to the

specific needs of the Corporate Debtor and an excessive amount of statutory

control over the implementation of the Plan may prove to be

counterproductive to the cause of the Corporate Debtor. However, this has

unfortunately led to the consequence of giving excessive leeway to the

Civil Appeal Nos. 5023-5024 of 2024 Page 160 of 168

Successful Resolution Applicants to act in flagrant violation of the terms of

the Resolution Plan in a lackadaisical manner. The SRAs repeatedly approach

the Adjudicating Authority or the NCLAT for the grant of reliefs in relation

to relaxation of the strict compliance to the terms of the Plan, including the

timelines imposed therein. The NCLT and NCLAT more often than not,

accede to such requests in exercise of their inherent powers under Rule 11 or

their power to extend time under Rule 15 of the NCLT and NCLAT Rules,

2016 respectively. It is reiterated that the NCLT and NCLAT must not

entertain such repeated attempts at violating the integrity of a CoC approved

Resolution Plan by accommodating the incessant requests of the Successful

Resolution Applicants. The exercise of discretion as regards altering the

binding terms of the Resolution Plan, including the timelines imposed, must

be kept at a minimum, at best. The NCLTs/ NCLATs need to be sensitised of

not exercising their judicial discretion in extending the timelines fixed under

IBC, 2016 or the Resolution Plan, in such a way that it may make the Code

lose its effectiveness thereby rendering it obsolete.

177. Section 30(2)(d) of the IBC, 2016 states that the resolution professional

shall mandatorily examine each resolution plan that is received to confirm that

it provides for the implementation and supervision of the resolution plan.

Regulation 38 of the 2016 Regulations provides for the mandatory contents of

a Resolution Plan. Regulation 38(2) specifically states that the Resolution Plan

Civil Appeal Nos. 5023-5024 of 2024 Page 161 of 168

shall provide for the term of the plan and its implementation schedule, along

with adequate means for supervising its implementation. Further, under

Regulation 38(3), a resolution plan must demonstrate that it addresses the

cause of default, is feasible and viable, has provisions for its effective

implementation, has provisions for approvals required and the timelines for

the same and, that the resolution applicant has the capability to implement the

resolution plan. Therefore, in light of these provisions of the IBC, 2016 and

the 2016 Regulations, it can be seen that the resolution plan must be

impermeable to any shortcuts that prevent its implementation, including

timely implementation, by the successful resolution applicant. A

consideration of these provisions reinforces the idea that timely

implementation and strict adherence to the terms of the resolution plan is

crucial.

178. Furthermore, Section 74(3) of the IBC, 2016 provides for the punishment

for contravention of the resolution plan and reads as follows:

“(3) Where the corporate debtor, any of its officers or

creditors or any person on whom the approved resolution

plan is binding under section 31, knowingly and wilfully

contravenes any of the terms of such resolution plan or abets

such contravention, such corporate debtor, officer, creditor

or person shall be punishable with imprisonment of not less

than one year, but may extend to five years, or with fine

which shall not be less than one lakh rupees, but may extend

to one crore rupees, or with both.”

Civil Appeal Nos. 5023-5024 of 2024 Page 162 of 168

(emphasis supplied)

179. The Code comes down heavily on any knowing and willful contravention

of the terms of the Resolution Plan, committed by any person, on whom the

approved Resolution Plan has been made binding under Section 31 of the IBC,

2016. A punishment of minimum one year which may extend up to five years

or minimum fine of one Lakh which may be up to one Crore rupees, or both,

has been prescribed for such a contravention. In light of such strict

consequence provided for the contravention of the resolution plan envisaged

under the scheme of the Code itself, there is good reason for us to ensure that

the successful resolution applicants abide by their commitments made under

the Resolution Plan. Therefore, it is suggested that the authorities including

the NCLT and NCLAT must not aid the Successful Resolution Applicants in

circumventing the strict mandates of the law by acceding to their requests to

relax the terms of the plan itself.

180. One another suggestion at our end that may aid in a coordinated and non-

adversarial implementation of the Resolution Plan by all the stakeholders is

that the Adjudicating Authority while approving a Resolution Plan under

Section 31 of the IBC, 2016, should record the next steps which are to be taken

by the respective parties for commencement of implementation of the

approved Resolution Plan. This will ensure that the parties are ad idem about

Civil Appeal Nos. 5023-5024 of 2024 Page 163 of 168

the next round of their obligations that each of them is required to discharge

under the approved Resolution Plan and that they do not delay the

implementation by initiating any further litigation on this aspect. If such an

approach is adopted, the parties would be able to put forth any difficulty that

they might face in performing those next steps before the NCLT itself and

seek necessary relief in that regard. Recording the next steps that are to be

undertaken in the order of the Adjudicating Authority, will keep the parties

more vigilant since a non-performance of the obligation may lead to a

violation of the terms of the approved Resolution Plan and also violation of

the order approving the Resolution Plan as well.

181. As regards the implementation of the approved Resolution Plan, it is

suggested that the IBC, 2016 statutorily provide for the constitution of a

Monitoring Committee, once the plan has been approved, for a smooth

handover of the Corporate Debtor to the Successful Resolution Applicant.

Presently, such a provision is absent in the Code and it is the Adjudicating

Authority that orders for the constitution of a Monitoring Committee to ensure

smooth implementation of the Plan. The CoC must be empowered to

constitute the Monitoring Committee which may, by default, include the

Resolution Professional and also include other nominees from the CoC and

the Resolution Applicant respectively. Such a Monitoring Committee would

be entrusted with the powers of monitoring and supervising the resolution plan

Civil Appeal Nos. 5023-5024 of 2024 Page 164 of 168

till the expiry of the term of the Resolution Plan. The Committee shall also be

required to ensure all statutory compliances during the implementation of the

plan along with updating the Adjudicating Authorities, Financial and other

Creditors about the status of implementation of the Resolution Plan, on a

quarterly basis.

182. Moving on to certain efficiency issues within the NCLTs and NCLAT, it

has been noticed over a period of time that there is a serious lack of timely

admission and disposal of the applications filed as regards the initiation of

CIRP, approval of the resolution plan and liquidation. This only adds to the

uncertainty of the process and prolongs the dispute thereby jeopardizing the

interest of all the stakeholders involved. Adjudication in a time-bound manner

would help prevent any further deterioration of the value of the corporate

entity. The integrity of the original timelines laid down by the Code and the

Resolution Plan must not be allowed to be violated since it would dilute the

objective of the Code in its entirety, erode investor confidence and hinder all

corporate restructuring efforts.

183. The Members often lack the domain knowledge required to appreciate the

nuanced complexities involved in high-stake insolvency matters in order to

properly adjudicate such matters. It has been noticed that the benches of

NCLT(s) and NCLAT don’t have the practice of sitting for the full working

Civil Appeal Nos. 5023-5024 of 2024 Page 165 of 168

hours. They are particularly lacking in the capacity to manage the growing

number of cases and giving undivided attention required in such matters.

There are serious issues in the manner in which the insolvency matters are

listed. There is no effective system in place before the NCLTs for urgent

listings. The staff of the Registry is given wide power to list or not to list a

particular matter. One of the salutary objects of the Code, 2016 is to protect

the assets of the corporate entity in a timely manner and take prompt decisions,

however, it has become a practice of the NCLT(s) and NCLAT to ignore the

urgent mentionings and listings of time-sensitive matters and show no

deference to long-pending matters resulting in value erosion of the assets of

the Corporate Debtor and rendering their insolvency resolution process a

foregone conclusion. Over a period of time, this Court has noticed the growing

tendency amongst Members of the NCLT(s) and NCLAT to ignore the orders

of this Court or act in its defiance. We put the NCLT(s) and the NCLAT to

notice, that any act of contravention of this Court’s order and the larger rubric

of judicial propriety will not be tolerated. The NCLT(s) and the NCLAT must

seriously rethink their approach towards admission and disposal of insolvency

matters, they should not act as a mere rubberstamping authority and must take

their roles seriously in ensuring time-bound hearings and resolutions. Proper

and effective hearings, both virtually and in-court, must be given to insolvency

Civil Appeal Nos. 5023-5024 of 2024 Page 166 of 168

matters of public importance, and the NCLT(s) and NCLAT(s) must earnestly

work towards ensuring that the IBC, 2016 achieves its avowed object.

184. One another serious issue pertaining to the functioning of the NCLTs and

NCLAT is that there is often a shortage of members in the Tribunals and

inadequate infrastructure to support their functioning. These vacancies heavily

impact the insolvency reform initiative undertaken by the government since

they lead to operational inefficiencies. A shortfall of members and the lack of

requisite strength has led to Tribunals only sitting for a few days of the week

or a few hours in a day. Even in Tribunals where there is no vacancy, the

absence of requisite infrastructure has forced the benches to share courtrooms

or halls on a rotation basis. As a consequence, the strict timelines provided in

Section 12 of the IBC, 2016 are not complied with. Filling such vacancies with

experts having adequate domain knowledge in the field must be prioritized

along with addressing the infrastructure needs of the Tribunals to prevent any

adverse effect on the resolution process. There must be strict mandates

regarding the functioning of the Tribunals within its normal working hours.

The appointment of new members must be done in a manner such that it

coincides with the date of retirement of the sitting members in a seamless

manner to avoid such operational inefficiencies. Persons with high ideals &

impeccable integrity should be appointed as Members in the NCLT as well as

NCLAT. There should not be any political appointment.

Civil Appeal Nos. 5023-5024 of 2024 Page 167 of 168

185. It is now for the Parliament to look into our suggestions in consultation

with the Insolvency Bankruptcy Board of India and the Ministry of Finance.

G. CONCLUSION

186. For all the foregoing reasons, we have reached the conclusion that the

impugned order passed by the NCLAT is perverse and unsustainable in law.

It has led to further complications. As a result, the appeals succeed and are

allowed. The impugned order passed by the NCLAT is set aside.

187. In the peculiar and alarming circumstances as discussed in this judgment

and also keeping in mind the fact that almost five years have elapsed since the

Resolution Plan was duly approved by the NCLAT and there being no

progress worth the name, we are left with no other option but to invoke our

jurisdiction under Article 142 of the Constitution and direct that the Corporate

Debtor be taken in liquidation. The NCLT, Mumbai shall now take

appropriate steps for appointment of liquidator and all other necessary

formalities for commencement of liquidation of the Corporate Debtor.

188. The amount of Rs 200 Crore already infused by the SRA stands forfeited.

The Lenders/ Creditors are further permitted to encash the Performance Bank

Guarantee of Rs. 150 Crore furnished by the SRA. We accordingly order so.

Civil Appeal Nos. 5023-5024 of 2024 Page 168 of 168

189. These appeals are disposed of in the aforesaid terms.

190. The Registry shall forward one copy each of this judgment to the Principal

Secretary, Ministry of Finance, Government of India and the Chairperson,

Insolvency Bankruptcy Board of India with a request to look into this

judgment more particularly the suggestions made by this Court.

...................................................... CJI.

(Dr. Dhananjaya Y. Chandrachud)

.......................................................... J.

(J.B. Pardiwala)

.......................................................... J.

(Manoj Misra)

New Delhi;

November 7, 2024

Reference cases

Description

Legal Notes

Add a Note....

Advance Search Tool

💡 How to Get the Best Legal Answers:

1. Keep it simple: Frame your question in plain language.

2. Add scope: Tag @ a court, judge, year, or act section for accurate results.

3. Attach files: Upload a PDF only if you are using a private document.

🌍 Ask in your language: English • Hindi • Assamese • Bangla • Gujarati • Kannada • Malayalam • Marathi • Odia • Punjabi • Tamil • Telugu • Urdu